Permit #2025061001

Permit Details

Status: COED

Parcel Id: 07-11-31-7060-00170-0070
CONDITIONED SPACE: 1809 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 33 sqft
Total Square Footage: 2248 sqft
Block: 00170
Subdivision: 7060 -
Job Phone: 239-571-5325
Location Address: 12 SLIPPER FLOWER PATH E
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/22/2025
NOC: RECORDED
Applicant name: RYAN SCOTT DAVIS
Owner: SYNERGY HOMES LLC

Address

581 NW MERCANTILE PLACE

PORT SAINT LUCIE, FL 34986

Address

SUITE 106

PORT SAINT LUCIE, FL 34986

Lot: 0070
Contracted Stated Job Value: ¤200,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SYNERGY HOMES, LLC
Status Location Address State License Number
ACTIVE

1 HARGROVE GRADE, SUITE B1

PALM COAST, FL 32137

CBC1254289 (Exp: 08/31/2026)

Sub Contractors

TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614
WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/13/2026 APPROVED CVANSTRAHLEN
Note: 3/12/2026 - PREVIOUS INSPECTION NOTES Items from previous inspection not been solved Total 5 Items 3/9/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Garage door motor dont work ( door dont open or close ) #2-Seal penentration on Pep tank conduit ( wall ) #3- ODU needs to be 3" from finished grade FBCR M1305.1.4.1 #4-MIssing bolts and washers on garage jam (a few bolts are loose) #5-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use.” 3/5/2026 - PREVIOUS INSPECTION NOTES cancelled by text
BLD - BUILDING FINAL 03/12/2026 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Items from previous inspection not been solved Total 5 Items 3/9/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1- Garage door motor dont work ( door dont open or close ) #2-Seal penentration on Pep tank conduit ( wall ) #3- ODU needs to be 3" from finished grade FBCR M1305.1.4.1 #4-MIssing bolts and washers on garage jam (a few bolts are loose) #5-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use.” 3/5/2026 - PREVIOUS INSPECTION NOTES cancelled by text
BLD - BUILDING FINAL 03/09/2026 Disapproved - NO FEE CVANSTRAHLEN
Note: Please fix items before next inspection #1- Garage door motor dont work ( door dont open or close ) #2-Seal penentration on Pep tank conduit ( wall ) #3- ODU needs to be 3" from finished grade FBCR M1305.1.4.1 #4-MIssing bolts and washers on garage jam (a few bolts are loose) #5-M1502.4.7 Exhaust duct required. Where space for a clothes dryer is provided, an exhaust duct system shall be installed. Where the clothes dryer is not installed at the time of occupancy the exhaust duct shall be capped or plugged in the space in which it originates and identified and marked “future use.” 3/5/2026 - PREVIOUS INSPECTION NOTES cancelled by text
BLD - BUILDING FINAL 03/05/2026 CANCELLED BY APPLICANT CVANSTRAHLEN
Note: cancelled by text
ROW - FINAL APRON (AFTER POUR) 03/05/2026 APPROVED FSLADISH
Note: 3/4/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 03/05/2026 APPROVED FSLADISH
Note: 3/4/26 REQUIRED SOD CORRECTION COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________________ *** INSPECTORS NOTE. THERE IS A HIGH SPOT OUTLINED IN PAINT THAT NEEDS TO BE LOWERED TO ALLOW POSITIVE DRAINAGE FLOW. THERE IS A BARE EARTH AREA THAT NEEDS TO BE SODDED JUST OFF RIGHT SIDE PROPERTY LINE NEAR PEP TANK , ALSO OUTLINED IN PAINT BEFORE ROW FINAL PASSAGE. ***
U -UTILITY RESIDENTIAL FINAL 03/05/2026 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No CC, No IRR
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/04/2026 APPROVED FSLADISH
Note: 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26 YOUR SURVEY SHOWS YOUR REAR MIDDLE TO LEFT SIDE WITH A FLAT ELEVATION OF 26.70. DRAINAGE WILL POOL HERE AND NOT HAVE POSITIVE REAR TO FRONT SWALE FLOW. YOU WILL NEED TO MAKE CORRECTIONS IN THE FIELD TO REFLECT POSITIVE DRAINAGE FLOW TO MEET COPC MINIMUM STANDARDS. SEE PHOTO FOR REFERENCE.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/04/2026 APPROVED FSLADISH
Note: 3/4/26 UPON WALKING PROPERTY DETERMINED DRAINAGE OVERALL WORKS. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. *** INSPECTORS NOTE. THERE IS A HIGH SPOT OUTLINED IN PAINT THAT NEEDS TO BE LOWERED TO ALLOW POSITIVE DRAINAGE FLOW. THERE IS A BARE EARTH AREA THAT NEEDS TO BE SODDED JUST OFF RIGHT SIDE PROPERTY LINE NEAR PEP TANK , ALSO OUTLINED IN PAINT BEFORE ROW FINAL PASSAGE. ***
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/20/2026 Disapproved - NO FEE FSLADISH
Note: 2/20/26 YOUR SURVEY SHOWS YOUR REAR MIDDLE TO LEFT SIDE WITH A FLAT ELEVATION OF 26.70. DRAINAGE WILL POOL HERE AND NOT HAVE POSITIVE REAR TO FRONT SWALE FLOW. YOU WILL NEED TO MAKE CORRECTIONS IN THE FIELD TO REFLECT POSITIVE DRAINAGE FLOW TO MEET COPC MINIMUM STANDARDS. SEE PHOTO FOR REFERENCE.
ELECTRIC - EARLY POWER 02/02/2026 APPROVED - AS NOTED BTAYLOR
Note: 2-2-26 1. Emailed FPL at 2:16.
ELECTRIC - EARLY POWER 01/28/2026 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 01/23/2026 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2060 FBC3303.5 SWALE BLOCKED
SEWER TIE IN 01/23/2026 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2060 FBC3303.5 SWALE BLOCKED
ROW- PRE-APRON (PRE-POUR) 01/22/2026 APPROVED FSLADISH
Note: 1/22/26 PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 1/20/2026 - PREVIOUS INSPECTION NOTES 1/20/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION. YOU ALSO WILL NEED TO FILL IN AROUND PIPE HALFWAY UP (SPRING LINE) AND GET RID OF ALL CHUNKS OF ROCKS AND ASPHALT IN POUR AREA. IT NEED TO BE CLEAN AND COMPACTED. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow. RESIDENTIAL DRIVEWAYS SECTION 900.04 "A) Residential driveways entering upon a paved City street shall be constructed of portland cement concrete, or of such other rigid paving material as the City Engineer may approve, shall be a minimum of ten feet [10') wide at the right-of-way line and sixteen feet (16') wide at the roadway edge. That widening may be provided by a taper. Driveway shoulder within the road right-of-way shall be a minimum of two feet (2') in width and shall be stabilized and sodded. Driveway thickness on the right-of-way shall be either six inches (6"") on firmly compacted subgrade of clean granular material or five inches (5"") on three inches (3"") of limerock or shell base. This concrete thickness may be reduced by one inch (1"") by the addition of 6""x 6"" re-mesh or fiber mesh concrete reinforcing wire. Culvert pipe shall be of the size and set in the location (horizontal and vertical) established by the City and required by the permit. Mitered or tapered end sections are required on driveway pipes, except where otherwise approved by the City Engineer. Culvert pipes with less than twelve inches (12"") of cover below the bottom of driveway pavement to the top of pipe shall either be constructed of reinforced concrete or encased in concrete from the middle of the pipe to the bottom of the concrete driveway. For driveways entering upon a cul-de-sac and for driveways entering a flag lot the minimum width at the roadway edge and the placement of the culvert pipe will be modified to best suit the actual conditions at the site. Existing residential driveways, cut or destroyed by utility installation may be re-constructed to the same section as that original driveway with prior approval from the City. All residential driveways are required to be permitted, in accordance with the above criteria." * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E"
ROW- PRE-APRON (PRE-POUR) 01/20/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 1/20/26 YOUR CULVERT PIPE IS OUT OF TOLERANCE TO THE SWALE PLAN DIAGRAM AT THE TIME OF THIS INSPECTION. YOU ALSO WILL NEED TO FILL IN AROUND PIPE HALFWAY UP (SPRING LINE) AND GET RID OF ALL CHUNKS OF ROCKS AND ASPHALT IN POUR AREA. IT NEED TO BE CLEAN AND COMPACTED. ROADSIDE SWALE AND CULVERT SET WITHIN 0.10 Section 300.01 C(3) V-17 3) The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow, nor shall it be sloped more than 0.10 of a foot in thedirection of the drainage flow. RESIDENTIAL DRIVEWAYS SECTION 900.04 "A) Residential driveways entering upon a paved City street shall be constructed of portland cement concrete, or of such other rigid paving material as the City Engineer may approve, shall be a minimum of ten feet [10') wide at the right-of-way line and sixteen feet (16') wide at the roadway edge. That widening may be provided by a taper. Driveway shoulder within the road right-of-way shall be a minimum of two feet (2') in width and shall be stabilized and sodded. Driveway thickness on the right-of-way shall be either six inches (6"") on firmly compacted subgrade of clean granular material or five inches (5"") on three inches (3"") of limerock or shell base. This concrete thickness may be reduced by one inch (1"") by the addition of 6""x 6"" re-mesh or fiber mesh concrete reinforcing wire. Culvert pipe shall be of the size and set in the location (horizontal and vertical) established by the City and required by the permit. Mitered or tapered end sections are required on driveway pipes, except where otherwise approved by the City Engineer. Culvert pipes with less than twelve inches (12"") of cover below the bottom of driveway pavement to the top of pipe shall either be constructed of reinforced concrete or encased in concrete from the middle of the pipe to the bottom of the concrete driveway. For driveways entering upon a cul-de-sac and for driveways entering a flag lot the minimum width at the roadway edge and the placement of the culvert pipe will be modified to best suit the actual conditions at the site. Existing residential driveways, cut or destroyed by utility installation may be re-constructed to the same section as that original driveway with prior approval from the City. All residential driveways are required to be permitted, in accordance with the above criteria." * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL DRAWING 300. E "CULVERT TO BE CENTERED ON DRIVEWAY. CULVERT SHALL BE CONCRETE ENCASED TO SPRING LINE AND AT LEAST 12"" ON EACH SIDE SEE SECTION B-B. Sec 300.E"
PEP TANK INSTALLATION REQUEST 01/15/2026 APPROVED CBOWERMASTER
U-CROSS CONNECTION 01/15/2026 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR
INSULATION 01/09/2026 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 01/07/2026 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 1/6/26 1. Missing 1 panel on SGD at time of inspection
ALL ROUGH 01/05/2026 APPROVED - AS NOTED MCONTRYMAN
Note: 1/6/26 1. Missing 1 panel on SGD at time of inspection
WALL SHEATHING 12/30/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/30/2025 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/30/2025 APPROVED BTAYLOR
TIE BEAM / LINTEL 11/14/2025 APPROVED KSANDOE
Note: 11/13/2025 - PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 11/13/2025 CANCELLED BY APPLICANT BTAYLOR
MONOLITHIC SLAB 11/05/2025 APPROVED KSANDOE
PLUMBING 1ST ROUGH UNDERGROUND 10/21/2025 APPROVED - AS NOTED MGIBSON
Note: FBC3303.5 SWALE BLOCKED
FORMBOARD SURVEY (OFFICE USE ONLY) 10/16/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 09/30/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 09/16/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 12/01/2025 12/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 10/14/2025 10/16/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 10/14/2025 10/14/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BLD COMPLETE 09/30/2025 09/30/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 06/24/2025 07/10/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 06/23/2025 06/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 06/23/2025 06/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 06/23/2025 06/26/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/23/2025 06/30/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/23/2025 06/24/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 06/23/2025 06/25/2025
LOCATE COMPLETE 06/23/2025 06/24/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 06/23/2025 06/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/23/2025 06/27/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/23/2025 06/26/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 03/16/2026
REINSPECTION RESIDENTIAL ¤40.00 03/16/2026
CONTRACTOR CHANGE ¤20.00 03/16/2026
FC IMPACT FEE EMS ¤62.00 08/22/2025
IMPACT FEE FIRE ¤434.51 08/22/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/22/2025
FC IMPACT FEE LIBRARY ¤268.00 08/22/2025
IMPACT FEE PARKS ¤1,828.01 08/22/2025
IMPACT FEE SCHOOL ¤5,450.00 08/22/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 08/22/2025
PEP TANK INSTALL ¤756.74 08/22/2025
WATER- TURN ON ¤50.00 08/22/2025
ADJUSTMENT 10% (¤120.20) 08/22/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/22/2025
INSPECTION - RESIDENTIAL ¤913.00 08/22/2025
PLAN REVIEW - RESIDENTIAL ¤258.96 08/22/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 08/22/2025
SURCHARGE FS 533.721 ¤10.82 08/22/2025
SURCHARGE - FS 468.631 ¤16.23 08/22/2025
SW ENG - FOUNDATION SURVEY ¤20.00 08/22/2025
SW ENG INSPECTION 80 ¤80.00 08/22/2025
SW ENG PRE APRON ¤30.00 08/22/2025
SW ENG - REVIEW 20 ¤20.00 08/22/2025
SW ENG RES REVIEW 200 ¤200.00 08/22/2025
WATER METER W/ TAP ¤2,326.93 08/22/2025
WASTEWATER PERM INSPECTION ¤80.00 08/22/2025
WASTEWATER PERM REVIEW ¤25.00 08/22/2025
SEWER CAPITAL FACILITY ¤4,415.00 08/22/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 08/22/2025
WATER PERMIT REVIEW ¤25.00 08/22/2025
WATER MAIN EXTENSION IMPACT ¤917.27 08/22/2025
SITE PLAN 30 ¤30.00 08/22/2025
Fees Total Due: ¤0.00 Total Paid: ¤26,531.76