I want to search for...
Permit #2023011500
Permit Details
Status: COED
| Parcel Id: 05-11-31-5918-00000-1170 |
| CONDITIONED SPACE: 2388 sqft |
| GARAGE: 507 sqft |
| OPENED PORCH (WITH ROOF) : 630 sqft |
| OPENED PORCH (WITH ROOF) : 65 sqft |
| Total Square Footage: 3590 sqft |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: 386-447-4400 |
| Location Address: 72 LONGVIEW WAY N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/08/2023 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: ROSS CLARK B & MAY YOEUNG JTWROS |
|
Address 7503 MARITIME LANE SPRINGFIELD, VA 22153 |
| Lot: 1170 |
| Contracted Stated Job Value: ¤645,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOHN HAWKINS SASSER
| Status | Location Address | State License Number | Phone |
| INACTIVE |
150 HILDEN ROAD #308 , 0 |
CAC051487 (Exp: 08/31/2024) | 904-823-9696 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/05/2024 | FINAL APPROVED | AWATERS |
| ROW - STORMWATER FINAL | 02/22/2024 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 2/20/2024 - PREVIOUS INSPECTION NOTES ** 02/2024 BUILDER STILL NEEDS TO MOVE DRAIN FROM EDGE OF CURB AND GUTTER ON LEFT SIDE AWAY FROM THE CURB AS INDICATED IN PREVIOUS FIELD SURVEY INSPECTION ** BUILDER ALSO NEED TO REMOVE THE DRAIN SOCK AND CLEAN CATCH BASIN ON LEFT SIDE CURB AND GUTTER ____________________________________________________________________________________________________________________ ** 02/13/24 BEFORE STORM WATER FINAL ** LEFT SIDE (2) GUTTER DRAINS POP-UPS AT CURB AND CORNER OF DRIVEWAY NEEDS TO BE MOVED BACK TO HIGH LIGHTED LOCATION ON GRASS, ALSO NEED TO SEPERATE THEM SO THEY ARE SPACED APART **LEFT SIDE (2) GUTTER DRAINS POP-UPS AT REAR CORNER OF PROPERTYNEEDS TO BE MOVED SEPERATE THEM SO THEY ARE SPACED APART ** LEFT SIDE ALONG PROPERTY LINE TWO (2) LOW SPOTS HIGH LIGHTED NEED TO BE REPAIRED AS THEY WILL HOLD WATER. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/20/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW - STORMWATER FINAL | 02/20/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 02/2024 BUILDER STILL NEEDS TO MOVE DRAIN FROM EDGE OF CURB AND GUTTER ON LEFT SIDE AWAY FROM THE CURB AS INDICATED IN PREVIOUS FIELD SURVEY INSPECTION ** BUILDER ALSO NEED TO REMOVE THE DRAIN SOCK AND CLEAN CATCH BASIN ON LEFT SIDE CURB AND GUTTER ____________________________________________________________________________________________________________________ ** 02/13/24 BEFORE STORM WATER FINAL ** LEFT SIDE (2) GUTTER DRAINS POP-UPS AT CURB AND CORNER OF DRIVEWAY NEEDS TO BE MOVED BACK TO HIGH LIGHTED LOCATION ON GRASS, ALSO NEED TO SEPERATE THEM SO THEY ARE SPACED APART **LEFT SIDE (2) GUTTER DRAINS POP-UPS AT REAR CORNER OF PROPERTYNEEDS TO BE MOVED SEPERATE THEM SO THEY ARE SPACED APART ** LEFT SIDE ALONG PROPERTY LINE TWO (2) LOW SPOTS HIGH LIGHTED NEED TO BE REPAIRED AS THEY WILL HOLD WATER. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/14/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 pond irrigation set up in rear of all houses-as discussed with Rocky--try to have pink valve box flush with sod so not a trip hazard | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/13/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/13/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/13/24 BEFORE STORM WATER FINAL ** LEFT SIDE (2) GUTTER DRAINS POP-UPS AT CURB AND CORNER OF DRIVEWAY NEEDS TO BE MOVED BACK TO HIGH LIGHTED LOCATION ON GRASS, ALSO NEED TO SEPERATE THEM SO THEY ARE SPACED APART **LEFT SIDE (2) GUTTER DRAINS POP-UPS AT REAR CORNER OF PROPERTYNEEDS TO BE MOVED SEPERATE THEM SO THEY ARE SPACED APART ** LEFT SIDE ALONG PROPERTY LINE TWO (2) LOW SPOTS HIGH LIGHTED NEED TO BE REPAIRED AS THEY WILL HOLD WATER. | |||
| U-CROSS CONNECTION | 02/01/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: pond irrigation set up in rear of all houses-as discussed with Rocky--try to have pink valve box flush with sod so not a trip hazard | |||
| ROW- PRE-APRON (PRE-POUR) | 12/04/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 12/04/23 READY TO SET PAVERS _________________________________________________________________________________________________________ 11/9/2023 - PREVIOUS INSPECTION NOTES rady for concrete: MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED | |||
| ROW- PAVER RESTRAINTS | 11/09/2023 | APPROVED | GBERTOLA |
| Note: ready for concrete | |||
| ROW- PRE-APRON (PRE-POUR) | 11/09/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: rady for concrete: MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED | |||
| ELECTRIC - EARLY POWER | 11/02/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 Approved- release to FPL. 2:29 PM 06/20/2023 11-2-23 1. Emailed FPL at 11:32. | |||
| LATH/BRICK/ WATER BARRIER | 09/14/2023 | APPROVED | AGAETANO |
| INSULATION | 09/06/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 08-31-2023 Grounding wire needs to be protected at meter main. Check at next inspection. | |||
| ALL ROUGH | 08/31/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 08-31-2023 Grounding wire needs to be protected at meter main. Check at next inspection. | |||
| GRAVITY SEWER TEST | 08/04/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 08/04/2023 | APPROVED | MGIBSON |
| WALL SHEATHING | 07/19/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/19/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 07-19-2023 Piggyback details note E not as per plan. Check at next inspection. | |||
| ROOF VALLEY & METAL | 07/19/2023 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 06/20/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Approved- release to FPL. 2:29 PM 06/20/2023 | |||
| TIE BEAM / LINTEL | 06/15/2023 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 06/09/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 05/18/2023 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 05/16/2023 | APPROVED | TSTAUFFACHER |
| WATER METER INSTALLATION REQUEST | 03/21/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/08/2024 | 02/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/08/2023 | 06/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/08/2023 | 06/08/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/14/2023 | 03/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/08/2023 | 02/14/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 02/02/2023 | 02/02/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | HOLD | 01/31/2023 | 02/01/2023 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Product Approval for the underlayment on the Roofing Worksheet does not match the Product Approval number on the Product Approval Sheet. Revise to reflect the correct underlayment to be used. 2. Product Approval 17413 is called out on the Roofing Worksheet. This approval number is for casement windows not underlayment. | |||
| CUSVC | COMPLETE | 01/31/2023 | 02/07/2023 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 01/31/2023 | 02/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/31/2023 | 02/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/31/2023 | 02/06/2023 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 01/31/2023 | 02/01/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/31/2023 | 02/06/2023 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/31/2023 | 02/02/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤505.39 | 03/08/2023 |
| ADJUSTMENT 50% | (¤1,153.43) | 03/08/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/08/2023 |
| INSPECTION - RESIDENTIAL | ¤1,773.75 | 03/08/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤503.10 | 03/08/2023 |
| CONNECTION FEES | ¤25.00 | 03/08/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 03/08/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 03/08/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 03/08/2023 |
| IMPACT FEE FIRE | ¤420.52 | 03/08/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/08/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/08/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 03/08/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/08/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 03/08/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 03/08/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 03/08/2023 |
| SURCHARGE FS 533.721 | ¤6.98 | 03/08/2023 |
| SURCHARGE - FS 468.631 | ¤10.47 | 03/08/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/08/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/08/2023 |
| SW ENG PRE APRON | ¤30.00 | 03/08/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/08/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/08/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.38) | 03/08/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.38 | 03/08/2023 |
| SEWER INSPECTION | ¤25.00 | 03/08/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 03/08/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 03/08/2023 |
| SITE PLAN 30 | ¤30.00 | 03/08/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,873.63 |