I want to search for...

Permit #2022081436

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-0660
CONDITIONED SPACE: 2251 sqft
GARAGE: 712 sqft
OPENED PORCH (WITH ROOF) : 263 sqft
OPENED PORCH (WITH ROOF) : 39 sqft
Total Square Footage: 3265 sqft
Block: 01010
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-313-6221
Location Address: 132 MARSH ELDER SQ
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/16/2022
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: WASH, RONALD & THERESA

Address

PO BOX 1537

SHARPSBURG, GA 30277

Lot: 66
Contracted Stated Job Value: ¤475,000.00
Job Description: SINGLE FAMILY RESIDENTIAL
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
PATRICK FRANCIS MCADAMS
Status Location Address State License Number Phone Fax
ACTIVE

1201 South Flagler Ave

Flagler Beach, FL 32136

CFC057805 (Exp: 08/31/2026) 386-283-9236 321-248-0447
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
WILLIAM D ALLEN
Status Location Address State License Number Phone Fax
INACTIVE

546 S. SHELL ROAD

DEBARY, FL 32713

LQ27843 (Exp: 08/13/2024) 386-668-9592 (386)668-8577
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/16/2024 Disapproved - NO FEE AGAETANO
Note: 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/24- Please obtain a revision of energy calcs for equipment installed. (dont Match). Please post Insulation certificate with signature at Attic access. R303.1.1.2 Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 12-29-2022 Flat tle roof indicated. Batons not nstalled on roof. Please provide details if batons are not to be installed. 02-09-2023 1. Mid point bracing for piping. 2. Missing shield plates at kitchen water lines and drain. SHGC not matching. Calcs indicate .18 and Window sticker is .20. Please revise and submit to the building department. 02-16-2023 Please have revised energy calcs on site for all inspections to avoid any future fees. 02-17-2023 Back SGD needs to be installed or area covered to proceed with drywall and future insulation inspections. 02-16-2024 AHU breaker size does not match breaker in electrical panel.
BLD - BUILDING FINAL 02/16/2024 FINAL APPROVED AGAETANO
Note: 2/16/2024 - PREVIOUS INSPECTION NOTES 2/14/2024 - PREVIOUS INSPECTION NOTES 2/14/24- Please obtain a revision of energy calcs for equipment installed. (dont Match). Please post Insulation certificate with signature at Attic access. R303.1.1.2 Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 12-29-2022 Flat tle roof indicated. Batons not nstalled on roof. Please provide details if batons are not to be installed. 02-09-2023 1. Mid point bracing for piping. 2. Missing shield plates at kitchen water lines and drain. SHGC not matching. Calcs indicate .18 and Window sticker is .20. Please revise and submit to the building department. 02-16-2023 Please have revised energy calcs on site for all inspections to avoid any future fees. 02-17-2023 Back SGD needs to be installed or area covered to proceed with drywall and future insulation inspections. 02-16-2024 AHU breaker size does not match breaker in electrical panel. 02-16-2024 Inspector returned.
U-CROSS CONNECTION 02/14/2024 APPROVED DHANEY
BLD - BUILDING FINAL 02/14/2024 Disapproved - NO FEE JSTEWART
Note: 2/14/24- Please obtain a revision of energy calcs for equipment installed. (dont Match). Please post Insulation certificate with signature at Attic access. R303.1.1.2 Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 12-29-2022 Flat tle roof indicated. Batons not nstalled on roof. Please provide details if batons are not to be installed. 02-09-2023 1. Mid point bracing for piping. 2. Missing shield plates at kitchen water lines and drain. SHGC not matching. Calcs indicate .18 and Window sticker is .20. Please revise and submit to the building department. 02-16-2023 Please have revised energy calcs on site for all inspections to avoid any future fees. 02-17-2023 Back SGD needs to be installed or area covered to proceed with drywall and future insulation inspections.
ROW - FINAL APRON (AFTER POUR) 02/14/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/14/2024 APPROVED - AS NOTED EMADISON
Note: ** 02/13/24 NEED TO REPAIR WASH OUT AT POP-UP DRAIN LEFT REAR DRAINS NEED TO BE INSTALLED SO THEY SIT ON TOP OF SOD NOT UNDERNEATH ** IRRIGATION BOX LEFT REAR NEEDS TO BE REPLACED AS BUSTED AND LEFT HOLE IN GROUND
ROW - STORMWATER FINAL 02/14/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 02/14/2024 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/13/2024 APPROVED EMADISON
GAS FINAL 10/27/2023 APPROVED MGIBSON
Note: 10/10/2023 - PREVIOUS INSPECTION NOTES
GAS ROUGH 10/10/2023 CANCELLED BY APPLICANT WEB
GAS ROUGH 10/10/2023 APPROVED MGIBSON
GAS FINAL 10/10/2023 CANCELLED BY APPLICANT MGIBSON
ROW- PRE-APRON (PRE-POUR) 06/05/2023 APPROVED EMADISON
Note: ** 06/05/23 READY TO SET PAVERS ____________________________________________________________________________________________________________________ 4/19/2023 - PREVIOUS INSPECTION NOTES ** 04/19/23 READY FOR PAVER BASE TO BE SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION OF BASE HAS BEEN APPROVED ______________________________________________________________________________________________________________________ 4/12/2023 - PREVIOUS INSPECTION NOTES ** 04/12/23 NEED TO CHIP AWAY OVER POUR CONCRETE IN AREA OF GARAGE DOORS CURRENTLY ITS TO HIGH WITH THE OVER POUR HIGH LIGHTED WITH PINK PAINT. _________________________________________________________________________________________________________________________
ELECTRIC - EARLY POWER 06/01/2023 APPROVED - AS NOTED AGAETANO
Note: 5/31/2023 - PREVIOUS INSPECTION NOTES 05-31-2023 Master bath has three lights that are not saffed off. 06-01-2023 FPL notified at 10:00
ELECTRIC - EARLY POWER 05/31/2023 Disapproved - NO FEE AGAETANO
Note: 05-31-2023 Master bath has three lights that are not safed off.
ROW- PRE-APRON (PRE-POUR) 04/19/2023 PARTIALLY APPROVED EMADISON
Note: ** 04/19/23 READY FOR PAVER BASE TO BE SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION OF BASE HAS BEEN APPROVED ______________________________________________________________________________________________________________________ 4/12/2023 - PREVIOUS INSPECTION NOTES ** 04/12/23 NEED TO CHIP AWAY OVER POUR CONCRETE IN AREA OF GARAGE DOORS CURRENTLY ITS TO HIGH WITH THE OVER POUR HIGH LIGHTED WITH PINK PAINT. _________________________________________________________________________________________________________________________
ROW- PAVER RESTRAINTS 04/12/2023 APPROVED EMADISON
Note: ** 04/12/23 PAVER RESTRAINTS ARE READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW- PRE-APRON (PRE-POUR) 04/12/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/12/23 NEED TO CHIP AWAY OVER POUR CONCRETE IN AREA OF GARAGE DOORS CURRENTLY ITS TO HIGH WITH THE OVER POUR HIGH LIGHTED WITH PINK PAINT. _________________________________________________________________________________________________________________________
INSULATION 02/17/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 12-29-2022 Flat tle roof indicated. Batons not nstalled on roof. Please provide details if batons are not to be installed. 02-09-2023 1. Mid point bracing for piping. 2. Missing shield plates at kitchen water lines and drain. SHGC not matching. Calcs indicate .18 and Window sticker is .20. Please revise and submit to the building department. 02-16-2023 Please have revised energy calcs on site for all inspections to avoid any future fees. 02-17-2023 Back SGD needs to be installed or area covered to proceed with drywall and future insulation inspections.
LATH/BRICK/ WATER BARRIER 02/16/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 12-29-2022 Flat tle roof indicated. Batons not nstalled on roof. Please provide details if batons are not to be installed. 02-09-2023 1. Mid point bracing for piping. 2. Missing shield plates at kitchen water lines and drain. SHGC not matching. Calcs indicate .18 and Window sticker is .20. Please revise and submit to the building department. 02-16-2023 Please have revised energy calcs on site for all inspections to avoid any future fees.
ALL ROUGH 02/09/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2467 12-29-2022 Flat tle roof indicated. Batons not nstalled on roof. Please provide details if batons are not to be installed. 02-09-2023 1. Mid point bracing for piping. 2. Missing shield plates at kitchen water lines and drain. SHGC not matching. Calcs indicate .18 and Window sticker is .20. Please revise and submit to the building department.
GAS ROUGH 01/25/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 01/12/2023 APPROVED MGIBSON
U - SEWER TIE IN 01/12/2023 APPROVED MGIBSON
ROOF VALLEY & METAL 12/29/2022 APPROVED - AS NOTED AGAETANO
Note: 12-29-2022 Flat tle roof indicated. Batons not nstalled on roof. Please provide details if batons are not to be installed.
WALL SHEATHING 12/22/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/22/2022 APPROVED AGAETANO
ELECTRIC-TUG 12/13/2022 APPROVED AGAETANO
DOWN CELL 11/29/2022 CANCELLED BY INSPECTOR LMILLER
Note: this is looked at durring the roof sheathing braces ties and down cell inspection.
TIE BEAM / LINTEL 11/17/2022 APPROVED AGAETANO
FOUND SURVEY APPROVED (OFFICE) 11/15/2022 APPROVED TBAKER
MONOLITHIC SLAB 10/25/2022 APPROVED AGAETANO
Note: 10/24/2022 - PREVIOUS INSPECTION NOTES
MONOLITHIC SLAB 10/24/2022 CANCELLED BY APPLICANT AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 10/21/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/17/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 02/15/2024 02/15/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/01/2023 06/02/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH HOLD 02/16/2023 02/16/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Revise line item 7 windows on Energy Calcs to match the .20 SHGC on window breakdown
MECH COMPLETE 02/16/2023 02/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 02/15/2023 02/15/2023
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO ENERGY CALCS.PDF
BLD COMPLETE 12/22/2022 12/22/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 11/23/2022 11/29/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/15/2022 11/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/15/2022 11/15/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 10/04/2022 10/06/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Per Table R803.2.2, 19/32 minimum sheathing is required. Windspeed per the engineers RFI is greater than 130 mph.
BLD HOLD 09/16/2022 09/19/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. The wind design for The City of Palm Coast is 130 MPH. Per Table R803.2.2, the minimum allowed roof sheathing is 15/32 for exposure ‘C’. For the 155 mph exposure ‘C’ design per the engineers letter, minimum is 19/32.
MECH COMPLETE 09/09/2022 09/09/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 09/06/2022 09/06/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH HOLD 09/06/2022 09/06/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated. (Second Request) 2. Energy Calcs need to be signed by the builder
ELEC COMPLETE 09/06/2022 09/06/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
URB COMPLETE 08/30/2022 09/01/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
BLD COMPLETE 08/25/2022 08/31/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 08/25/2022 08/29/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC HOLD 08/25/2022 08/26/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in master bedroom. NEC 2017 210.52
ENGIN1 COMPLETE 08/25/2022 08/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 08/25/2022 08/31/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 08/25/2022 08/26/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition- Chosen equipment exceeds the maximum of 1.15 times the load calculated. 2. Provide duct layout signed by the AC contractor
SW1 COMPLETE 08/25/2022 09/01/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON HOLD 08/25/2022 08/30/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show rear and left side setback from the house to property line and not the pool deck. We have to review that the house meets the 3ft setback on the left side.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/31/2024
PLAN REVIEW - REVISION ¤32.50 01/31/2024
PLAN REVIEW - REVISION ¤32.50 01/31/2024
CONTRACTOR CHANGE ¤20.00 01/31/2024
SW ENG REINSPECTION 30 ¤30.00 01/31/2024
SW ENG - REVIEW 20 ¤20.00 09/16/2022
SW ENG RES REVIEW 200 ¤200.00 09/16/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 09/16/2022
SEWER INSPECTION ¤25.00 09/16/2022
SITE PLAN 30 ¤30.00 09/16/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 09/16/2022
IMPACT FEE FIRE ¤388.65 09/16/2022
IMPACT FEE PARKS ¤1,455.13 09/16/2022
IMPACT FEE SCHOOL ¤3,600.00 09/16/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 09/16/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 09/16/2022
SURCHARGE FS 533.721 ¤5.26 09/16/2022
SURCHARGE - FS 468.631 ¤7.89 09/16/2022
SW ENG - FOUNDATION SURVEY ¤20.00 09/16/2022
SW ENG INSPECTION 80 ¤80.00 09/16/2022
SW ENG PRE APRON ¤30.00 09/16/2022
CONNECTION FEES ¤25.00 09/16/2022
WATER-METER ¤467.09 09/16/2022
ADJUSTMENT 50% (¤853.38) 09/16/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/16/2022
INSPECTION - RESIDENTIAL ¤1,306.25 09/16/2022
PLAN REVIEW - RESIDENTIAL ¤370.50 09/16/2022
Fees Total Due: ¤0.00 Total Paid: ¤10,426.86