I want to search for...

Permit #2020100024

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00480-0130
CONDITIONED SPACE: 2286 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
OPENED PORCH (WITH ROOF) : 307 sqft
GARAGE: 588 sqft
Total Square Footage: 3235 sqft
Block: 00480
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 904-268-7730
Location Address: 99 FRONTIER DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/15/2020
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: MARONDA HOMES INC

Address

5220 SHAD RD STE 202

JACKSONVILLE, FL 32257

Lot: 0130
Contracted Stated Job Value: ¤130,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN

Contractor

MARONDA HOMES
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

,

CRC056762 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113
MICHAEL LEE RAFFENSBERGER
Status Location Address State License Number Phone Fax
CANCEL

7725 SANDSCOVE CT

WINTER PARK, FL 32792

CAC1819723 (Exp: 08/31/2024) 407-629-6920 407-629-9307
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
ANDREW SCOTT DIGAETANO JR
Status Location Address State License Number Phone
ACTIVE

44 FORT CAROLINE

PALM COAST, FL 32137

CCC1331606 (Exp: 08/31/2026) 386-302-9063

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/20/2021 FINAL APPROVED BGREVE
U -UTILITY RESIDENTIAL FINAL 04/20/2021 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 04/19/2021 APPROVED KRUTH
ROW - STORMWATER FINAL 04/19/2021 APPROVED KRUTH
ROW - FINAL APRON (AFTER POUR) 04/19/2021 APPROVED KRUTH
FINAL SURVEY (OFFICE USE ONLY) 04/19/2021 APPROVED KRUTH
U-CROSS CONNECTION 04/16/2021 APPROVED DHANEY
U - SEWER TIE IN 03/23/2021 APPROVED JGIBSON
ELECTRIC - EARLY POWER 03/18/2021 APPROVED - AS NOTED RMARTIN
Note: EMAILED FPL RELEASED POWER 10:35
ROW- PRE-APRON (PRE-POUR) 03/09/2021 APPROVED - AS NOTED KRUTH
Note: the end of the pipe is bent it will need some fixing before pouring concrete It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
INSULATION 02/16/2021 APPROVED JBODEN
LATH/BRICK/ WATER BARRIER 02/10/2021 APPROVED FWILLIS
ALL ROUGH 02/10/2021 APPROVED FWILLIS
ROOF VALLEY & METAL 02/01/2021 APPROVED WMILLER
Note: THIS IS A REINSPECTION missing valley lining (left front) VALLEY FLASHING, R905.2.8.2 02-01-21... DEFICIENCIES NOTED ABOVE RESOLVED
ROOF VALLEY & METAL 01/29/2021 Disapproved - NO FEE WMILLER
Note: missing valley lining (left front) VALLEY FLASHING, R905.2.8.2
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/26/2021 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 12/21/2020 APPROVED TBAKER
TIE BEAM / LINTEL 12/08/2020 APPROVED WMILLER
MONOLITHIC SLAB 11/20/2020 APPROVED TSTAUFFACHER
GRAVITY SEWER TEST 11/19/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 11/19/2020 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 11/17/2020 CANCELLED BY APPLICANT JGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 11/17/2020 CANCELLED BY APPLICANT JGIBSON
WATER METER INSTALLATION REQUEST 10/29/2020 APPROVED CSTONE

Review History

Department Status Date In Date Out
ZON COMPLETE 12/18/2020 12/18/2020
Note: Released By: TDOAK
ENGIN1 COMPLETE 12/18/2020 12/21/2020
Note: Released By: TBAKER
MECH COMPLETE 10/12/2020 10/12/2020
Note: Released By: CPISCITELLI
SWALE COMPLETE 10/02/2020 11/19/2020
Note: Released By: TBAKER
BLD COMPLETE 10/01/2020 10/06/2020
Note: Released By: JPI
CUSVC COMPLETE 10/01/2020 10/02/2020
Note: Released By: HHAND
ELEC COMPLETE 10/01/2020 10/02/2020
Note: Released By: JMUNSON
ENGIN1 COMPLETE 10/01/2020 10/02/2020
Note: Released By: TBAKER
LOCATE COMPLETE 10/01/2020 10/07/2020
Note: Released By: CSTONE
MECH HOLD 10/01/2020 10/02/2020
Note: Held By: CPISCITELLI 1, R403.7.1.2.1 FBC Energy Conservation 2017 6TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated.
PLUM COMPLETE 10/01/2020 10/06/2020
Note: Released By: JPI
SW1 COMPLETE 10/01/2020 10/05/2020
Note: Released By: CTROHA
UTL COMPLETE 10/01/2020 10/08/2020
Note: Released By: LFITZGERALD
ZON COMPLETE 10/01/2020 10/02/2020
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
METER - DEPOSIT ¤60.00 10/15/2020
WATER- TURN ON ¤25.00 10/15/2020
ADMIN FEE ¤20.00 10/15/2020
CONNECTION FEES ¤1,002.88 10/15/2020
BUILDING DISCOUNT 100% (¤1,430.60) 10/15/2020
ELECTRIC FEE ¤235.80 10/15/2020
3% FIRE IMPACT FEE CREDIT (¤6.70) 10/15/2020
IMPACT FEE FIRE ¤223.38 10/15/2020
IMPACT FEE PARKS ¤849.24 10/15/2020
IMPACT FEE SCHOOL ¤3,600.00 10/15/2020
IMPACT FEE TRANSPORTATION ¤1,674.00 10/15/2020
MECHANICAL FEE ¤235.80 10/15/2020
WATER -IRRIGATION INSPECTION ¤25.00 10/15/2020
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/15/2020
PLAN CHECK FEE ¤117.20 10/15/2020
PLUMBING FEE ¤235.80 10/15/2020
NEW RESIDENTIAL INSPECTIONS ¤586.00 10/15/2020
SITE PLAN 20 ¤20.00 10/15/2020
SURCHARGE FS 533.721 ¤2.00 10/15/2020
SURCHARGE - FS 468.631 ¤2.00 10/15/2020
STORM WATER PERMIT FEES ¤80.00 10/15/2020
3% TRANS IMPACT FEE CREDIT (¤50.22) 10/15/2020
SEWER INSPECTION ¤25.00 10/15/2020
SEWER CAPITAL FACILITY ¤4,596.07 10/15/2020
WATER CAPITAL FACILITY FEE ¤3,374.18 10/15/2020
Fees Total Due: ¤0.00 Total Paid: ¤15,476.35