I want to search for...
Permit #2005010976
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00600-0090 |
| CONDITIONED SPACE: 2437 sqft |
| GARAGE: 494 sqft |
| OPENED PORCH (WITH ROOF) : 109 sqft |
| SCREEN PORCH (SOLID ROOF) : 216 sqft |
| Total Square Footage: 3256 sqft |
| Block: 0060 |
| Subdivision: - |
| Job Phone: (386)447-5225 |
| Location Address: 6 BURREL PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/10/2005 |
| NOC: RECORDED |
| Applicant name: MOJI BABAZADEH |
| Owner: INTERVEST CONSTRUCTION, INC. |
|
Address 2379 BEVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 090 |
| Contracted Stated Job Value: ¤126,724.00 |
| Job Description: SINGLE-FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD Daytona Beach, FL 32119 |
CBC044682 (Exp: 08/31/2018) | (386)236-4133 | (386)763-7833 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 12/27/2005 | FINAL APPROVED | ARITTER |
| UTILITY COMPANY FINAL | 12/21/2005 | APPROVED | RZALESKI |
| Note: THIS IS A REINSPECTION | |||
| UTILITY COMPANY FINAL | 12/20/2005 | Disapproved - NO FEE | RZALESKI |
| Note: Failed because PEP service line not available at present | |||
| ENGINEERING FINAL | 12/19/2005 | APPROVED | FTORO |
| Note: THIS IS A REINSPECTION 35 s.f. road damages...bonded builder | |||
| RESIDENTIAL EARLY POWER | 12/15/2005 | APPROVED | JLEVRAULT |
| ENGINEERING FINAL | 12/15/2005 | Disapproved -FEE REQUIRED | FTORO |
| Note: place sod in swale and adjacent property swale where the dumpster is....remove dumpster\clean up street off all loose sand and gravel | |||
| PRE DRIVEWAY | 11/17/2005 | APPROVED | FTORO |
| INSULATION INSPECTION | 10/26/2005 | APPROVED | MMOORE |
| ALL ROUGH | 10/21/2005 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 10/19/2005 | Disapproved -FEE REQUIRED | ARITTER |
| Note: no pressure on second rough on plumbing garage door frames not installed | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/02/2005 | APPROVED - AS NOTED | MMOORE |
| Note: THIS IS A REINSPECTION 1. HGT AT 3-PLY FRONT WALL LOOSE NUTS 2. GROUT TRUSSES WITH STONELESS GROUT 3. HAVE ABOVE FINISHED FOR ALL-ROUGH INSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/30/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. 3-PLY T-41 EPOXY DID NOT SET AND IS DEFECTIVE/ BOLTS TO BE DRILLED-IN 12" BOLTS TO BE 3/4" IN DIAMETER 2. GABLE STRAPS IN GARAGE NOT NAILED TO TRUSS WEB AND ADD TOP AND BOTTOM GUSSETS AT EACH 3. GABLE END X-BRACING MASTER BED ROOM 4. ALL BOLTS STICKING-OUT TOO FAR AT BACK WALLS / PLATE/ DRILL MORE 5. ALL EYEBROWS TAPCON OR RAMSET 6. TRUSS T-34 AT PT BLOCK TAPCON OR RAMSET 7. 7. 2-PLY T101 MASTER BATH NAIL PATTERN 8. PORCH CORNER AT CMU'S/ STRAP NOT NAILED TO FRAMING 9. GROUT TRUSSES AT THIS POINT 10. SUPER STRAPS / MASTERBEDROOM/ RIGHT SIDE, LIVING ROOM, NOOK/ ONLY PARTIALLY NAILED TO STUDS IN PLACES 11. LOOSE NUTS...FIND THEM | |||
| LINTEL | 07/26/2005 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/20/2005 | APPROVED | ARITTER |
| FIRST ROUGH PLUMBING INSPECTION | 06/17/2005 | APPROVED | JGIBSON |
| FIRST ROUGH PLUMBING INSPECTION | 06/16/2005 | CANCELLED BY APPLICANT | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/31/2005 | 02/08/2005 |
| Note: Released By: JHINDMAN 2-8-05 approved for release as noted on the plan cover sheet. checked by D.R. reviewed by J.H. | |||
| DSD | COMPLETE | 01/31/2005 | 01/31/2005 |
| Note: Released By: JCALVERT | |||
| ENG | COMPLETE | 01/31/2005 | 02/08/2005 |
| Note: Released By: LAPTEKAR | |||
| LDS | COMPLETE | 01/31/2005 | 02/09/2005 |
| Note: Released By: CGOEWEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| STORMWATER REINSPECTION FEE | ¤35.00 | 11/17/2006 |
| REINSPECTION FEE | ¤40.00 | 12/27/2005 |
| REINSPECTION FEE | ¤40.00 | 12/27/2005 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 12/27/2005 |
| EARLY POWER INSPECTION | ¤40.00 | 12/27/2005 |
| FIRE RES IMPACT FEE 4-1-04 | ¤168.91 | 02/10/2005 |
| MECHANICAL FEE | ¤144.00 | 02/10/2005 |
| PERMIT FEE | ¤741.00 | 02/10/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 02/10/2005 |
| PLAN CHECK FEE | ¤76.00 | 02/10/2005 |
| PLUMBING FEE | ¤144.00 | 02/10/2005 |
| RADON FEE | ¤16.28 | 02/10/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 02/10/2005 |
| ADMIN FEE | ¤20.00 | 02/10/2005 |
| BUILDING CODE ADMIN FUND | ¤16.28 | 02/10/2005 |
| ELECTRIC FEE | ¤144.00 | 02/10/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 02/10/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤5,746.38 |