I want to search for...

Permit #2025110129

Permit Details

Status: INSPECT

Parcel Id: 07-11-31-7034-01260-0050
GARAGE: 765 sqft
OPENED PORCH (WITH ROOF) : 347 sqft
CONDITIONED SPACE: 2376 sqft
OPENED PORCH (WITH ROOF) : 66 sqft
Total Square Footage: 3554 sqft
Block: 01260
Subdivision: -
Job Phone: 832-726-2202
Location Address: 70 ERIC DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/16/2025
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: CASPIAN HOMES LLC

Address

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

Lot: 0050
Contracted Stated Job Value: ¤545,000.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
GRAVITY SEWER TEST 05/13/2026 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 05/13/2026 APPROVED ISANDERSON
LATH/BRICK/ WATER BARRIER 05/01/2026 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 04/28/2026 Approval - Private Provider PPROVIDER
DRYWALL NAILING 04/27/2026 Approval - Private Provider PPROVIDER
INSULATION 04/22/2026 Approval - Private Provider PPROVIDER
ALL ROUGH 04/15/2026 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 04/15/2026 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 04/09/2026 Approval - Private Provider PPROVIDER
WALL SHEATHING 04/07/2026 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/07/2026 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 03/16/2026 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 03/04/2026 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 02/25/2026 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 02/18/2026 APPROVED JMUNSON
FORMBOARD SURVEY (OFFICE USE ONLY) 02/05/2026 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 01/21/2026 APPROVED CBOWERMASTER
U-CROSS CONNECTION
ROW- PRE-APRON (PRE-POUR)
ROW - FINAL APRON (AFTER POUR)
ROW- FINAL SURVEY/GRADING CERTIFICATION
ROW - FINAL INSPECTION
U -UTILITY RESIDENTIAL FINAL
SEWER TIE IN
ELECTRIC - EARLY POWER
BLD - BUILDING FINAL

Review History

Department Status Date In Date Out
BLD COMPLETE 02/18/2026 02/18/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 02/18/2026 02/19/2026
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 02/18/2026 02/18/2026
Note: Released By: KATIE TAING - (386)986-3751 - KTAING@PALMCOASTGOV.COM
BLD HOLD 02/13/2026 02/13/2026
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Certification letter has the wrong address.
BLD HOLD 02/11/2026 02/11/2026
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report needs to be digitally verifiable. The attached document is a copy.
SW1 COMPLETE 02/05/2026 02/05/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/05/2026 02/05/2026
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 01/16/2026 01/16/2026
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Plan sheets are cut off, please re-upload. A-2 A-3 A-1.2 1C-1 A-1.1
BLD COMPLETE 01/16/2026 01/20/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 01/14/2026 01/15/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Due to discrepancies with surveyor elevations, per Engineer - Please lower FFE to be no more than 22" above the crown of the road as discussed.
ENGIN1 HOLD 01/14/2026 01/15/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Due to discrepancies with surveyor elevations, per Engineer - Please lower FFE to be no more than 22" above the crown of the road as discussed.
ENGIN1 COMPLETE 01/14/2026 01/16/2026
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 01/14/2026 01/15/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted. Please ensure that during construction there are no slopes greater than 4:1, specifically along the interior swale on the left side. There is a 28.5 going to a 26.75, please ensure there is enough distance to meet COPC 4:1 standands.
BLD CANCEL 01/13/2026 01/13/2026
SW1 HOLD 01/13/2026 01/14/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Due to discrepancies in elevations and FFEs - per Carmelo the city's Engineer please lower proposed FFE to be no more than 22"(1.83') of the crown of the road.
ZON COMPLETE 01/09/2026 01/09/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 12/30/2025 12/30/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: Mike the CM from Caspian Homes reached out regarding potential elevation concerns. At this time, a hold has been placed on the review by the builder. The survey crew will need to re-shoot all existing elevations, including: - Road centerline - Edge of pavement - All lot lines - Elevations extending 10 feet beyond the property line - Adjacent finished floor elevations Please note that City reviews are based solely on information provided by a licensed surveyor. It is not the City’s responsibility if the information submitted is incorrect.
SW1 COMPLETE 12/11/2025 12/12/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved as noted: There are discrepancies with the FFE on lot 7. Either way there will be no issues with lot 6 meeting the 10" COPC requirements.
ENGIN1 COMPLETE 12/11/2025 12/12/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 HOLD 12/02/2025 12/02/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After further review - this lot will need to be lowered. FFEs for both adjacent lots are off by more than 0.3', with one of the lots being off by 0.6' off based on our survey crew. Please submit a revised grading plan and feel free to reach out if there are any questions or concerns.
BLD COMPLETE 11/26/2025 11/26/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 HOLD 11/26/2025 12/01/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE BACK HIGH POINT NEEDS TO BE ON THE 5' EASMENT SO ONLY 5' OF THIS LOT WILL IMPACT THE ADJACENT LOT IN THE BACK
SW1 HOLD 11/25/2025 11/26/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Comments: There is no grading information on attached grading plan. Please revise.
BLD HOLD 11/25/2025 11/26/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Geotech Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. 2. OK
ZON COMPLETE 11/17/2025 11/18/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 11/17/2025 11/24/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE SLOPE IN THE BACK EXCEEDS 4:1 PLEASE FIX TO BE 4:1 OR LESS
BLD HOLD 11/17/2025 11/21/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Geotech Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. 2. Product Approval FL# 5444-R16 out of cycle. We are in the 2023 review cycle. FL# 16918-R2 out of cycle. FL# 19321-R2 out of cycle. FL# 9589-R6 out of cycle. FL# 16937-R3 out of cycle.
SWALE COMPLETE 11/05/2025 12/03/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
CUSVC COMPLETE 11/04/2025 11/12/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/04/2025 11/05/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 11/04/2025 11/05/2025
LOCATE COMPLETE 11/04/2025 11/10/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 11/04/2025 11/05/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading plan comments: - Based on the information provided there is a slope greater than 4:1 in the back yard. 29.00' going to a 27.6'. Reducing the FFE will help with this and potentially eliminate the berm on the left side of the home based on the existing elevations provided. Please feel free to call or email if there are any questions or concerns.
ZON HOLD 11/04/2025 11/05/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM 1. Site plan and landscape plan have different garage orientation than the engineered drawings. Please resubmit whichever needs to change in order for them all to be the same. 2. Banding is required around all windows and doors facing the public right-of-way.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤50.00 12/16/2025
WATER- TURN ON (¤50.00) 12/16/2025
WATER- TURN ON ¤50.00 12/16/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/16/2025
ADMINISTRATIVE RESIDENTIAL (¤30.00) 12/16/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/16/2025
ADMINISTRATIVE - RESID PP (¤225.00) 12/16/2025
ADMINISTRATIVE - RESID PP ¤225.00 12/16/2025
ADMINISTRATIVE - RESID PP ¤225.00 12/16/2025
FC IMPACT FEE EMS ¤62.00 12/16/2025
FC IMPACT FEE EMS (¤62.00) 12/16/2025
FC IMPACT FEE EMS ¤62.00 12/16/2025
FC IMPACT FEE LAW ENFORCEMENT (¤218.00) 12/16/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/16/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/16/2025
FC IMPACT FEE LIBRARY ¤268.00 12/16/2025
FC IMPACT FEE LIBRARY (¤268.00) 12/16/2025
FC IMPACT FEE LIBRARY ¤268.00 12/16/2025
FIRE RES IMPACT FEE 10-25 (¤942.00) 12/16/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/16/2025
FIRE RES IMPACT FEE 10-25 ¤942.00 12/16/2025
PEP TANK INSTALL ¤756.74 12/16/2025
PEP TANK INSTALL (¤756.74) 12/16/2025
PEP TANK INSTALL ¤756.74 12/16/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/16/2025
PARKS IMPACT FEE 10-25 (¤3,164.00) 12/16/2025
PARKS IMPACT FEE 10-25 ¤3,164.00 12/16/2025
RSI DRIVEWAY AFTER POUR (¤16.25) 12/16/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/16/2025
RSI DRIVEWAY AFTER POUR ¤16.25 12/16/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/16/2025
RSE DRIVE PRE POUR INSPECTION (¤32.50) 12/16/2025
RSE DRIVE PRE POUR INSPECTION ¤32.50 12/16/2025
RSI FIELD SURVEY INSPECTION (¤48.75) 12/16/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/16/2025
RSI FIELD SURVEY INSPECTION ¤48.75 12/16/2025
RSI FORMBOARD REVIEW ¤16.25 12/16/2025
RSI FORMBOARD REVIEW (¤16.25) 12/16/2025
RSI FORMBOARD REVIEW ¤16.25 12/16/2025
RSI PLAN REVIEW NEW (¤48.75) 12/16/2025
RSI PLAN REVIEW NEW ¤48.75 12/16/2025
RSI PLAN REVIEW NEW ¤48.75 12/16/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/16/2025
RSI FNL SURVEY/GRADING CERT (¤48.75) 12/16/2025
RSI FNL SURVEY/GRADING CERT ¤48.75 12/16/2025
RSI ROW FINAL INSPECTION (¤16.25) 12/16/2025
RSI ROW FINAL INSPECTION ¤16.25 12/16/2025
RSI ROW FINAL INSPECTION ¤16.25 12/16/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 12/16/2025
SCHOOL BOARD IMPACT FEE RES (¤5,450.00) 12/16/2025
SCHOOL BOARD IMPACT FEE RES ¤5,450.00 12/16/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 12/16/2025
WASTEWATER MAIN EXTENSION IMPA (¤2,385.00) 12/16/2025
WASTEWATER MAIN EXTENSION IMPA ¤2,385.00 12/16/2025
SURCHARGE FS 533.721 ¤2.55 12/16/2025
SURCHARGE FS 533.721 (¤2.55) 12/16/2025
SURCHARGE FS 533.721 ¤2.55 12/16/2025
SURCHARGE - FS 468.631 (¤3.83) 12/16/2025
SURCHARGE - FS 468.631 ¤3.83 12/16/2025
SURCHARGE - FS 468.631 ¤3.83 12/16/2025
SW ENG RES REVIEW 240 ¤240.00 12/16/2025
SW ENG RES REVIEW 240 (¤240.00) 12/16/2025
SW ENG RES REVIEW 240 ¤240.00 12/16/2025
WATER METER W/ TAP (¤2,326.93) 12/16/2025
WATER METER W/ TAP ¤2,326.93 12/16/2025
WATER METER W/ TAP ¤2,326.93 12/16/2025
TRANSP RES IMPACT FEE 10-25 ¤8,957.52 12/16/2025
TRANSP RES IMPACT FEE 10-25 (¤8,957.52) 12/16/2025
TRANSP RES IMPACT FEE 10-25 ¤8,957.52 12/16/2025
SEWER CREDIT (¤1,466.00) 12/16/2025
SEWER CREDIT ¤1,466.00 12/16/2025
SEWER CREDIT (¤1,466.00) 12/16/2025
WASTEWATER PERM INSPECTION ¤80.00 12/16/2025
WASTEWATER PERM INSPECTION (¤80.00) 12/16/2025
WASTEWATER PERM INSPECTION ¤80.00 12/16/2025
WASTEWATER PERM REVIEW (¤25.00) 12/16/2025
WASTEWATER PERM REVIEW ¤25.00 12/16/2025
WASTEWATER PERM REVIEW ¤25.00 12/16/2025
SEWER CAPITAL FACILITY ¤4,415.00 12/16/2025
SEWER CAPITAL FACILITY (¤4,415.00) 12/16/2025
SEWER CAPITAL FACILITY ¤4,415.00 12/16/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 12/16/2025
WATER CAPITAL FACILITY FEE (¤3,790.49) 12/16/2025
WATER CAPITAL FACILITY FEE ¤3,790.49 12/16/2025
WATER PERMIT REVIEW ¤25.00 12/16/2025
WATER PERMIT REVIEW (¤25.00) 12/16/2025
WATER PERMIT REVIEW ¤25.00 12/16/2025
WATER MAIN EXTENSION IMPACT ¤917.27 12/16/2025
WATER MAIN EXTENSION IMPACT (¤917.27) 12/16/2025
WATER MAIN EXTENSION IMPACT ¤917.27 12/16/2025
SITE PLAN 30 ¤30.00 12/16/2025
SITE PLAN 30 (¤30.00) 12/16/2025
SITE PLAN 30 ¤30.00 12/16/2025
Fees Total Due: ¤0.00 Total Paid: ¤33,125.83