Permit #2021020339

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7002-00010-0190
Block: 00010
Subdivision: 2218 - SECTION 2-FLORIDA PARK
Job Phone: 386-237-8637
Location Address: 37 FARRADAY LN
Type: DR - DRIVEWAY
Issue Date: 02/12/2021
NOC: RECORDED
Applicant name: ERIC GLENN SAMUELSON
Owner: WILLIAMS, BRIAN

Address

37 FARRADAY LANE

PALM COAST, FL 32137

Lot: 0190
Contracted Stated Job Value: ¤17,200.00
Job Description: DRIVEWAY MODIFICATION
Type: CN

Contractor

OUTBACK MARINE CONSTRUCTION
Status Location Address State License Number Phone
ACTIVE

597 JOHN ANDERSON HWY

FLAGLER BEACH, FL 32181

CBC1257381 (Exp: 08/31/2026) 386-237-8637

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 08/05/2021 FINAL APPROVED DHANEY
ROW- PAVER RESTRAINTS 08/02/2021 APPROVED KRUTH
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 08/02/2021 APPROVED KRUTH
ROW - FINAL INSPECTION 08/02/2021 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 06/28/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PAVER RESTRAINTS 06/28/2021 PARTIALLY APPROVED KRUTH
MONOLITHIC SLAB 03/17/2021 APPROVED BGREVE
Note: THIS IS A REINSPECTION new to existing conrete floor typical tie in detail calls for #5 bars at 32"'s on center with 6"embedment. bars not spaced per detail and two bars pulled out of existing footing/concrete floor
MONOLITHIC SLAB 03/15/2021 Disapproved - NO FEE BGREVE
Note: new to existing conrete floor typical tie in detail calls for #5 bars at 32"'s on center with 6"embedment. bars not spaced per detail and two bars pulled out of existing footing/concrete floor

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 02/04/2021 02/11/2021
Note: Released By: TBAKER
UTL COMPLETE 02/04/2021 02/10/2021
Note: Released By: LFITZGERALD
ZON COMPLETE 02/04/2021 02/05/2021
Note: Released By: TDOAK
BLD COMPLETE 02/04/2021 02/11/2021
Note: Released By: FREODICA

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 02/12/2021
BUILDING DISCOUNT 100% (¤20.00) 02/12/2021
RECORDING FEE REIMBURSE DOC ¤44.00 02/12/2021
SITE PLAN 20 ¤20.00 02/12/2021
SURCHARGE FS 533.721 ¤2.00 02/12/2021
SURCHARGE - FS 468.631 ¤2.00 02/12/2021
STORM WATER PERMIT FEES ¤40.00 02/12/2021
Fees Total Due: ¤0.00 Total Paid: ¤108.00