I want to search for...

Permit #2025110363

Permit Details

Status: COED

Parcel Id: 07-11-31-5112-00000-0110
Block: 00000
Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK
Job Phone: 386-238-1570
Location Address: 4 COMMERCE BLVD
Type: CA - COMM ADDITION
Issue Date: 12/15/2025
NOC: RECORDED
Applicant name: GARY LYNN ROBERTS
Owner: GIOIA PROPERTIES LLC

Address

10 COMMERCE BLVD

PALM COAST, FL 32164

Lot: 0110
Contracted Stated Job Value: ¤396,535.00
Job Description: UNIT 3 ENCLOSE EXISTING CANOPY AND BUILD NEW CANOPY
Type: CN

Contractor

COMMERCIAL CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
ACTIVE

7 SUNSHINE BLVD

ORMOND BEACH, FL 32174

CGC059441 (Exp: 08/31/2026) 386-238-1570 386-238-1571

Sub Contractors

GARY LYNN ROBERTS
Status Location Address State License Number Phone Fax
ACTIVE

7 SUNSHINE BLVD

ORMOND BEACH, FL 32174

CGC059441 (Exp: 08/31/2026) 386-238-1570 386-238-1571
SHAUN HAFFNER
Status Location Address State License Number Phone Fax
ACTIVE

70 N PERROTT DR

ORMOND BEACH, FL 32174

EC13010602 (Exp: 08/31/2026) 386-333-9781 386-265-1989
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688

Inspection History

Type Request Date Result Inspector
BUILDING FINAL 03/13/2026 FINAL APPROVED KSANDOE
Note: inspect outside doors/attachment on building final. No lintel inspection done. See chris p for details
FIRE FINAL 03/13/2026 APPROVED RMARTIN
U - UTILITY COMMERCIAL FINAL 03/13/2026 FINAL APPROVED BWRIGHT
LDSC- LANDSCAPE FINAL 03/12/2026 CANCELLED BY INSPECTOR RPICATAGI
Note: NOT APPLICABLE - SITE IS PAVED - PERIMETER BUFERS ARE IN PLACE
HVAC FINAL 03/12/2026 FINAL APPROVED CPISCITELLI
Note: 3/6/2026 - PREVIOUS INSPECTION NOTES Not ready Inspector Notes from Inspection 3140 Duct work installed and fresh air pipe and seams sealed. Copper is also installed. Will look at the rest at Final
HVAC FINAL 03/06/2026 CANCELLED BY APPLICANT HCAMACHO
Note: Not ready Inspector Notes from Inspection 3140 Duct work installed and fresh air pipe and seams sealed. Copper is also installed. Will look at the rest at Final
ELECTRIC FINAL 03/06/2026 APPROVED RMARTIN
LATH/BRICK/WATER BARRIER 03/06/2026 APPROVED HCAMACHO
Note: 3- 3'x 2' walls
ROOF SHEATHING / BRACE / TIE DOWN 03/05/2026 APPROVED PKNAPIK
Note: Approved based on engineer bolt inspection report
ELECTRIC 2ND ROUGH 02/13/2026 APPROVED JMUNSON
HVAC ROUGH 02/05/2026 APPROVED - AS NOTED HCAMACHO
Note: Duct work installed and fresh air pipe and seams sealed. Copper is also installed. Will look at the rest at Final
INSULATION 02/05/2026 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 3280 Stem wall
FOOTER 01/07/2026 APPROVED - AS NOTED KSANDOE
Note: Stem wall
FOOTER 12/23/2025 APPROVED KSANDOE
FOOTER 12/19/2025 CANCELLED BY APPLICANT WEB

Review History

Department Status Date In Date Out
BLD COMPLETE 02/18/2026 02/18/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/10/2026 02/11/2026
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 12/10/2025 12/12/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
FI1 COMPLETE 12/02/2025 12/03/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
DSD COMPLETE 12/02/2025 12/04/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 12/02/2025 12/10/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 12/02/2025 12/10/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 2. Provide completed city of palm cost florida product approval worksheet. Include doors, rool up doors etc.. (Second Request)
ARCHR COMPLETE 11/12/2025 11/26/2025
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
BLD HOLD 11/12/2025 11/25/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA BUILDING CODE-PLUMBING (FBCP), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Revise code year in occupancy note Plan Page A1 2. Provide completed city of palm cost florida product approval worksheet. Include doors, rool up doors etc.. 3. Florida product approval number for metal roof panels needs to be from the 2023 code cycle. Revise roofing worksheet
ELEC COMPLETE 11/12/2025 11/19/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
FI1 HOLD 11/12/2025 11/19/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Is the new enclose warehouse already sprinkled? is the new covered area going to sprinkled? 2. Place note on plans that sprinkler permit will be required to be on a separate permit.
MECH HOLD 11/12/2025 11/21/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE- MECHANICAL (FBCM), FLORIDA BUILDING CODE-ENERGY CONSERVATION (FBCEC), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLAN RE-SUBMITTAL SHALL BE ACCOMPANIED BY A RESPONSE LETTER SIGNED AND SEALED BY THE APPROPRIATE DESIGN PROFESSIONAL(S). ALL PLAN REVISIONS SHALL BE CLOUDED APPROPRIATELY. 1. Provide Energy Calculations per C407 FBC Energy Conservation 2. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 3. Provide Ventilation calculation per Table 403.3.1.1 FBC Mechanical 4. Provide note on plan showing smoke detectors mounted in supply side of AHUs per 606.2.1 FBC Mechanical 5. Provide ductwork details showing hanging, installation and volume dampers. also provide sizing for fresh air ductwork and supply grills on duct layout per Chapter 603 FBC Mechanical 6. Provide equipment schedule and details that comply with Table C403.2.3(1) FBC Energy Conservation. Equipment listed only shows 14 SEER
PLENG COMPLETE 11/12/2025 11/12/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLUM COMPLETE 11/12/2025 11/21/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
UD1 COMPLETE 11/12/2025 11/24/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
PLLA COMPLETE 11/12/2025 11/26/2025
Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM
DSD HOLD 11/12/2025 11/21/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Addition appears to be for Unit 3. Please correct application to show the correct unit of proposed work.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMINISTRATIVE - COMMERCIAL ¤75.00 12/15/2025
INSPECTION COMMERCIAL ¤2,779.00 12/15/2025
PLAN REVIEW - COMMERCIAL ¤456.55 12/15/2025
SURCHARGE FS 533.721 ¤33.11 12/15/2025
SURCHARGE - FS 468.631 ¤49.66 12/15/2025
SW ENG REVIEW- 40 ¤40.00 12/15/2025
SITE PLAN 30 ¤30.00 12/15/2025
Fees Total Due: ¤0.00 Total Paid: ¤3,463.32