I want to search for...
Permit #2022011255
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-1660 |
| CONDITIONED SPACE: 2401 sqft |
| GARAGE: 495 sqft |
| OPENED PORCH (WITH ROOF) : 250 sqft |
| OPENED PORCH (WITH ROOF) : 41 sqft |
| Total Square Footage: 3187 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-313-6221 |
| Location Address: 351 HIBISCUS WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/11/2022 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: GOLD COAST HOME BUILDERS INC |
|
Address PO BOX 354707 PALM COAST, FL 32135 |
| Lot: 1660 |
| Contracted Stated Job Value: ¤425,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 03/01/2023 | FINAL APPROVED | PFLANAGAN |
| Note: 2/28/2023 - PREVIOUS INSPECTION NOTES NEED TO PICK UP ALL CONSTRUCTION DEBRIS AND TRASH IN LOT AND LOTS TO THE LEFT | |||
| U -UTILITY RESIDENTIAL FINAL | 02/28/2023 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 02/28/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO PICK UP ALL CONSTRUCTION DEBRIS AND TRASH IN LOT AND LOTS TO THE LEFT | |||
| WATER METER INSTALLATION REQUEST | 02/28/2023 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 02/28/2023 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 02/27/2023 | FINAL APPROVED | AGAETANO |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/24/2023 | APPROVED | PFLANAGAN |
| Note: 2/21/2023 - PREVIOUS INSPECTION NOTES CAN'T HAVE ANY MULCH IN THE DRAINAGE CONVEYANCE NEED TO REMOVE AND PUT ROCK OR NEED TO HAVE TWO ROWS OF SOD AROUND THE MULCH SO IT STAYS IN PLACE DURING RAIN | |||
| ROW - FINAL APRON (AFTER POUR) | 02/24/2023 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/21/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/21/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: CAN'T HAVE ANY MULCH IN THE DRAINAGE CONVEYANCE NEED TO REMOVE AND PUT ROCK OR NEED TO HAVE TWO ROWS OF SOD AROUND THE MULCH SO IT STAYS IN PLACE DURING RAIN | |||
| ELECTRIC - EARLY POWER | 12/15/2022 | APPROVED | AGAETANO |
| ROW- PRE-APRON (PRE-POUR) | 11/07/2022 | APPROVED | EMADISON |
| Note: ** 11/07/22 RREADY TO SET PAVERS 11/4/2022 - PREVIOUS INSPECTION NOTES 11/04/22 READY TO SPREAD AND COMPACT PAVER BASE ** SCHEDULE NEXT PRE-POUR AFTER BASEHAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL AFTER NEXT PRE-POUR HAS BEEN APPROVED 11/3/2022 - PREVIOUS INSPECTION NOTES ** 11/03/22 OVER POUR STILL NEEDS TO BE REMOVED CHIPPED AWAY FROM INFRONT OF GARAGE DOOR ** SITE IS NOT COMPLETELY PREPPED FOR THE INSPECTION, ASINDICATED TO BUILDER WHEN WE MET ON SITE OF LAST INSPECTION. 10/27/2022 - PREVIOUS INSPECTION NOTES 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 OVER POUR IN FRONT OF GARAGE NEEDS TO BE CHIPPED AWAY APRON AREA IS NOT READY AS CONCRETE IS BEING REMOVED FROM EDGE OF APRON | |||
| ROW- PRE-APRON (PRE-POUR) | 11/04/2022 | PARTIALLY APPROVED | EMADISON |
| Note: 11/04/22 READY TO SPREAD AND COMPACT PAVER BASE ** SCHEDULE NEXT PRE-POUR AFTER BASEHAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL AFTER NEXT PRE-POUR HAS BEEN APPROVED 11/3/2022 - PREVIOUS INSPECTION NOTES ** 11/03/22 OVER POUR STILL NEEDS TO BE REMOVED CHIPPED AWAY FROM INFRONT OF GARAGE DOOR ** SITE IS NOT COMPLETELY PREPPED FOR THE INSPECTION, ASINDICATED TO BUILDER WHEN WE MET ON SITE OF LAST INSPECTION. 10/27/2022 - PREVIOUS INSPECTION NOTES 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 OVER POUR IN FRONT OF GARAGE NEEDS TO BE CHIPPED AWAY APRON AREA IS NOT READY AS CONCRETE IS BEING REMOVED FROM EDGE OF APRON | |||
| ROW- PRE-APRON (PRE-POUR) | 11/03/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/03/22 OVER POUR STILL NEEDS TO BE REMOVED CHIPPED AWAY FROM INFRONT OF GARAGE DOOR ** SITE IS NOT COMPLETELY PREPPED FOR THE INSPECTION, ASINDICATED TO BUILDER WHEN WE MET ON SITE OF LAST INSPECTION. 10/27/2022 - PREVIOUS INSPECTION NOTES 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 OVER POUR IN FRONT OF GARAGE NEEDS TO BE CHIPPED AWAY APRON AREA IS NOT READY AS CONCRETE IS BEING REMOVED FROM EDGE OF APRON | |||
| ROW- PRE-APRON (PRE-POUR) | 10/27/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 OVER POUR IN FRONT OF GARAGE NEEDS TO BE CHIPPED AWAY APRON AREA IS NOT READY AS CONCRETE IS BEING REMOVED FROM EDGE OF APRON | |||
| ROW- PAVER RESTRAINTS | 10/27/2022 | APPROVED | EMADISON |
| Note: ** 10/27/22 READY TO POUR PAVER RESTRAINTS 10/26/2022 - PREVIOUS INSPECTION NOTES ** 10/26/22 SITE NOT READY WORK BEING DONE | |||
| ROW- PAVER RESTRAINTS | 10/26/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/26/22 SITE NOT READY WORK BEING DONE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/26/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/26/22 OVER POUR IN FRONT OF GARAGE NEEDS TO BE CHIPPED AWAY APRON AREA IS NOT READY AS CONCRETE IS BEING REMOVED FROM EDGE OF APRON | |||
| U - SEWER TIE IN | 09/13/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/13/2022 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS IS A REINSPECTION Please have water water pressure gauge on the distribution line. 3/21/22 DOES NOT NEED GAUGE ON CITY PRESSURE | |||
| INSULATION | 08/22/2022 | APPROVED | AGAETANO |
| LATH/BRICK/ WATER BARRIER | 08/16/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 08/04/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/03/2022 | APPROVED | FWILLIS |
| Note: Left side of entry way at the corner has missing nails. Superintendent on site and will resolve the issue. Check at next inspection. | |||
| ROOF VALLEY & METAL | 06/29/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING | 06/15/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: A couple shiners on the left side of the building. Superintendent on site and will resolve the issue. | |||
| WALL SHEATHING | 06/15/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Left side of entry way at the corner has missing nails. Superintendent on site and will resolve the issue. Check at next inspection. | |||
| DOWN CELL | 06/15/2022 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 06/15/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 05/03/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 04/22/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Down cells not exposed at front of home. Noted on the drawings. | |||
| TIE BEAM / LINTEL | 04/20/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Down cells not exposed at front of home. Noted on the drawings. | |||
| MONOLITHIC SLAB | 03/22/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/21/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please have water water pressure gauge on the distribution line. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/21/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION Please have water water pressure gauge on the distribution line. 3/21/22 DOES NOT NEED GAUGE ON CITY PRESSURE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | COMPLETE | 02/23/2023 | 02/23/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO BLOWER DOOR.PDF | |||
| BLD | COMPLETE | 10/17/2022 | 10/17/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/27/2022 | 05/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/03/2022 | 05/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/03/2022 | 05/03/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | REJECT | 02/07/2022 | 02/07/2022 |
| Note: Rejected By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/07/2022 | 02/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/03/2022 | 02/07/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: Second Request Provide approval specification sheet per F.S. 553.842: 1. FL 7849.21 - for tile roof and FL 5259.1 - for roof underlayment shown on Roofing Worksheet do not match with FL Nos. on Product approval specification sheet. 2. FL 104656.6 - for wood connectors is incorrect. Please delete as we need only one (1) correct FL No 10441.1. | |||
| BLD | HOLD | 01/28/2022 | 01/31/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide approval specification sheet per F.S. 553.842: 1. FL 7849.21 - for tile roof and FL 5259.1 - for roof underlayment shown on Roofing Worksheet do not match with FL Nos. on Product approval specification sheet. 2. FL 104656.6 - for wood connectors is incorrect. Please delete as we need only one (1) correct FL No 10441.1. | |||
| CUSVC | COMPLETE | 01/28/2022 | 02/01/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/28/2022 | 01/31/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/28/2022 | 01/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/28/2022 | 02/02/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/28/2022 | 01/31/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/28/2022 | 02/02/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/28/2022 | 01/31/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 01/28/2022 | 02/01/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/01/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/27/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/27/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/27/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/27/2023 |
| CONNECTION FEES | ¤25.00 | 02/11/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 02/11/2022 |
| IMPACT FEE FIRE | ¤388.65 | 02/11/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 02/11/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 02/11/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 02/11/2022 |
| SURCHARGE FS 533.721 | ¤16.00 | 02/11/2022 |
| SURCHARGE - FS 468.631 | ¤24.00 | 02/11/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/11/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/11/2022 |
| SW ENG PRE APRON | ¤30.00 | 02/11/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/11/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/11/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 02/11/2022 |
| SEWER INSPECTION | ¤25.00 | 02/11/2022 |
| SITE PLAN 30 | ¤30.00 | 02/11/2022 |
| METER - DEPOSIT | ¤60.00 | 02/11/2022 |
| WATER-METER | ¤467.09 | 02/11/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/11/2022 |
| INSPECTION - RESIDENTIAL | ¤1,168.75 | 02/11/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤331.50 | 02/11/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,188.09 |