I want to search for...
Permit #2026020199
Permit Details
Status: INSPECT
| Parcel Id: 07-11-31-7033-00470-0010 |
| CONDITIONED SPACE: 2721 sqft |
| GARAGE: 469 sqft |
| OPENED PORCH (WITH ROOF) : 103 sqft |
| OPENED PORCH (WITH ROOF) : 145 sqft |
| Total Square Footage: 3438 sqft |
| Block: 00470 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-254-5081 |
| Location Address: 18 RENMONT PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/26/2026 |
| NOC: RECORDED |
| Applicant name: WILLIAM BRYAN ADAMS SR |
| Owner: ADAMS HOMES OF NORTHWEST FLORIDA INC |
|
Address 100 WEST GARDEN STREET PENSACOLA, FL 32502 |
|
Address SECOND FLOOR PENSACOLA, FL 32502 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤212,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
ADAMS HOMES OF NORTHWEST FLORIDA, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 GULF BREEZE PARKWAY GULD BREEZE, FL 32563 |
CRC1330146 (Exp: 08/31/2026) | 386-254-5081 |
Sub Contractors
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
MICHAEL THACKABERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
18115 DEMKO RD ALTOONA, FL 32702 |
CCC1336911 (Exp: 08/31/2026) | 517-499-5016 |
Inspection History
| Type | Request Date | Result | Inspector |
| DRYWALL NAILING | 06/03/2026 | APPROVED | CVANSTRAHLEN |
| INSULATION | 05/29/2026 | APPROVED | CVANSTRAHLEN |
| Note: 5/28/2026 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC R302.11 FBC-FIRESTOPPING INSTALLED ( several annular penetration garage area walls , first floor area plumbing water lines and DWV required to be seal , second floor annular penetration required to be seal ( mark with red sharpie market ) #2-ceiling over garage required to have 5/8 drywall install #3-required fire bloking on second floor , corner by share bathroom Inspector Notes from Inspection 2320 Will chek items front previous inspection on insulation inspection #1NEC 230.24(B) outlines the minimum vertical clearances required for overhead service conductors from final grade. These clearances must be maintained even under conditions of maximum conductor sag-10 feet: Above sidewalks, platforms, and areas accessible only to pedestrians. (Applies only to 120/208V or 120/240V systems not exceeding 150V to ground).NEC Section 230.26 establishes the rules for the Point of Attachment of overhead service conductors (the service drop) to a building or structure.It mandates that this point of attachment must be high enough to allow the service conductors to meet all minimum vertical clearance requirements, and in no case shall the attachment point be less than 10 feet (3.0 meters) above finished grade. #1-NEC-#8-Missing AC register on second floor by hallway #4 size Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR P2605.1-PIPE SUPPORT CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( some dwv over wall level ) #3- FL, the Florida Building Code requires your dryer vent to terminate at least 3 feet in any direction from doors, windows, and ventilated soffits. It must also be a minimum of 3 feet from property lines and 12 inches above the ground. #4-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) not mark with sharpie < required to used electrical tape ) #5-). All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #6-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( one window in the first floor #7-missing window second floor ( front ) *** NOTES ADDED BY CVANSTRAHLEN 5/22/2026 10:08:43 AM *** #7-Missing AC register on second floor by hallway #4 size Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR P2605.1-PIPE SUPPORT CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( some dwv over wall level ) #3- FL, the Florida Building Code requires your dryer vent to terminate at least 3 feet in any direction from doors, windows, and ventilated soffits. It must also be a minimum of 3 feet from property lines and 12 inches above the ground. #4-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) not mark with sharpie < required to used electrical tape ) #5-). All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #6-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( one window in the first floor ) | |||
| INSULATION | 05/28/2026 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-FBC R302.11 FBC-FIRESTOPPING INSTALLED ( several annular penetration garage area walls , first floor area plumbing water lines and DWV required to be seal , second floor annular penetration required to be seal ( mark with red sharpie market ) #2-ceiling over garage required to have 5/8 drywall install #3-required fire bloking on second floor , corner by share bathroom Inspector Notes from Inspection 2320 Will chek items front previous inspection on insulation inspection #1NEC 230.24(B) outlines the minimum vertical clearances required for overhead service conductors from final grade. These clearances must be maintained even under conditions of maximum conductor sag-10 feet: Above sidewalks, platforms, and areas accessible only to pedestrians. (Applies only to 120/208V or 120/240V systems not exceeding 150V to ground).NEC Section 230.26 establishes the rules for the Point of Attachment of overhead service conductors (the service drop) to a building or structure.It mandates that this point of attachment must be high enough to allow the service conductors to meet all minimum vertical clearance requirements, and in no case shall the attachment point be less than 10 feet (3.0 meters) above finished grade. #1-NEC-#8-Missing AC register on second floor by hallway #4 size Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR P2605.1-PIPE SUPPORT CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( some dwv over wall level ) #3- FL, the Florida Building Code requires your dryer vent to terminate at least 3 feet in any direction from doors, windows, and ventilated soffits. It must also be a minimum of 3 feet from property lines and 12 inches above the ground. #4-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) not mark with sharpie < required to used electrical tape ) #5-). All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #6-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( one window in the first floor #7-missing window second floor ( front ) *** NOTES ADDED BY CVANSTRAHLEN 5/22/2026 10:08:43 AM *** #7-Missing AC register on second floor by hallway #4 size Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR P2605.1-PIPE SUPPORT CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( some dwv over wall level ) #3- FL, the Florida Building Code requires your dryer vent to terminate at least 3 feet in any direction from doors, windows, and ventilated soffits. It must also be a minimum of 3 feet from property lines and 12 inches above the ground. #4-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) not mark with sharpie < required to used electrical tape ) #5-). All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #6-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( one window in the first floor ) | |||
| LATH/BRICK/ WATER BARRIER | 05/27/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Will chek items front previous inspection on insulation inspection #1NEC 230.24(B) outlines the minimum vertical clearances required for overhead service conductors from final grade. These clearances must be maintained even under conditions of maximum conductor sag-10 feet: Above sidewalks, platforms, and areas accessible only to pedestrians. (Applies only to 120/208V or 120/240V systems not exceeding 150V to ground).NEC Section 230.26 establishes the rules for the Point of Attachment of overhead service conductors (the service drop) to a building or structure.It mandates that this point of attachment must be high enough to allow the service conductors to meet all minimum vertical clearance requirements, and in no case shall the attachment point be less than 10 feet (3.0 meters) above finished grade. #1-NEC-#8-Missing AC register on second floor by hallway #4 size Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR P2605.1-PIPE SUPPORT CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( some dwv over wall level ) #3- FL, the Florida Building Code requires your dryer vent to terminate at least 3 feet in any direction from doors, windows, and ventilated soffits. It must also be a minimum of 3 feet from property lines and 12 inches above the ground. #4-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) not mark with sharpie < required to used electrical tape ) #5-). All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #6-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( one window in the first floor #7-missing window second floor ( front ) *** NOTES ADDED BY CVANSTRAHLEN 5/22/2026 10:08:43 AM *** #7-Missing AC register on second floor by hallway #4 size Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR P2605.1-PIPE SUPPORT CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( some dwv over wall level ) #3- FL, the Florida Building Code requires your dryer vent to terminate at least 3 feet in any direction from doors, windows, and ventilated soffits. It must also be a minimum of 3 feet from property lines and 12 inches above the ground. #4-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) not mark with sharpie < required to used electrical tape ) #5-). All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #6-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( one window in the first floor ) | |||
| ALL ROUGH | 05/21/2026 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 5/22/2026 10:08:43 AM *** #7-Missing AC register on second floor by hallway #4 size Please fix items before next inspection #1-FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE - FILL TUB TO OVERFLOW #2-FBCR P2605.1-PIPE SUPPORT CPVC UP TO 1" - 3 FEET HORIZONTAL, 10 FEET VERTICAL CPVC 1 1/4" AND UP - 4 FEET HORIZONTAL, 10 FEET VERTICAL PVC 4 FOOT HORIZONTAL, 10 FEET VERTICAL ( some dwv over wall level ) #3- FL, the Florida Building Code requires your dryer vent to terminate at least 3 feet in any direction from doors, windows, and ventilated soffits. It must also be a minimum of 3 feet from property lines and 12 inches above the ground. #4-NEC-200.6 (B)-Side 4 AWG or large an isulated grounded conductor shall be identified ( electrical main panel) not mark with sharpie < required to used electrical tape ) #5-). All bathroom exhaust fans require two points of connection and Master bathroom exhausts need to be sealed properly at roof deck. Also, Master bathroom exhaust are not sealed/connected onto fan sleeve (correctly) as required. FBC-M1502.4.2 / FBC-M1601.4.1.). #6-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( one window in the first floor ) | |||
| WALL SHEATHING | 05/13/2026 | APPROVED | CVANSTRAHLEN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/13/2026 | APPROVED | CVANSTRAHLEN |
| ROOF VALLEY & METAL | 05/13/2026 | APPROVED | CVANSTRAHLEN |
| MONOLITHIC SLAB | 04/20/2026 | APPROVED | CVANSTRAHLEN |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/15/2026 | APPROVED | KSANDOE |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/13/2026 | APPROVED | PKNAPIK |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 04/06/2026 | APPROVED | PFLANAGAN |
| WATER METER INSTALLATION REQUEST | 03/27/2026 | APPROVED | ISANDERSON |
| PEP TANK INSTALLATION REQUEST | |||
| U-CROSS CONNECTION | |||
| ROW- PRE-APRON (PRE-POUR) | |||
| ROW - FINAL APRON (AFTER POUR) | |||
| ROW - FINAL INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | |||
| GRAVITY SEWER TEST | |||
| SEWER TIE IN | |||
| ELECTRIC - EARLY POWER | |||
| BLD - BUILDING FINAL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/13/2026 | 04/13/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/06/2026 | 04/06/2026 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/06/2026 | 04/06/2026 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/26/2026 | 03/26/2026 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/19/2026 | 02/19/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/18/2026 | 02/18/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/06/2026 | 02/12/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/05/2026 | 02/10/2026 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| CUSVC | COMPLETE | 02/05/2026 | 02/13/2026 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/05/2026 | 02/09/2026 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/05/2026 | 02/06/2026 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/05/2026 | 02/09/2026 |
| LOCATE | COMPLETE | 02/05/2026 | 02/11/2026 |
| Note: Released By: IVAN SANDERSON - - | |||
| MECH | COMPLETE | 02/05/2026 | 02/10/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/05/2026 | 02/11/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/05/2026 | 02/11/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor plan: missing the sq footage of the covered patio include that on the plans |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤50.00 | 02/26/2026 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/26/2026 |
| INSPECTION - RESIDENTIAL | ¤1,416.25 | 02/26/2026 |
| PLAN REVIEW - RESIDENTIAL | ¤401.70 | 02/26/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 02/26/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 02/26/2026 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/26/2026 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/26/2026 |
| FIRE RES IMPACT FEE 10-25 | ¤942.00 | 02/26/2026 |
| PEP TANK INSTALL | ¤756.74 | 02/26/2026 |
| PARKS IMPACT FEE 10-25 | ¤3,164.00 | 02/26/2026 |
| RSI DRIVEWAY AFTER POUR | ¤16.25 | 02/26/2026 |
| RSE DRIVE PRE POUR INSPECTION | ¤32.50 | 02/26/2026 |
| RSI FIELD SURVEY INSPECTION | ¤48.75 | 02/26/2026 |
| RSI FORMBOARD REVIEW | ¤16.25 | 02/26/2026 |
| RSI PLAN REVIEW NEW | ¤48.75 | 02/26/2026 |
| RSI FNL SURVEY/GRADING CERT | ¤48.75 | 02/26/2026 |
| RSI ROW FINAL INSPECTION | ¤16.25 | 02/26/2026 |
| SCHOOL BOARD IMPACT FEE RES | ¤5,450.00 | 02/26/2026 |
| WASTEWATER MAIN EXTENSION IMPA | ¤2,385.00 | 02/26/2026 |
| SURCHARGE FS 533.721 | ¤18.48 | 02/26/2026 |
| SURCHARGE - FS 468.631 | ¤27.72 | 02/26/2026 |
| SW ENG RES REVIEW 240 | ¤240.00 | 02/26/2026 |
| WATER METER W/ TAP | ¤2,326.93 | 02/26/2026 |
| TRANSP RES IMPACT FEE 10-25 | ¤10,258.17 | 02/26/2026 |
| SEWER CREDIT | (¤1,342.00) | 02/26/2026 |
| WASTEWATER PERM INSPECTION | ¤80.00 | 02/26/2026 |
| WASTEWATER PERM REVIEW | ¤25.00 | 02/26/2026 |
| SEWER CAPITAL FACILITY | ¤4,415.00 | 02/26/2026 |
| WATER CAPITAL FACILITY FEE | ¤3,790.49 | 02/26/2026 |
| WATER PERMIT REVIEW | ¤25.00 | 02/26/2026 |
| WATER MAIN EXTENSION IMPACT | ¤917.27 | 02/26/2026 |
| SITE PLAN 30 | ¤30.00 | 02/26/2026 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤36,203.25 |