I want to search for...
Permit #2005020228
Permit Details
Status: COED
| CONDITIONED SPACE: 2002 sqft |
| GARAGE: 404 sqft |
| OPENED PORCH (WITH ROOF) : 63 sqft |
| SCREEN PORCH (SOLID ROOF) : 157 sqft |
| Total Square Footage: 2626 sqft |
| Subdivision: - |
| Job Phone: (386)672-3955 |
| Location Address: 10 MARSHVIEW LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/21/2005 |
| NOC: RECORDED |
| Applicant name: JERRY JAMES COLUMBUS |
| Owner: JOYCE J. VENDIT |
|
Address 32 COUNTRY FAIR LANE SCOTIA, NY 12302 |
| Lot: 67 |
| Contracted Stated Job Value: ¤270,000.00 |
| Job Description: SINGLE-FAMILY RESIDENCE |
| Type: CN |
Contractor
DISCOVERY HOMES INC.
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
300 INTERCHANGE BLVD. PORT ORANGE, FL 32129 |
SUITE B ORMOND BEACH, FL 32174 |
CGC046483 (Exp: 09/30/2008) | (386)672-3955 | (386)672-6958 |
Sub Contractors
PAUL NOEL BIELEFELDT
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
320 Aragon Street Holly Hill, FL 32117 |
EC0001646 (Exp: 08/31/2026) | (386) 677-0447 | 386-673-9868 |
RICHARD LEE VONBROCKEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1738 STATE AVE HOLLY HILL, FL 32117 |
CAC035516 (Exp: 08/31/2026) | (386)672-1950 | (386)672-1952 |
JERRY F TORDEUR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
4244 JACKSON ST Port Orange, FL 32119 |
CFC033863 (Exp: 08/31/2020) | (386) 761-3526 | (386)761-0132 |
GREGORY A HAGEMAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
545 Parque Drive Ormond Beach, FL 32174 |
CCC021394 (Exp: 08/31/2026) | (386) 672-2821 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 10/13/2006 | FINAL APPROVED | LHITES |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 10/11/2006 | Disapproved -FEE REQUIRED | LHITES |
| Note: 1) NEED SERVICE OUTLET FOR A/C UNIT 2) NEED ENERGY CALC SHEETS | |||
| STORMWATER FINAL INSPECTION | 10/05/2006 | APPROVED | DRANDALL |
| ENGINEERING FINAL | 10/03/2006 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: need final surveys to the Stormwater final before this can be scheduled | |||
| RESIDENTIAL EARLY POWER | 09/26/2006 | APPROVED | RMARVEL |
| UTILITY COMPANY FINAL | 06/27/2006 | APPROVED | TSCHWEERS |
| INSULATION INSPECTION | 03/07/2006 | APPROVED | JMCGOWEN |
| ALL ROUGH | 02/08/2006 | APPROVED | JMCGOWEN |
| ALL ROUGH | 02/06/2006 | APPROVED | JMCGOWEN |
| ALL ROUGH | 02/03/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 01/31/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: THIS IS A REINSPECTION a/c ducts still missing, tub still not installed | |||
| ALL ROUGH | 01/24/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: FIRE STOP MISSING, INSTALL TUB, A/C DUCTS MISSING IN MASTER BED ROOM | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/29/2005 | APPROVED | JMCGOWEN |
| LINTEL | 08/26/2005 | APPROVED | MMORATTO |
| MONOLITHIC SLAB INSPECTION/SLAB | 08/09/2005 | APPROVED | JMCGOWEN |
| FIRST ROUGH PLUMBING INSPECTION | 08/08/2005 | APPROVED | JMCGOWEN |
| FIRST ROUGH PLUMBING INSPECTION | 08/05/2005 | Disapproved -FEE REQUIRED | ARAYMOND |
| Note: 1. NO HEAD PRESSURE ON SANITARY PIPE. 2. UNCOVER FITTINGS FOR INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/31/2006 | 02/02/2006 |
| Note: Released By: LWOODROME Replacement plans stamped | |||
| BLD | COMPLETE | 02/09/2005 | 02/14/2005 |
| Note: Released By: JHINDMAN 2-14-05 approved for release as noted on the plan cover sheet. checked by D.R. reviewed by J.H. | |||
| DSD | COMPLETE | 02/04/2005 | 02/09/2005 |
| Note: Released By: JCALVERT | |||
| ENG | COMPLETE | 02/04/2005 | 02/16/2005 |
| Note: Released By: LAPTEKAR | |||
| LDS | COMPLETE | 02/04/2005 | 02/10/2005 |
| Note: Released By: CGOEWEY | |||
| DSD | COMPLETE | 03/02/2005 | |
| Note: Released By: JCALVERT Held By: JCALVERT House changed need new building palns |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 10/18/2006 |
| REINSPECTION FEE | ¤40.00 | 10/18/2006 |
| REINSPECTION FEE | ¤40.00 | 10/18/2006 |
| REINSPECTION FEE | ¤40.00 | 10/18/2006 |
| REINSPECTION FEE | ¤40.00 | 10/18/2006 |
| REVISION | ¤40.00 | 10/18/2006 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 02/21/2005 |
| ADMIN FEE | ¤20.00 | 02/21/2005 |
| BUILDING CODE ADMIN FUND | ¤13.13 | 02/21/2005 |
| ELECTRIC FEE | ¤192.00 | 02/21/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 02/21/2005 |
| FIRE RES IMPACT FEE 4-1-04 | ¤168.91 | 02/21/2005 |
| MECHANICAL FEE | ¤192.00 | 02/21/2005 |
| PERMIT FEE | ¤1,053.00 | 02/21/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 02/21/2005 |
| PLAN CHECK FEE | ¤108.00 | 02/21/2005 |
| PLUMBING FEE | ¤192.00 | 02/21/2005 |
| RADON FEE | ¤13.13 | 02/21/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤6,278.08 |