I want to search for...
Permit #2020010157
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00010-0180 |
| CONDITIONED SPACE: 2443 sqft |
| CONDITIONED SPACE: 269 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00010 |
| Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA |
| Job Phone: 863-420-2100 |
| Location Address: 35 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/24/2020 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
DAVID MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
2659 MERCY DRIVE ORLANDO, FL 32808 |
06157 (Exp: 08/31/2024) | 407-466-6514 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/13/2020 | FINAL APPROVED | MMESSER |
| U -UTILITY RESIDENTIAL FINAL | 08/11/2020 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 08/10/2020 | FINAL APPROVED | KHOWELL |
| U-CROSS CONNECTION | 08/10/2020 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 08/10/2020 | APPROVED | KHOWELL |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/07/2020 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 08/07/2020 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 07/31/2020 | APPROVED - AS NOTED | JMUNSON |
| Note: Emailed FPL at 9:05 am | |||
| ROW- PRE-APRON (PRE-POUR) | 07/24/2020 | APPROVED | KHOWELL |
| ROW- PAVER RESTRAINTS | 07/21/2020 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 07/21/2020 | PARTIALLY APPROVED | KHOWELL |
| Note: APRON,SIDEWALK AND RESTRAINT POUR PAVER DRIVEWAY. STRAIGHTEN OUT THE SIDEWALK FORM BOARDS THEY ARE UP, DOWN IN AND OUT | |||
| U - SEWER TIE IN | 06/30/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 06/30/2020 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/22/2020 | APPROVED | FWILLIS |
| INSULATION | 06/15/2020 | APPROVED | JDELBONIS |
| ALL ROUGH | 06/10/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION no bond wire on gas line no 5 foot head preshur on drain lines need nail plates on water lines in master bath at soffets 6/10/2020 above items are fixed gas approved at all rough | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/10/2020 | APPROVED | JDELBONIS |
| Note: THIS IS A REINSPECTION TABLE R803.1 roof sheating more than 24 inches | |||
| ALL ROUGH | 06/02/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: no bond wire on gas line no 5 foot head preshur on drain lines need nail plates on water lines in master bath at soffets | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/02/2020 | Disapproved -FEE REQUIRED | JDELBONIS |
| Note: TABLE R803.1 roof sheating more than 24 inches | |||
| ROOF VALLEY & METAL | 04/22/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 04/22/2020 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 2:15 | |||
| ROOF SHEATHING | 04/16/2020 | APPROVED | JDELBONIS |
| ELECTRIC-TUG | 04/06/2020 | Disapproved - NO FEE | RMARTIN |
| Note: SERVICE GROUNDING ELECTRODE CONDUCTOR NOT CONNECTED NEC 230 AND 250 | |||
| TIE BEAM / LINTEL | 03/10/2020 | APPROVED | JDELBONIS |
| FOUND SURVEY APPROVED (OFFICE) | 03/09/2020 | APPROVED | AMUDRYK |
| MONOLITHIC SLAB | 02/27/2020 | APPROVED | JDELBONIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/24/2020 | APPROVED | JGIBSON |
| FOOTER | 02/10/2020 | APPROVED | JDELBONIS |
| WATER METER INSTALLATION REQUEST | 02/03/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 03/06/2020 | 03/09/2020 |
| Note: Released By: AMUDRYK | |||
| MECH | COMPLETE | 01/21/2020 | 01/22/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 01/17/2020 | 01/17/2020 |
| Note: Released By: PBUCKLEY | |||
| BLD | COMPLETE | 01/07/2020 | 01/09/2020 |
| Note: Released By: JPI 1. Please complete the project header of the energy calculations. The submittal requires to be project specific. 2. Add label with note at garage walls. R302.5.2 Duct penetration. Ducts in the garage and ducts penetrating the walls or ceilings separating the dwelling from the garage shall be constructed of a minimum No. 26 gage (0.48 mm) sheet steel, 1 inch (25.4 mm) minimum rigid nonmetallic Class 0 or Class 1 duct board, or other approved material and shall not have openings into the garage. 3. Provide safety device at water heater (tap and thermal expansion device). Add note. P607.3. 4. Please add the label for a Vacuum Breaker on the hose bib. (R2902.4) | |||
| CUSVC | COMPLETE | 01/07/2020 | 01/09/2020 |
| Note: Released By: HHAND Fees were originally paid on 11/16/18 for $865.86, receipt #: 11826355. The only thing builder must pay now is the difference between the old rates and the new rates. | |||
| ELEC | COMPLETE | 01/07/2020 | 01/09/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 01/07/2020 | 01/08/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 01/07/2020 | 01/14/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 01/07/2020 | 01/08/2020 |
| Note: Held By: CPISCITELLI Design Location on Energy calcs needs to be closer to Palm Coast. I.E., Daytona Beach or St. Augustine. | |||
| PLUM | HOLD | 01/07/2020 | 01/09/2020 |
| Note: Held By: JPI | |||
| SW1 | COMPLETE | 01/07/2020 | 01/09/2020 |
| Note: Released By: CTROHA | |||
| UD1 | COMPLETE | 01/07/2020 | 01/14/2020 |
| Note: Released By: AHALL | |||
| ZON | COMPLETE | 01/07/2020 | 01/07/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 08/11/2020 |
| REINSPECTION FEE | ¤40.00 | 08/11/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤708.00 | 01/24/2020 |
| SITE PLAN 20 | ¤20.00 | 01/24/2020 |
| SURCHARGE FS 533.721 | ¤15.65 | 01/24/2020 |
| SURCHARGE - FS 468.631 | ¤23.48 | 01/24/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/24/2020 |
| SEWER INSPECTION | ¤25.00 | 01/24/2020 |
| SEWER INSPECTION | (¤25.00) | 01/24/2020 |
| 01/24/2020 | ||
| METER - DEPOSIT | ¤60.00 | 01/24/2020 |
| METER - DEPOSIT | (¤60.00) | 01/24/2020 |
| WATER-METER | (¤412.87) | 01/24/2020 |
| WATER-METER | (¤342.99) | 01/24/2020 |
| WATER-METER | ¤434.59 | 01/24/2020 |
| WATER-METER | ¤361.04 | 01/24/2020 |
| ADMIN FEE | ¤20.00 | 01/24/2020 |
| CONNECTION FEES | (¤25.00) | 01/24/2020 |
| CONNECTION FEES | ¤25.00 | 01/24/2020 |
| ELECTRIC FEE | ¤272.40 | 01/24/2020 |
| IMPACT FEE FIRE | ¤223.38 | 01/24/2020 |
| IMPACT FEE PARKS | ¤849.24 | 01/24/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/24/2020 |
| IMPACT FEE TRANSPORTATION | ¤3,059.00 | 01/24/2020 |
| MECHANICAL FEE | ¤272.40 | 01/24/2020 |
| PLAN CHECK FEE | ¤141.60 | 01/24/2020 |
| PLUMBING FEE | ¤272.40 | 01/24/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,677.32 |