I want to search for...
Permit #2005010452
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00340-0220 |
| CONDITIONED SPACE: 1732 sqft |
| GARAGE: 467 sqft |
| SCREEN PORCH (SOLID ROOF) : 248 sqft |
| OPENED PORCH (WITH ROOF) : 49 sqft |
| Total Square Footage: 2496 sqft |
| Block: 0034 |
| Subdivision: - |
| Job Phone: (386)931-4741 |
| Location Address: 18 WOODFAIR LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/18/2005 |
| NOC: RECORDED |
| Applicant name: FOSTER H COLEMAN |
| Owner: RUSSO, VINCENT AND FRANCINE |
|
Address 18 WOODFAIR PALM COAST, FL 32137 |
| Lot: 220 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: SINGLE-FAMILY RESIDENCE |
| Type: CN |
Contractor
Fantastic Homes Const.Inc. (Foster Coleman)
| Status | Location Address | State License Number | Phone |
| CANCEL |
132 N PENINSULA DR DAYTONA BEACH, FL 32118 |
CGC003579 (Exp: 08/31/2016) | 386-307-1666 |
Sub Contractors
Masters Electric Inc. of S. Daytona (Electrical Contractor)
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1725 South Nova Road S. Daytona, FL 32119 |
EC000989 (Exp: 08/31/2006) | (386) 304-2600 | (386)304-9740 |
THEODORE BARRON JOHNSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 479 Flagler Beach, FL 32136 |
CAC057081 (Exp: 08/31/2026) | 386-333-1672 |
MARTIN JOHN EVANS
| Status | Location Address | State License Number |
| ACTIVE |
14 FORT CAROLINE CT BUNNELL, FL 32110 |
CFC057676 (Exp: 08/31/2026) |
FOSTER H COLEMAN
| Status | Location Address | State License Number | Phone |
| CANCEL |
20 RADCLIFFE DR PALM COAST, 32164 |
CGC003579 (Exp: 08/31/2006) | (386)931-4741 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 09/23/2005 | FINAL APPROVED | MMORATTO |
| UTILITY COMPANY FINAL | 09/22/2005 | APPROVED | RZALESKI |
| ENGINEERING FINAL | 09/21/2005 | APPROVED | FTORO |
| Note: THIS IS A REINSPECTION....$35 7 s.f. road damages $156 | |||
| ENGINEERING FINAL | 09/14/2005 | Disapproved - NO FEE | DSCHRAGER |
| Note: straw and seed exposed earth on adjacent property line clean out culvert ends 7 s.f. road damages remove dirt from right swale | |||
| PRE DRIVEWAY | 07/28/2005 | APPROVED | FTORO |
| INSULATION INSPECTION | 06/03/2005 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION...Missing one window on the right of main door entry. Window back ordered OK to drywall. | |||
| INSULATION INSPECTION | 06/02/2005 | CANCELLED BY APPLICANT | MMOORE |
| ALL ROUGH | 05/27/2005 | APPROVED - AS NOTED | JGIBSON |
| Note: Second half of window to be in by insulation. | |||
| TEMPORARY POLE | 05/25/2005 | CANCELLED BY APPLICANT | JGIBSON |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 05/12/2005 | APPROVED | ARAYMOND |
| Note: BLOCK REAR GABLE | |||
| LINTEL | 04/25/2005 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 04/05/2005 | APPROVED - AS NOTED | JHINDMAN |
| Note: revise plans for patio by lintel inspection | |||
| FIRST ROUGH PLUMBING INSPECTION | 03/31/2005 | APPROVED | JGIBSON |
| FIRST ROUGH PLUMBING INSPECTION | 03/30/2005 | CANCELLED BY APPLICANT | JG |
| TEMPORARY POLE | 03/30/2005 | APPROVED | JHINDMAN |
| Note: Spoke with susan at FPL on 4/5/05 to request temp. pole LMusgrove |
Review History
| Department | Status | Date In | Date Out |
| DSD | COMPLETE | 04/06/2005 | 04/08/2005 |
| Note: Released By: MWALLENBERG | |||
| BLD | COMPLETE | 02/02/2005 | 02/07/2005 |
| Note: Released By: LWOODROME 2-7-05 Approved for release as noted on plan cover sheet. Checked by FR released by LW | |||
| DSD | COMPLETE | 01/20/2005 | |
| Note: Released By: MWALLENBERG Held By: JCALVERT Need Sealed Survey | |||
| ENG | COMPLETE | 01/21/2005 | |
| Note: Released By: MLUNDGREN | |||
| LDS | COMPLETE | 01/31/2005 | |
| Note: Released By: CGOEWEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤156.00 | 09/23/2005 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 09/23/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 02/18/2005 |
| ADMIN FEE | ¤20.00 | 02/18/2005 |
| BUILDING CODE ADMIN FUND | ¤12.48 | 02/18/2005 |
| ELECTRIC FEE | ¤114.60 | 02/18/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 02/18/2005 |
| FIRE RES IMPACT FEE 4-1-04 | ¤168.91 | 02/18/2005 |
| MECHANICAL FEE | ¤114.60 | 02/18/2005 |
| PERMIT FEE | ¤549.90 | 02/18/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 02/18/2005 |
| PLAN CHECK FEE | ¤56.40 | 02/18/2005 |
| PLUMBING FEE | ¤114.60 | 02/18/2005 |
| RADON FEE | ¤12.48 | 02/18/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤5,440.88 |