I want to search for...
Permit #2020100024
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00480-0130 |
| CONDITIONED SPACE: 2286 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| OPENED PORCH (WITH ROOF) : 307 sqft |
| GARAGE: 588 sqft |
| Total Square Footage: 3235 sqft |
| Block: 00480 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 904-268-7730 |
| Location Address: 99 FRONTIER DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/15/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES INC |
|
Address 5220 SHAD RD STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤130,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/20/2021 | FINAL APPROVED | BGREVE |
| U -UTILITY RESIDENTIAL FINAL | 04/20/2021 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/19/2021 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 04/19/2021 | APPROVED | KRUTH |
| ROW - FINAL APRON (AFTER POUR) | 04/19/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 04/19/2021 | APPROVED | KRUTH |
| U-CROSS CONNECTION | 04/16/2021 | APPROVED | DHANEY |
| U - SEWER TIE IN | 03/23/2021 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 03/18/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 10:35 | |||
| ROW- PRE-APRON (PRE-POUR) | 03/09/2021 | APPROVED - AS NOTED | KRUTH |
| Note: the end of the pipe is bent it will need some fixing before pouring concrete It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| INSULATION | 02/16/2021 | APPROVED | JBODEN |
| LATH/BRICK/ WATER BARRIER | 02/10/2021 | APPROVED | FWILLIS |
| ALL ROUGH | 02/10/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 02/01/2021 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION missing valley lining (left front) VALLEY FLASHING, R905.2.8.2 02-01-21... DEFICIENCIES NOTED ABOVE RESOLVED | |||
| ROOF VALLEY & METAL | 01/29/2021 | Disapproved - NO FEE | WMILLER |
| Note: missing valley lining (left front) VALLEY FLASHING, R905.2.8.2 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2021 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 12/21/2020 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/08/2020 | APPROVED | WMILLER |
| MONOLITHIC SLAB | 11/20/2020 | APPROVED | TSTAUFFACHER |
| GRAVITY SEWER TEST | 11/19/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/19/2020 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 11/17/2020 | CANCELLED BY APPLICANT | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/17/2020 | CANCELLED BY APPLICANT | JGIBSON |
| WATER METER INSTALLATION REQUEST | 10/29/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 12/18/2020 | 12/18/2020 |
| Note: Released By: TDOAK | |||
| ENGIN1 | COMPLETE | 12/18/2020 | 12/21/2020 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 10/12/2020 | 10/12/2020 |
| Note: Released By: CPISCITELLI | |||
| SWALE | COMPLETE | 10/02/2020 | 11/19/2020 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/01/2020 | 10/06/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/01/2020 | 10/07/2020 |
| Note: Released By: CSTONE | |||
| MECH | HOLD | 10/01/2020 | 10/02/2020 |
| Note: Held By: CPISCITELLI 1, R403.7.1.2.1 FBC Energy Conservation 2017 6TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated. | |||
| PLUM | COMPLETE | 10/01/2020 | 10/06/2020 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 10/01/2020 | 10/05/2020 |
| Note: Released By: CTROHA | |||
| UTL | COMPLETE | 10/01/2020 | 10/08/2020 |
| Note: Released By: LFITZGERALD | |||
| ZON | COMPLETE | 10/01/2020 | 10/02/2020 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 10/15/2020 |
| WATER- TURN ON | ¤25.00 | 10/15/2020 |
| ADMIN FEE | ¤20.00 | 10/15/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/15/2020 |
| BUILDING DISCOUNT 100% | (¤1,430.60) | 10/15/2020 |
| ELECTRIC FEE | ¤235.80 | 10/15/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/15/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/15/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/15/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/15/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/15/2020 |
| MECHANICAL FEE | ¤235.80 | 10/15/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/15/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/15/2020 |
| PLAN CHECK FEE | ¤117.20 | 10/15/2020 |
| PLUMBING FEE | ¤235.80 | 10/15/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤586.00 | 10/15/2020 |
| SITE PLAN 20 | ¤20.00 | 10/15/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/15/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/15/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/15/2020 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/15/2020 |
| SEWER INSPECTION | ¤25.00 | 10/15/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/15/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/15/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,476.35 |