I want to search for...
Permit #2020100896
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00650-0040 |
| CONDITIONED SPACE: 2286 sqft |
| GARAGE: 588 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| OPENED PORCH (WITH ROOF) : 307 sqft |
| Total Square Footage: 3235 sqft |
| Block: 00650 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 904-268-7730 |
| Location Address: 6 LINCOLN PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/30/2020 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: MARONDA HOMES LLC |
|
Address 5220 SHAD ROAD JACKSONVILLE, FL 32257 |
|
Address STE 202 JACKSONVILLE, FL 32257 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤135,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
MARONDA HOMES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY , |
CRC056762 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/20/2021 | FINAL APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH NO EVIDENCE OF TERMITE TREATMENT OR NOTICE OF INTENT TO TREAT, R318.1.7 MOULDING SAGGING AT TOP OF GARAGE DOOR. | |||
| BLD - BUILDING FINAL | 05/19/2021 | Disapproved - NO FEE | FWILLIS |
| Note: ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH NO EVIDENCE OF TERMITE TREATMENT OR NOTICE OF INTENT TO TREAT, R318.1.7 MOULDING SAGGING AT TOP OF GARAGE DOOR. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/19/2021 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 05/10/2021 | APPROVED | KRUTH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/10/2021 | APPROVED | KRUTH |
| ROW - STORMWATER FINAL | 05/10/2021 | APPROVED | KRUTH |
| FINAL SURVEY (OFFICE USE ONLY) | 05/10/2021 | APPROVED | KRUTH |
| ELECTRIC - EARLY POWER | 05/10/2021 | APPROVED - AS NOTED | RMARTIN |
| Note: EMAILED FPL RELEASED POWER 11:30 | |||
| U - SEWER TIE IN | 04/29/2021 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 03/30/2021 | APPROVED - AS NOTED | KRUTH |
| Note: THIS IS A REINSPECTION not ready for inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist READY TO POUR upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete | |||
| ROW- PRE-APRON (PRE-POUR) | 03/29/2021 | Disapproved -FEE REQUIRED | KRUTH |
| Note: not ready for inspection | |||
| U-CROSS CONNECTION | 03/18/2021 | APPROVED - AS NOTED | DHANEY |
| Note: Approved No IRR. No Cross CN. | |||
| INSULATION | 03/05/2021 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 03/01/2021 | APPROVED | FWILLIS |
| INSULATION | 02/24/2021 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 02/23/2021 | APPROVED - AS NOTED | CSTONE |
| Note: Dumpster will need to move | |||
| ALL ROUGH | 02/22/2021 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 02/19/2021 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/09/2021 | APPROVED - AS NOTED | FWILLIS |
| Note: Hanger on Lanai (HJC26) Missing Nails. Will Inspect on Next Inspection. | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/13/2021 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/23/2020 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 12/15/2020 | APPROVED | FWILLIS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 12/14/2020 | CANCELLED BY APPLICANT | FWILLIS |
| Note: Rescheduling for in the Morning. Waiting for Compaction Testing. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/11/2020 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 12/11/2020 | APPROVED | JGIBSON |
| WATER METER INSTALLATION REQUEST | 11/12/2020 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 01/12/2021 | 01/13/2021 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 01/12/2021 | 01/12/2021 |
| Note: Released By: AMOBLEY | |||
| ZON | COMPLETE | 10/28/2020 | 10/29/2020 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 10/28/2020 | 10/28/2020 |
| Note: Released By: KRUTH KWR 10/28/2020 THE SLOPES HAVE BEEN ADJUSTED TO A 5% GRADE | |||
| ENGIN1 | COMPLETE | 10/28/2020 | 10/29/2020 |
| Note: Released By: TBAKER | |||
| SWALE | COMPLETE | 10/21/2020 | 01/11/2021 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 10/20/2020 | 10/24/2020 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/20/2020 | 10/21/2020 |
| Note: Released By: HHAND | |||
| ELEC | COMPLETE | 10/20/2020 | 10/23/2020 |
| Note: Released By: JMUNSON | |||
| ENGIN1 | COMPLETE | 10/20/2020 | 10/21/2020 |
| Note: Released By: TBAKER | |||
| LOCATE | COMPLETE | 10/20/2020 | 10/23/2020 |
| Note: Released By: CSTONE | |||
| MECH | COMPLETE | 10/20/2020 | 10/21/2020 |
| Note: Released By: CPISCITELLI | |||
| PLUM | COMPLETE | 10/20/2020 | 10/24/2020 |
| Note: Released By: JPI | |||
| SW1 | HOLD | 10/20/2020 | 10/26/2020 |
| Note: Held By: CTROHA Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. Rear of the house only 3 tenths | |||
| ZON | HOLD | 10/20/2020 | 10/21/2020 |
| Note: Held By: AMOBLEY Floor plan shows a 3 car garage with a garage door on the single car side. Elevation page shows a window there. Please correct whichever is incorrect. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤40.00 | 05/19/2021 |
| 3% TRANS IMPACT FEE CREDIT | (¤50.22) | 10/30/2020 |
| SEWER CREDIT | (¤907.65) | 10/30/2020 |
| SEWER INSPECTION | ¤25.00 | 10/30/2020 |
| SEWER CAPITAL FACILITY | ¤4,596.07 | 10/30/2020 |
| WATER CAPITAL FACILITY FEE | ¤3,374.18 | 10/30/2020 |
| METER - DEPOSIT | ¤60.00 | 10/30/2020 |
| WATER- TURN ON | ¤25.00 | 10/30/2020 |
| ADMIN FEE | ¤20.00 | 10/30/2020 |
| CONNECTION FEES | ¤1,002.88 | 10/30/2020 |
| BUILDING DISCOUNT 100% | (¤767.00) | 10/30/2020 |
| ELECTRIC FEE | ¤141.00 | 10/30/2020 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.70) | 10/30/2020 |
| IMPACT FEE FIRE | ¤223.38 | 10/30/2020 |
| IMPACT FEE PARKS | ¤849.24 | 10/30/2020 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/30/2020 |
| IMPACT FEE TRANSPORTATION | ¤1,674.00 | 10/30/2020 |
| MECHANICAL FEE | ¤141.00 | 10/30/2020 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/30/2020 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/30/2020 |
| PLAN CHECK FEE | ¤54.00 | 10/30/2020 |
| PLUMBING FEE | ¤141.00 | 10/30/2020 |
| NEW RESIDENTIAL INSPECTIONS | ¤270.00 | 10/30/2020 |
| SITE PLAN 20 | ¤20.00 | 10/30/2020 |
| SURCHARGE FS 533.721 | ¤2.00 | 10/30/2020 |
| SURCHARGE - FS 468.631 | ¤2.00 | 10/30/2020 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/30/2020 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,608.70 |