I want to search for...
Permit #2025050934
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7010-00070-0320 |
| GARAGE: 476 sqft |
| CONDITIONED SPACE: 1951 sqft |
| OPENED PORCH (WITH ROOF) : 354 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 2893 sqft |
| Block: 00070 |
| Subdivision: - |
| Job Phone: 386-931-6577 |
| Location Address: 63 FIELDSTONE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/04/2025 |
| NOC: Unknown |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: SILVA VERGILIO & JESSICA I H&W LIFE ESTATE |
|
Address 64 CARPENTER STREET CUMBERLAND, RI 02864 |
| Lot: 0320 |
| Contracted Stated Job Value: ¤390,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
LUIS JORGE MEDEIROS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CCC1335446 (Exp: 08/31/2026) | 386-931-6577 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
MIGUEL ANGEL GALLARDO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
315 PACER CT SANFORD, FL 32773 |
CAC1813826 (Exp: 08/31/2026) | 407-202-0953 |
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 E MOODY BLVD BLDG 2 BUNNELL , FL 32110 |
EC13004270 (Exp: 08/31/2026) | 386-931-6614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ELECTRIC - EARLY POWER | 05/13/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/13/26 Email sent to FPL 5/12/2026 - PREVIOUS INSPECTION NOTES 5/12/26 Previous notes not rectified 1. Missing surge protection in meter/main only NEC 230.67 3. Meter panel in garage not labeled (by final) NEC 408.4 4. Several boxes that have wires/covers are not safed off properly NEC 440.14 4/23/2026 - PREVIOUS INSPECTION NOTES 4/23/26 1. Missing surge protection in meter/main only NEC 230.67 2. No 911 address FBCR 319.2 3. Meter panel in garage not labeled (by final) NEC 408.4 4. Several boxes that have wires/covers are not safed off properly NEC 440.14 --A complete inspection will be required | |||
| ELECTRIC - EARLY POWER | 05/12/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 5/12/26 Previous notes not rectified 1. Missing surge protection in meter/main only NEC 230.67 3. Meter panel in garage not labeled (by final) NEC 408.4 4. Several boxes that have wires/covers are not safed off properly NEC 440.14 4/23/2026 - PREVIOUS INSPECTION NOTES 4/23/26 1. Missing surge protection in meter/main only NEC 230.67 2. No 911 address FBCR 319.2 3. Meter panel in garage not labeled (by final) NEC 408.4 4. Several boxes that have wires/covers are not safed off properly NEC 440.14 --A complete inspection will be required | |||
| SEWER TIE IN | 04/24/2026 | APPROVED | MCONTRYMAN |
| Note: 4/23/2026 - PREVIOUS INSPECTION NOTES 4/23/36 1. Cannot see sewer connection | |||
| ELECTRIC - EARLY POWER | 04/23/2026 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 4/23/26 1. Missing surge protection in meter/main only NEC 230.67 2. No 911 address FBCR 319.2 3. Meter panel in garage not labeled (by final) NEC 408.4 4. Several boxes that have wires/covers are not safed off properly NEC 440.14 --A complete inspection will be required | |||
| GRAVITY SEWER TEST | 04/23/2026 | APPROVED | MCONTRYMAN |
| SEWER TIE IN | 04/23/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/23/36 1. Cannot see sewer connection | |||
| DRYWALL NAILING | 03/09/2026 | APPROVED | MCONTRYMAN |
| INSULATION | 03/03/2026 | APPROVED | MCONTRYMAN |
| Note: 3/2/2026 - PREVIOUS INSPECTION NOTES 3/2/26 1. Missing fire foam in electrical chase for front entry knee wall FBC R302.11 2. Please seal up broken concrete on floor by laundry room area Inspector Notes from Inspection 2420 2/20/26 1. Product approvals need to be changed and submitted for approval to show the Pella windows installed FBC(A) 107.4 2. Need a full, and city approved, energy calc on site by next Inspection. Duct layout on site is correct, but does not look like the original approved in the energy calcs FBC(A) 107.3.1 | |||
| INSULATION | 03/02/2026 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 3/2/26 1. Missing fire foam in electrical chase for front entry knee wall FBC R302.11 2. Please seal up broken concrete on floor by laundry room area Inspector Notes from Inspection 2420 2/20/26 1. Product approvals need to be changed and submitted for approval to show the Pella windows installed FBC(A) 107.4 2. Need a full, and city approved, energy calc on site by next Inspection. Duct layout on site is correct, but does not look like the original approved in the energy calcs FBC(A) 107.3.1 | |||
| ELECTRIC-TUG | 03/02/2026 | APPROVED | MCONTRYMAN |
| Note: 3/2/26 Email sent to FPL | |||
| ALL ROUGH | 02/20/2026 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 2/20/26 1. Product approvals need to be changed and submitted for approval to show the Pella windows installed FBC(A) 107.4 2. Need a full, and city approved, energy calc on site by next Inspection. Duct layout on site is correct, but does not look like the original approved in the energy calcs FBC(A) 107.3.1 | |||
| LATH/BRICK/ WATER BARRIER | 02/18/2026 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/10/2026 | APPROVED | HCAMACHO |
| Note: 2/2/2026 - PREVIOUS INSPECTION NOTES 2/2/26 1. The previous items have not been fixed yet. Please call back when ready. Roof approved 2. Plans on site need to be larger with stam of approval 12/19/25 1. The plans are missing one page. 2. The Truss Connector shedule thats on the plan does not match the truss #'s (ID), therefore I don't know what belongs to what. 3. There are several Girders in the rear of the house that are doubles and triples that only have one strap. Need connector schedule to verify. 4. One of the girders in the kitchen area that sits on Lanai wall has two straps nailed to the wood but are not in the cement. Marked on wall 5. Bearing walls need anchors to CMU, see detail. Marked on wall 6. Plywood covering knee wall in garage needs to be removed to see anchors.Marked on wall | |||
| ROW - DRAINAGE | 02/09/2026 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THE BUILDER TAKEN OUT TEMP. CULVERT AND SWALE IS OPEN. ITS THE BUILDER RESPOSIBILITY TO KEEP BMPS DURING ENTIRE CONSTRUCTION ------------------------------------------------------------------- 2/6/2026 - PREVIOUS INSPECTION NOTES ** 0206/26 BUILDER CUT OFF THE TEMPORARY CULVERT PIPE REDUCING THE CONSTRUCTION OPENING DOWN TO 10 FT. THE CONSTRUCTION ENTRANCE IS REQUIRED TO BE AMINIMUM OF 16 FT WIDE FROM THE EDGE OF PAVEMENT TO THE ROIGHT OF WAY (ROW) LINE ** SEE DOCUMENT THAT WAS LEFT IN PHOTO SECTION DETAILING THE RESIDENTIAL NEW HOME CONSTRUCTON ENTRANCE ** SEE ATTACHED PHOTOS _______________________________________________________________________________________________________________________ 2/5/2026 - PREVIOUS INSPECTION NOTES 1) NEED TO RE-ESTABLISH SILT FENCES AROUND THE PROPERTY. 2) NEED TO FIX ALL RUTTS AND NEED TO INSTALL CULVERT PIPE CORRERTLY SO WATER WILL FLOW CORRECTLY. PLEASE SEE PHOTOS ATTACHED THIS IS NOW ON AN INSPECTION HOLD. --------------------------------------------------------------------------- 2/4/2026 - PREVIOUS INSPECTION NOTES ** 02/04/26 NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION YOUR PERMIT WILL BE PLACED A PRIORITY (1) STATUS IS ALL CORRECTIOND HAVE NOT BEEN MADE AT THE TIME OF THE NEXT INSPECTION ** BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/05/26 __________________________________________________________________________________________________________________________ 1/29/2026 - PREVIOUS INSPECTION NOTES ** 01/29/26 BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/04/26 | |||
| ROW - DRAINAGE | 02/06/2026 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 0206/26 BUILDER CUT OFF THE TEMPORARY CULVERT PIPE REDUCING THE CONSTRUCTION OPENING DOWN TO 10 FT. THE CONSTRUCTION ENTRANCE IS REQUIRED TO BE AMINIMUM OF 16 FT WIDE FROM THE EDGE OF PAVEMENT TO THE ROIGHT OF WAY (ROW) LINE ** SEE DOCUMENT THAT WAS LEFT IN PHOTO SECTION DETAILING THE RESIDENTIAL NEW HOME CONSTRUCTON ENTRANCE _______________________________________________________________________________________________________________________ 2/5/2026 - PREVIOUS INSPECTION NOTES 1) NEED TO RE-ESTABLISH SILT FENCES AROUND THE PROPERTY. 2) NEED TO FIX ALL RUTTS AND NEED TO INSTALL CULVERT PIPE CORRERTLY SO WATER WILL FLOW CORRECTLY. PLEASE SEE PHOTOS ATTACHED THIS IS NOW ON AN INSPECTION HOLD. --------------------------------------------------------------------------- 2/4/2026 - PREVIOUS INSPECTION NOTES ** 02/04/26 NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION YOUR PERMIT WILL BE PLACED A PRIORITY (1) STATUS IS ALL CORRECTIOND HAVE NOT BEEN MADE AT THE TIME OF THE NEXT INSPECTION ** BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/05/26 __________________________________________________________________________________________________________________________ 1/29/2026 - PREVIOUS INSPECTION NOTES ** 01/29/26 BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/04/26 | |||
| ROW - DRAINAGE | 02/05/2026 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO RE-ESTABLISH SILT FENCES AROUND THE PROPERTY. 2) NEED TO FIX ALL RUTTS AND NEED TO INSTALL CULVERT PIPE CORRERTLY SO WATER WILL FLOW CORRECTLY. PLEASE SEE PHOTOS ATTACHED THIS IS NOW ON AN INSPECTION HOLD. --------------------------------------------------------------------------- 2/4/2026 - PREVIOUS INSPECTION NOTES ** 02/04/26 NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION YOUR PERMIT WILL BE PLACED A PRIORITY (1) STATUS IS ALL CORRECTIOND HAVE NOT BEEN MADE AT THE TIME OF THE NEXT INSPECTION ** BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/05/26 __________________________________________________________________________________________________________________________ 1/29/2026 - PREVIOUS INSPECTION NOTES ** 01/29/26 BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/04/26 | |||
| ROW - DRAINAGE | 02/04/2026 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/04/26 NO CORRECTIONS HAVE BEEN MADE AT THE TIME OF THIS INSPECTION YOUR PERMIT WILL BE PLACED A PRIORITY (1) STATUS IS ALL CORRECTIOND HAVE NOT BEEN MADE AT THE TIME OF THE NEXT INSPECTION ** BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/05/26 __________________________________________________________________________________________________________________________ 1/29/2026 - PREVIOUS INSPECTION NOTES ** 01/29/26 BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/04/26 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/02/2026 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 2/2/26 1. The previous items have not been fixed yet. Please call back when ready. Roof approved 2. Plans on site need to be larger with stam of approval 12/19/25 1. The plans are missing one page. 2. The Truss Connector shedule thats on the plan does not match the truss #'s (ID), therefore I don't know what belongs to what. 3. There are several Girders in the rear of the house that are doubles and triples that only have one strap. Need connector schedule to verify. 4. One of the girders in the kitchen area that sits on Lanai wall has two straps nailed to the wood but are not in the cement. Marked on wall 5. Bearing walls need anchors to CMU, see detail. Marked on wall 6. Plywood covering knee wall in garage needs to be removed to see anchors.Marked on wall | |||
| ROW - DRAINAGE | 01/29/2026 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/29/26 BUILDER IS REQUIRED TO RE-SET THE TEMPORARY OR OPEN AND MAINTAIN THE ROADSIDE SWALE AS CURRENTLY YOUR TEMPORARY CULVERT IS NOT EFFECTIVE IN MOVING STORMWATER AS BOTH END OF PIPE ARE POINTING UPWARD. ** RE-ESTABLISH SILT FENCE AROUND WNTIRE PERIMETER OF JOB SITE ** FOLLOW UP INSPECTION ON 02/04/26 | |||
| ROOF VALLEY & METAL | 01/09/2026 | APPROVED - AS NOTED | HCAMACHO |
| Note: ok to load roof | |||
| WALL SHEATHING | 01/09/2026 | APPROVED - AS NOTED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/09/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: *Roof Sheathing is ok* 1- The previous items have not been fixed yet. Please call back when ready. 12/19/2025 - PREVIOUS INSPECTION NOTES 1. The plans are missing one page. 2. The Truss Connector shedule thats on the plan does not match the truss #'s (ID), therefore I don't know what belongs to what. 3. There are several Girders in the rear of the house that are doubles and triples that only have one strap. Need connector schedule to verify. 4. One of the girders in the kitchen area that sits on Lanai wall has two straps nailed to the wood but are not in the cement. Marked on wall 5. Bearing walls need anchors to CMU, see detail. Marked on wall 6. Plywood covering knee wall in garage needs to be removed to see anchors.Marked on wall | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/19/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. The plans are missing one page. 2. The Truss Connector shedule thats on the plan does not match the truss #'s (ID), therefore I don't know what belongs to what. 3. There are several Girders in the rear of the house that are doubles and triples that only have one strap. Need connector schedule to verify. 4. One of the girders in the kitchen area that sits on Lanai wall has two straps nailed to the wood but are not in the cement. Marked on wall 5. Bearing walls need anchors to CMU, see detail. Marked on wall 6. Plywood covering knee wall in garage needs to be removed to see anchors.Marked on wall | |||
| TIE BEAM / LINTEL | 09/17/2025 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 08/12/2025 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 08/08/2025 | CANCELLED BY APPLICANT | JSTEWART |
| Note: via phone | |||
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/23/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/22/2025 | APPROVED | HCAMACHO |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/21/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 07/10/2025 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 05/22/2025 | APPROVED | DRODRIGUEZ |
| BLD - BUILDING FINAL | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | |||
| ROW - STORMWATER FINAL | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/24/2026 | 03/02/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/11/2026 | 02/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/17/2025 | 09/17/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/17/2025 | 09/17/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/23/2025 | 07/23/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/23/2025 | 07/23/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/18/2025 | 07/18/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit certification letter | |||
| BLD | COMPLETE | 07/18/2025 | 07/21/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/07/2025 | 07/10/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit certification letter and density reports. | |||
| ELEC | COMPLETE | 05/30/2025 | 06/02/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/30/2025 | 06/02/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/30/2025 | 06/02/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/22/2025 | 06/17/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/21/2025 | 05/28/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/21/2025 | 05/28/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Need comment in plans regarding soil bearing capacity. FBC R404.5.2 2. Provide complete truss plan submittal packet to include all of the following: A. Complete truss plan packet, signed and sealed by a Florida licensed professional engineer (the truss design engineer) B. Truss layout / placement plan from truss manufacturer C. Truss profile plan sheets for all trusses. D. Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| CUSVC | COMPLETE | 05/21/2025 | 05/29/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/21/2025 | 05/23/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical load calcs do not match the living space of the home. | |||
| ENGIN1 | COMPLETE | 05/21/2025 | 05/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/21/2025 | 05/23/2025 |
| LOCATE | COMPLETE | 05/21/2025 | 05/23/2025 |
| Note: Released By: BRITTANY VITALE - - | |||
| MECH | HOLD | 05/21/2025 | 05/27/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide engineered wall section showing from roof deck to foundation with insulation value. (missing page 5 of 6. It could be that page. If not provide from engineer.) | |||
| SW1 | COMPLETE | 05/21/2025 | 05/22/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/21/2025 | 05/22/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 05/21/2025 | 05/22/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 05/22/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤965.03 | 06/04/2025 |
| WATER- TURN ON | ¤50.00 | 06/04/2025 |
| WATER- TURN ON | ¤50.00 | 06/04/2025 |
| ADJUSTMENT 10% | (¤140.67) | 06/04/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/04/2025 |
| INSPECTION - RESIDENTIAL | ¤1,072.50 | 06/04/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤304.20 | 06/04/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 06/04/2025 |
| IMPACT FEE FIRE | ¤434.51 | 06/04/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/04/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/04/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 06/04/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/04/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 06/04/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 06/04/2025 |
| SURCHARGE FS 533.721 | ¤12.66 | 06/04/2025 |
| SURCHARGE - FS 468.631 | ¤18.99 | 06/04/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/04/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/04/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/04/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/04/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/04/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 06/04/2025 |
| SEWER CREDIT | (¤1,146.90) | 06/04/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 06/04/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 06/04/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 06/04/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 06/04/2025 |
| WATER PERMIT INSPECTION | ¤40.00 | 06/04/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 06/04/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 06/04/2025 |
| SITE PLAN 30 | ¤30.00 | 06/04/2025 |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 1 | ¤35.00 | |
| RSI REINSPECTION 2 | ¤75.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| CONTRACTOR CHANGE | ¤20.00 | |
| Fees | Total Due: ¤355.00 | Total Paid: ¤25,777.02 |