I want to search for...
Permit #2021071420
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00080-0100 |
| CONDITIONED SPACE: 1818 sqft |
| GARAGE: 398 sqft |
| OPENED PORCH (WITH ROOF) : 109 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| Total Square Footage: 2368 sqft |
| Block: 00080 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 321-249-3126 |
| Location Address: 108 FORT CAROLINE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/13/2021 |
| NOC: RECORDED |
| Applicant name: MOREY C DOYLE |
| Owner: WJH LLC |
|
Address 3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤109,080.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
WADE JURNEY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
3091 GOVERNORS LAKE DRIVE NORCROSS, GA 30071 |
CGC1517458 (Exp: 08/31/2022) | 321-249-3126 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
EDWIN R INSALACO
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
3191 MAGUIRE BLVD ORLANDO, FL 32803 |
STE 200 ORLANDO, FL 32803 |
EC13001310 (Exp: 08/31/2024) | 321-441-7990 | 407-426-9741 |
MICHAEL LEE RAFFENSBERGER
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
7725 SANDSCOVE CT WINTER PARK, FL 32792 |
CAC1819723 (Exp: 08/31/2024) | 407-629-6920 | 407-629-9307 |
DANIEL P GREGOIRE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
64 W. CENTRAL AVENUE LAKE WALES, FL 33853 |
CFC057378 (Exp: 08/31/2024) | (863)696-3737 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 08/26/2022 | FINAL APPROVED | EMADISON |
| Note: ** BEFORE ROW FINAL IS APPROVED: ** 08/26/22 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION ** 08/25/22 NEED TO REMOVE PORTA- JOHN FROM SWALE ON LEFT SIDE | |||
| U -UTILITY RESIDENTIAL FINAL | 08/26/2022 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/25/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** 07/27/22 CORRECTIONS WERE MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION READY TO POUR ** OVER POUR IN FRONT OF THE GARAGE NEEDS TO BE CHIPPED AWAY AS 4 INCHES OF CONCRETE IS REQUIRED ABOVE ROW. SITE NOT READY TO POUR | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2022 | APPROVED - AS NOTED | EMADISON |
| Note: ** BEFORE ROW FINAL IS APPROVED: ** 08/25/22 NEED TO REMOVE PORTA- JOHN FROM SWALE ON LEFT SIDE | |||
| ROW - FINAL APRON (AFTER POUR) | 08/25/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** BEFORE ROW FINAL IS APPROVED: ** 08/25/22 NEED TO REMOVE PORTA- JOHN FROM SWALE ON LEFT SIDE | |||
| BLD - BUILDING FINAL | 08/23/2022 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 08/09/2022 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 07/27/2022 | APPROVED - AS NOTED | EMADISON |
| Note: THIS IS A REINSPECTION ** 07/27/22 CORRECTIONS WERE MADE EVERYTHING LOOKS GOOD AT THE TIME OF THE INSPECTION READY TO POUR ** OVER POUR IN FRONT OF THE GARAGE NEEDS TO BE CHIPPED AWAY AS 4 INCHES OF CONCRETE IS REQUIRED ABOVE ROW. SITE NOT READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 07/26/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** OVER POUR IN FRONT OF THE GARAGE NEEDS TO BE CHIPPED AWAY AS 4 INCHES OF CONCRETE IS REQUIRED ABOVE ROW. SITE NOT READY TO POUR | |||
| ELECTRIC-TUG | 07/18/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 06/01/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 05/20/2022 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 05/18/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 05/11/2022 | APPROVED | TBAKER |
| ROOF VALLEY & METAL | 05/11/2022 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 04/06/2022 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 04/05/2022 | APPROVED - AS NOTED | JHARDING |
| Note: THIS IS A REINSPECTION No Water meter installed yet. No house yet, only empty/cleared lot. No irrigation, no cross connections. | |||
| U - SEWER TIE IN | 04/05/2022 | APPROVED | MGIBSON |
| WALL SHEATHING | 02/24/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 02/16/2022 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 02/01/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/27/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 01/10/2022 | APPROVED | TCHURCHILL |
| Note: THIS IS A REINSPECTION ADDED ON 12/14/2021 9:22:43 AM THIS IS A REINSPECTION ADDED ON 11/23/2021 12:26:24 PM lot not cleared Lot not cleared as of 12/7 | |||
| U-CROSS CONNECTION | 12/07/2021 | Disapproved - NO FEE | DHANEY |
| Note: No Water meter installed yet. No house yet, only empty/cleared lot. | |||
| WATER METER INSTALLATION REQUEST | 12/07/2021 | Disapproved - NO FEE | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 11/23/2021 12:26:24 PM lot not cleared Lot not cleared as of 12/7 | |||
| WATER METER INSTALLATION REQUEST | 11/18/2021 | Disapproved - NO FEE | CSTONE |
| Note: lot not cleared |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 08/23/2022 | 08/23/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Uploaded doc is not clear and not sure exaclty what it is?? Pleae re scan and clarify... | |||
| ENGIN1 | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/06/2021 | 08/06/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/06/2021 | 08/12/2021 |
| Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/06/2021 | 08/09/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/29/2021 | 08/02/2021 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/29/2021 | 08/05/2021 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/29/2021 | 08/02/2021 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/29/2021 | 07/29/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/29/2021 | 08/03/2021 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/29/2021 | 07/30/2021 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/29/2021 | 08/03/2021 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM wrong document needs to be a topo site plan | |||
| ZON | COMPLETE | 07/29/2021 | 07/30/2021 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/29/2021 | 10/28/2021 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 07/29/2021 | 07/29/2021 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey has no benchmark or centerline of road elevations. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| METER - DEPOSIT | ¤60.00 | 08/13/2021 |
| WATER- TURN ON | ¤25.00 | 08/13/2021 |
| ADMINISTRATIVE RESIDENTIAL | ¤20.00 | 08/13/2021 |
| PLAN REVIEW - RESIDENTIAL | ¤89.60 | 08/13/2021 |
| CONNECTION FEES | ¤1,017.83 | 08/13/2021 |
| BUILDING DISCOUNT 100% | (¤109.60) | 08/13/2021 |
| IMPACT FEE FIRE | ¤367.00 | 08/13/2021 |
| IMPACT FEE PARKS | ¤1,199.12 | 08/13/2021 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/13/2021 |
| IMPACT FEE TRANSPORTATION | ¤1,718.00 | 08/13/2021 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/13/2021 |
| SITE PLAN 20 | ¤20.00 | 08/13/2021 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/13/2021 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/13/2021 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/13/2021 |
| SEWER CREDIT | (¤850.00) | 08/13/2021 |
| SEWER INSPECTION | ¤25.00 | 08/13/2021 |
| SEWER CAPITAL FACILITY | ¤4,664.55 | 08/13/2021 |
| WATER CAPITAL FACILITY FEE | ¤3,424.45 | 08/13/2021 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,379.95 |