Permit #2021061643

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7011-00020-0640
Block: 00020
Subdivision: 2193 - SECTION 11-BELLE TERRE
Job Phone: 386-793-6919
Location Address: 68 BERKSHIRE LN
Type: DR - DRIVEWAY
Issue Date: 08/09/2021
NOC: RECORDED
Applicant name: BRIAN A RUTHERFORD
Owner: DEMERS WILLIAM R & SHARON ANN GALLAGHER-DEMERS H&W

Address

68 BERKSHIRE LANE

PALM COAST, FL 32137

Lot: 0640
Contracted Stated Job Value: ¤8,000.00
Job Description: REPLACE CONCRETE DRIVEWAY
Type: CN

Contractor

CREATIVE TOUCH CONCRETE SURFACING, LLC
Status Location Address Phone
ACTIVE

1 CARDWELL COURT

PALM COAST, FL 32137

386-793-6919

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 09/20/2021 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 09/16/2021 APPROVED KRUTH
ROW - FINAL INSPECTION 09/16/2021 APPROVED KRUTH
ROW- PRE-APRON (PRE-POUR) 08/18/2021 APPROVED - AS NOTED KRUTH
Note: pipe is good at the time of the inspection It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete.
ROW- PRE-APRON (PRE-POUR) 08/17/2021 CANCELLED BY APPLICANT KRUTH
Note: THIS IS A REINSPECTION
ROW- PRE-APRON (PRE-POUR) 08/16/2021 CANCELLED BY APPLICANT KRUTH

Review History

Department Status Date In Date Out
ZON COMPLETE 07/06/2021 07/06/2021
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/06/2021 07/07/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 07/06/2021 07/06/2021
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/29/2021 07/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 06/29/2021 07/06/2021
Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 06/29/2021 06/29/2021
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show that front entry walkway is not wider than 6ft at the entry of house or that it will meet the minimum 25ft front setback on site plan.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 08/09/2021
BUILDING DISCOUNT 100% (¤20.00) 08/09/2021
SITE PLAN 20 ¤20.00 08/09/2021
SURCHARGE FS 533.721 ¤2.00 08/09/2021
SURCHARGE - FS 468.631 ¤2.00 08/09/2021
STORM WATER PERMIT FEES ¤40.00 08/09/2021
Fees Total Due: ¤0.00 Total Paid: ¤64.00