Permit #2019020286

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00010-0190
CONDITIONED SPACE: 2632 sqft
GARAGE: 705 sqft
OPENED PORCH (WITH ROOF) : 331 sqft
OPENED PORCH (WITH ROOF) : 72 sqft
Total Square Footage: 3740 sqft
Block: 00010
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 37 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/18/2019
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0190
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
DAVID MILLER
Status Location Address State License Number Phone
CANCEL

2659 MERCY DRIVE

ORLANDO, FL 32808

06157 (Exp: 08/31/2024) 407-466-6514
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/25/2019 APPROVED MWILLIAMS
U-CROSS CONNECTION 10/24/2019 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 10/24/2019 APPROVED - AS NOTED KHOWELL
Note: MASON WILL PUT BAHIA SOD AT THE END OF THE SIDEWALK AND BARE AREAS ALONG RIGHT SIDE AND CALL ME SO I CAN LOOK AT THIS AREAS
ROW - STORMWATER FINAL 10/24/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 10/24/2019 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 10/23/2019 APPROVED KHOWELL
FINAL SURVEY (OFFICE USE ONLY) 10/23/2019 APPROVED KHOWELL
ELECTRIC - EARLY POWER 10/03/2019 APPROVED - AS NOTED RMARTIN
ROW- PRE-APRON (PRE-POUR) 10/01/2019 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW- PAVER RESTRAINTS 09/27/2019 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 09/27/2019 PARTIALLY APPROVED KHOWELL
Note: APRON AND SIDEWALK PAVER UPPER
U - SEWER TIE IN 09/18/2019 APPROVED JGIBSON
GRAVITY SEWER TEST 09/18/2019 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 08/12/2019 APPROVED MWILLIAMS
GAS ROUGH 08/09/2019 APPROVED JGIBSON
INSULATION 08/08/2019 APPROVED MWILLIAMS
ALL ROUGH 08/05/2019 APPROVED MWILLIAMS
TIE BEAM / LINTEL 07/17/2019 APPROVED MWILLIAMS
TIE BEAM / LINTEL 07/16/2019 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 06/11/2019 APPROVED MWILLIAMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/10/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/06/2019 CANCELLED BY APPLICANT WMILLER
Note: cancelled per Josh
ROOF SHEATHING 05/22/2019 APPROVED DROCKWELL
TIE BEAM / LINTEL 05/09/2019 APPROVED WMILLER
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 05/08/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. CLEARANCE FROM MASONRY (6TH EDITION) R606.3.4 MINIMUM WALL REINFORCING STEEL COVERAGE NOT MET (.75 INCH) 2. MISSING VERTICLE REINFORCEMENT PER PLANS ALL marked on plans
ELECTRIC-TUG 05/08/2019 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 4:00
TIE BEAM / LINTEL 05/07/2019 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 04/30/2019 APPROVED JHINDMAN
MONOLITHIC SLAB 04/29/2019 APPROVED MWILLIAMS
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 04/26/2019 Disapproved -FEE REQUIRED WMILLER
Note: 1. MISSING AND DISPLACED VERTICAL REINFORCEMENT 2. DOWN CELLS R609.1.4, ALL CELLS CONTAINING REINFORCEMENT SHALL BE GROUTED SOLID (CLEAN SOIL OUT OF FILLED CELLS)
PLUMBING 1ST ROUGH UNDERGROUND 04/22/2019 APPROVED JGIBSON
FOOTER 04/01/2019 APPROVED MWILLIAMS

Review History

Department Status Date In Date Out
BLD COMPLETE 07/03/2019 07/09/2019
Note: Released By: JHINDMAN
BLD HOLD 06/26/2019 07/02/2019
Note: Held By: JHINDMAN 1 Revised plan is not for this house.
BLD COMPLETE 05/13/2019 05/20/2019
Note: Released By: JHINDMAN
SW1 COMPLETE 04/29/2019 04/30/2019
Note: Released By: JHINDMAN
BLD COMPLETE 02/08/2019 02/14/2019
Note: Released By: RLEE
ELEC COMPLETE 02/08/2019 02/14/2019
Note: Released By: RLEE
ENGIN1 COMPLETE 02/08/2019 02/11/2019
Note: Released By: TBAKER
MECH COMPLETE 02/08/2019 02/14/2019
Note: Released By: RLEE
PLUM COMPLETE 02/08/2019 02/14/2019
Note: Released By: RLEE
SW1 COMPLETE 02/08/2019 02/14/2019
Note: Released By: RLEE
UD1 COMPLETE 02/08/2019 02/11/2019
Note: Released By: MBACON Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 02/08/2019 02/11/2019
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/31/2019
REINSPECTION FEE ¤40.00 07/31/2019
NEW RESIDENTIAL INSPECTIONS ¤674.00 02/18/2019
SITE PLAN 20 ¤20.00 02/18/2019
SURCHARGE FS 533.721 ¤16.35 02/18/2019
SURCHARGE - FS 468.631 ¤24.53 02/18/2019
STORM WATER PERMIT FEES ¤80.00 02/18/2019
3% TRANS IMPACT FEE CREDIT (¤89.43) 02/18/2019
ADMIN FEE ¤20.00 02/18/2019
ELECTRIC FEE ¤262.20 02/18/2019
3% FIRE IMPACT FEE CREDIT (¤6.70) 02/18/2019
IMPACT FEE FIRE ¤223.38 02/18/2019
IMPACT FEE PARKS ¤849.24 02/18/2019
IMPACT FEE SCHOOL ¤3,600.00 02/18/2019
IMPACT FEE TRANSPORTATION ¤2,981.00 02/18/2019
MECHANICAL FEE ¤262.20 02/18/2019
3% PARKS IMPACT FEE CREDIT (¤25.48) 02/18/2019
PLAN CHECK FEE ¤134.80 02/18/2019
PLUMBING FEE ¤262.20 02/18/2019
Fees Total Due: ¤0.00 Total Paid: ¤9,368.29