Permit #2019020286
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00010-0190 |
| CONDITIONED SPACE: 2632 sqft |
| GARAGE: 705 sqft |
| OPENED PORCH (WITH ROOF) : 331 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| Total Square Footage: 3740 sqft |
| Block: 00010 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 37 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/18/2019 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/25/2019 | APPROVED | MWILLIAMS |
| U-CROSS CONNECTION | 10/24/2019 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 10/24/2019 | APPROVED - AS NOTED | KHOWELL |
| Note: MASON WILL PUT BAHIA SOD AT THE END OF THE SIDEWALK AND BARE AREAS ALONG RIGHT SIDE AND CALL ME SO I CAN LOOK AT THIS AREAS | |||
| ROW - STORMWATER FINAL | 10/24/2019 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 10/24/2019 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/23/2019 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 10/23/2019 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 10/03/2019 | APPROVED - AS NOTED | RMARTIN |
| ROW- PRE-APRON (PRE-POUR) | 10/01/2019 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW- PAVER RESTRAINTS | 09/27/2019 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 09/27/2019 | PARTIALLY APPROVED | KHOWELL |
| Note: APRON AND SIDEWALK PAVER UPPER | |||
| U - SEWER TIE IN | 09/18/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 09/18/2019 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 08/12/2019 | APPROVED | MWILLIAMS |
| GAS ROUGH | 08/09/2019 | APPROVED | JGIBSON |
| INSULATION | 08/08/2019 | APPROVED | MWILLIAMS |
| ALL ROUGH | 08/05/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 07/17/2019 | APPROVED | MWILLIAMS |
| TIE BEAM / LINTEL | 07/16/2019 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 06/11/2019 | APPROVED | MWILLIAMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/10/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2019 | CANCELLED BY APPLICANT | WMILLER |
| Note: cancelled per Josh | |||
| ROOF SHEATHING | 05/22/2019 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 05/09/2019 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| TIE BEAM / LINTEL | 05/08/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) 2. MISSING VERTICLE REINFORCEMENT PER PLANS ALL marked on plans | |||
| ELECTRIC-TUG | 05/08/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 4:00 | |||
| TIE BEAM / LINTEL | 05/07/2019 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 04/30/2019 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/29/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 04/26/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. MISSING AND DISPLACED VERTICAL REINFORCEMENT 2. DOWN CELLS R609.1.4, ALL CELLS CONTAINING REINFORCEMENT SHALL BE GROUTED SOLID (CLEAN SOIL OUT OF FILLED CELLS) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/22/2019 | APPROVED | JGIBSON |
| FOOTER | 04/01/2019 | APPROVED | MWILLIAMS |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/03/2019 | 07/09/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 06/26/2019 | 07/02/2019 |
| Note: Held By: JHINDMAN 1 Revised plan is not for this house. | |||
| BLD | COMPLETE | 05/13/2019 | 05/20/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 04/29/2019 | 04/30/2019 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 02/08/2019 | 02/14/2019 |
| Note: Released By: RLEE | |||
| ELEC | COMPLETE | 02/08/2019 | 02/14/2019 |
| Note: Released By: RLEE | |||
| ENGIN1 | COMPLETE | 02/08/2019 | 02/11/2019 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 02/08/2019 | 02/14/2019 |
| Note: Released By: RLEE | |||
| PLUM | COMPLETE | 02/08/2019 | 02/14/2019 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 02/08/2019 | 02/14/2019 |
| Note: Released By: RLEE | |||
| UD1 | COMPLETE | 02/08/2019 | 02/11/2019 |
| Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 02/08/2019 | 02/11/2019 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| REINSPECTION FEE | ¤40.00 | 07/31/2019 |
| NEW RESIDENTIAL INSPECTIONS | ¤674.00 | 02/18/2019 |
| SITE PLAN 20 | ¤20.00 | 02/18/2019 |
| SURCHARGE FS 533.721 | ¤16.35 | 02/18/2019 |
| SURCHARGE - FS 468.631 | ¤24.53 | 02/18/2019 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/18/2019 |
| 3% TRANS IMPACT FEE CREDIT | (¤89.43) | 02/18/2019 |
| ADMIN FEE | ¤20.00 | 02/18/2019 |
| ELECTRIC FEE | ¤262.20 | 02/18/2019 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 02/18/2019 |
| IMPACT FEE FIRE | ¤223.38 | 02/18/2019 |
| IMPACT FEE PARKS | ¤849.24 | 02/18/2019 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/18/2019 |
| IMPACT FEE TRANSPORTATION | ¤2,981.00 | 02/18/2019 |
| MECHANICAL FEE | ¤262.20 | 02/18/2019 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/18/2019 |
| PLAN CHECK FEE | ¤134.80 | 02/18/2019 |
| PLUMBING FEE | ¤262.20 | 02/18/2019 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,368.29 |