Permit #2025080812
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7057-00210-0100 |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 108 sqft |
| CONDITIONED SPACE: 1800 sqft |
| OPENED PORCH (WITH ROOF) : 132 sqft |
| Total Square Footage: 2474 sqft |
| Block: 00210 |
| Subdivision: - |
| Job Phone: 832-726-2202 |
| Location Address: 6 ULMACEAL PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/15/2025 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN HOMES LLC |
|
Address 1802 NORTH ALAFAYA TRAIL ORLANDO, FL 32826 |
|
Address UNIT 162 ORLANDO, FL 32826 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤131,500.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Sub Contractors
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 04/21/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| ROW - FINAL APRON (AFTER POUR) | 04/21/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 04/21/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 04/21/2026 | FINAL APPROVED | BHAINES |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/10/2026 | APPROVED | FSLADISH |
| ELECTRIC - EARLY POWER | 03/10/2026 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 02/23/2026 | APPROVED | FSLADISH |
| Note: 2/23/26 PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE AT THE TIME OF THE INSPECTION READY TO POUR,IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ELECTRIC-TUG | 02/11/2026 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 01/29/2026 | APPROVED | BTAYLOR |
| INSULATION | 12/12/2025 | Approval - Private Provider | PPROVIDER |
| Note: 12/11/2025 3:21:40 PM- PREVIOUS INSPECTION NOTES | |||
| INSULATION | 12/11/2025 | Disapproved- Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/11/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/08/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 11/20/2025 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 11/19/2025 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 11/17/2025 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 11/12/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/12/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 10/31/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 10/23/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/21/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 10/20/2025 | APPROVED | JMUNSON |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 10/15/2025 | APPROVED - AS NOTED | RRICKS |
| Note: Formboards are at the maximum allow height per COPC standards. Please ensure that the slab is not poured any higher to prevent any future holds. | |||
| ROW - DRAINAGE | 10/09/2025 | APPROVED | FSLADISH |
| Note: 10/9/25 ALL MINIMUM COPC RESIDENTIAL CONSTRUCTION ENTRANCE REQUIREMENTS MET AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ 10/6/2025 - PREVIOUS INSPECTION NOTES 10/6/25 RECEIVED CALL FROM MIKE CM AND HE INDICATED THAT THE SILT FENCE WOULD BE UP IN THE NEXT COUPLE OF DAYS. TEMP PIPE IS INSTALLED TO GRADE, SWALE IS OPEN TO FLOW, DUMPSTER AND PORTA POTTY ARE ON CONSTRUCTION SIT AT THE TIME OF THIS INSPECTION. I AM PARTIALLY APPROVING THIS DRAINAGE INSPECTION WITH THE UNDERSTANDING THAT SILT FENCE WILL BE INSTALLED CORRECTLY AND AS REQUIRED PER COPC RESIDENTIAL CONSTRUCTION ENTRANCE STANDARDS IN A TIMELY MANNER. REINSPECTION ON 10/9/25. _____________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES 10/1/25 SPOKE WITH PARREN AND MIKE CM AND PER THEIR CONVERSATION AND MY CONVERSATION WITH MIKE WE WILL ALLOW HIM TO HOLD OFF ON INSTALLING COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE UNTIL PAD IS COMPLETED. INSTRUCTED MIKE TO KEEP IN COMMUNICATION AND IF THE PAD IS NOT CONSTRUCTED IN A TIMELY MANNER OR WE HAVE A LARGE AMOUT OF RAIN, THAT THEY WILL NEED TO KEEP THE SWALE OPEN AND FLOWING TO ALLEVIATE WATER BACKING INTO NEIGHBORING PROPERTIES. DISSAPROVING WITH NO FEE PER OUR CONVERSATION AS A COURTESY OF COMMUNICATING INTENTIONS AND TIME FRAME. SCHEDULING NEXT INSPECTION FOR 10/6/25. 9/26/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND PROPERTY AND MAKE A CONSTRUCTION ENTERANCE SO YOU CAN GAIN ACCESS TO THE LOT. 2) NEED TO CLEAR ROADSIDE SWALE FROM ALL OBSTRUCTIONS SO WATER CAN FLOW TO OUTFALL. IF YOU PUT A CULVERT IN YOU WILL NEED TO HAVE MINIMUM OF 12" DIAMETER AND KEEP IT OPEN ALL TIMES. YOU WILL HAVE 5 DAYS TO CORRECT ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| WATER METER INSTALLATION REQUEST | 10/08/2025 | APPROVED | CBOWERMASTER |
| ROW - DRAINAGE | 10/06/2025 | PARTIALLY APPROVED | FSLADISH |
| Note: 10/6/25 RECEIVED CALL FROM MIKE CM AND HE INDICATED THAT THE SILT FENCE WOULD BE UP IN THE NEXT COUPLE OF DAYS. TEMP PIPE IS INSTALLED TO GRADE, SWALE IS OPEN TO FLOW, DUMPSTER AND PORTA POTTY ARE ON CONSTRUCTION SIT AT THE TIME OF THIS INSPECTION. I AM PARTIALLY APPROVING THIS DRAINAGE INSPECTION WITH THE UNDERSTANDING THAT SILT FENCE WILL BE INSTALLED CORRECTLY AND AS REQUIRED PER COPC RESIDENTIAL CONSTRUCTION ENTRANCE STANDARDS IN A TIMELY MANNER. REINSPECTION ON 10/9/25. _____________________________________________________________________________________________________________________ 10/1/2025 - PREVIOUS INSPECTION NOTES 10/1/25 SPOKE WITH PARREN AND MIKE CM AND PER THEIR CONVERSATION AND MY CONVERSATION WITH MIKE WE WILL ALLOW HIM TO HOLD OFF ON INSTALLING COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE UNTIL PAD IS COMPLETED. INSTRUCTED MIKE TO KEEP IN COMMUNICATION AND IF THE PAD IS NOT CONSTRUCTED IN A TIMELY MANNER OR WE HAVE A LARGE AMOUT OF RAIN, THAT THEY WILL NEED TO KEEP THE SWALE OPEN AND FLOWING TO ALLEVIATE WATER BACKING INTO NEIGHBORING PROPERTIES. DISSAPROVING WITH NO FEE PER OUR CONVERSATION AS A COURTESY OF COMMUNICATING INTENTIONS AND TIME FRAME. SCHEDULING NEXT INSPECTION FOR 10/6/25. 9/26/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND PROPERTY AND MAKE A CONSTRUCTION ENTERANCE SO YOU CAN GAIN ACCESS TO THE LOT. 2) NEED TO CLEAR ROADSIDE SWALE FROM ALL OBSTRUCTIONS SO WATER CAN FLOW TO OUTFALL. IF YOU PUT A CULVERT IN YOU WILL NEED TO HAVE MINIMUM OF 12" DIAMETER AND KEEP IT OPEN ALL TIMES. YOU WILL HAVE 5 DAYS TO CORRECT ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 10/01/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 10/1/25 SPOKE WITH PARREN AND MIKE CM AND PER THEIR CONVERSATION AND MY CONVERSATION WITH MIKE WE WILL ALLOW HIM TO HOLD OFF ON INSTALLING COPC REQUIRED RESIDENTIAL CONSTRUCTION ENTRANCE UNTIL PAD IS COMPLETED. INSTRUCTED MIKE TO KEEP IN COMMUNICATION AND IF THE PAD IS NOT CONSTRUCTED IN A TIMELY MANNER OR WE HAVE A LARGE AMOUT OF RAIN, THAT THEY WILL NEED TO KEEP THE SWALE OPEN AND FLOWING TO ALLEVIATE WATER BACKING INTO NEIGHBORING PROPERTIES. DISSAPROVING WITH NO FEE PER OUR CONVERSATION AS A COURTESY OF COMMUNICATING INTENTIONS AND TIME FRAME. SCHEDULING NEXT INSPECTION FOR 10/6/25. 9/26/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL SILT FENCE AROUND PROPERTY AND MAKE A CONSTRUCTION ENTERANCE SO YOU CAN GAIN ACCESS TO THE LOT. 2) NEED TO CLEAR ROADSIDE SWALE FROM ALL OBSTRUCTIONS SO WATER CAN FLOW TO OUTFALL. IF YOU PUT A CULVERT IN YOU WILL NEED TO HAVE MINIMUM OF 12" DIAMETER AND KEEP IT OPEN ALL TIMES. YOU WILL HAVE 5 DAYS TO CORRECT ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 09/26/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO INSTALL SILT FENCE AROUND PROPERTY AND MAKE A CONSTRUCTION ENTERANCE SO YOU CAN GAIN ACCESS TO THE LOT. 2) NEED TO CLEAR ROADSIDE SWALE FROM ALL OBSTRUCTIONS SO WATER CAN FLOW TO OUTFALL. IF YOU PUT A CULVERT IN YOU WILL NEED TO HAVE MINIMUM OF 12" DIAMETER AND KEEP IT OPEN ALL TIMES. YOU WILL HAVE 5 DAYS TO CORRECT ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/31/2025 | 10/31/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/31/2025 | 10/31/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/17/2025 | 10/20/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/16/2025 | 10/17/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Geo Tech needs to be digitally signed and sealed. Looks like the seal was broken on these documents. | |||
| SW1 | COMPLETE | 10/14/2025 | 10/15/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Formboards are at the maximum allow height. Please ensure that slab is not poured any higher to prevent any holds. | |||
| ZON | COMPLETE | 10/14/2025 | 10/14/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/05/2025 | 09/08/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM COPC Note: Lot 11 is a corner lot. | |||
| SWALE | COMPLETE | 09/03/2025 | 09/05/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/02/2025 | 09/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 09/02/2025 | 09/02/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Please move benchmark to PP, hydrant, or manhole cover - There shall be a minimum of 0.3' fall from the 5' easement proposed elevation to the drainage conveyance swale in the back yard. Please provide another proposed elevation in the back yard along the 5' easement on the left side clearly depicting water being contained to this lot - Based on the foundation detail sheet A-1 and the grading plan, the grade adjacent to the foundation is 0.7'(8.4"). The mono slab is 16" total from the top of slab to the bottom footer, which only leaves 7.6" of the footer buried. Per building code there shall be a minimum of 12" buried. - The berm on the left side of the home is not needed based on elevations provided. Please feel free to call or email if there are any questions or concerns. | |||
| ZON | COMPLETE | 09/02/2025 | 09/02/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 08/20/2025 | 08/26/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/20/2025 | 08/27/2025 |
| Note: Released By: MICHELLE MCPARTLAND - - | |||
| ENGIN1 | HOLD | 08/20/2025 | 08/20/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM Relocate the benchmark to the power pole at the southeast courner of lot 9. Nails in the road should only be used as a benchmark if there are no other options (power pole, manhole, etc). | |||
| LOCATE | COMPLETE | 08/20/2025 | 08/26/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/20/2025 | 08/27/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM - Please move benchmark to PP. - There shall be a minimum of 0.3' fall from the the 5' easement proposed elevation to the drainage conveyance swale in the back yard. - Please provide the FFE of the nearest improved lot to the right of this home. - Please provide the proposed FFE for the porch, lanai, and sidewalk - Based on information provided the adjacent grade to proposed FFE is 0.7'(8.4"). The mono slab is 16" from the top of slab to the bottom footer, which only leaves 7.6" of the footer buried. Per building code there shall be a minimum of 12" buried. Please feel free to call or email if there any quesrtions or concerns. | |||
| ZON | COMPLETE | 08/20/2025 | 08/20/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 09/15/2025 |
| ADJUSTMENT 10% | (¤3.00) | 09/15/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/15/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 09/15/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 09/15/2025 |
| IMPACT FEE FIRE | ¤434.51 | 09/15/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/15/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/15/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 09/15/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/15/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 09/15/2025 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 09/15/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 09/15/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 09/15/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/15/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/15/2025 |
| SW ENG PRE APRON | ¤30.00 | 09/15/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/15/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/15/2025 |
| WATER METER W/ TAP | ¤2,326.93 | 09/15/2025 |
| SEWER CREDIT | (¤984.98) | 09/15/2025 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 09/15/2025 |
| WASTEWATER PERM REVIEW | ¤25.00 | 09/15/2025 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 09/15/2025 |
| WATER CREDIT | (¤1,228.59) | 09/15/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 09/15/2025 |
| WATER PERMIT REVIEW | ¤25.00 | 09/15/2025 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 09/15/2025 |
| SITE PLAN 30 | ¤30.00 | 09/15/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| SW ENG - INSPECTION 20 | ¤20.00 | |
| Fees | Total Due: ¤80.00 | Total Paid: ¤22,615.94 |