I want to search for...
Permit #2005020290
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00150-0340 |
| CONDITIONED SPACE: 1739 sqft |
| GARAGE: 505 sqft |
| OPENED PORCH (WITH ROOF) : 218 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2494 sqft |
| Block: 0015 |
| Subdivision: - |
| Job Phone: (386)931-4741 |
| Location Address: 6 PRINCE MICHAEL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/07/2005 |
| NOC: RECORDED |
| Applicant name: Fantastic Homes Const.Inc. (Foster Coleman) |
| Owner: SHEKHTMAN, BROSI & LIDIYA KOLESNIK |
|
Address 3093 BRIGHTON 4TH ST. #2N BROOKLYN, NY 11235 |
| Lot: 340 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE-FAMILY RESIDENCE |
| Type: CN |
Contractor
Fantastic Homes Const.Inc. (Foster Coleman)
| Status | Location Address | State License Number | Phone |
| CANCEL |
132 N PENINSULA DR DAYTONA BEACH, FL 32118 |
CGC003579 (Exp: 08/31/2016) | 386-307-1666 |
Sub Contractors
THEODORE BARRON JOHNSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 479 Flagler Beach, FL 32136 |
CAC057081 (Exp: 08/31/2026) | 386-333-1672 |
Masters Electric Inc. of S. Daytona (Electrical Contractor)
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1725 South Nova Road S. Daytona, FL 32119 |
EC000989 (Exp: 08/31/2006) | (386) 304-2600 | (386)304-9740 |
MARTIN JOHN EVANS
| Status | Location Address | State License Number |
| ACTIVE |
14 FORT CAROLINE CT BUNNELL, FL 32110 |
CFC057676 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/28/2006 | FINAL APPROVED | TOUTLAND |
| FINAL COMPLETE BUILDING INSPECTION | 02/27/2006 | CANCELLED BY APPLICANT | TOUTLAND |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 02/24/2006 | CANCELLED BY APPLICANT | DR |
| UTILITY COMPANY FINAL | 02/21/2006 | APPROVED | RANDRADE |
| ENGINEERING FINAL | 02/13/2006 | APPROVED | BFCHAMBERLAIN |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 02/13/2006 | CANCELLED BY APPLICANT | KJOHNSON |
| ENGINEERING FINAL | 02/01/2006 | Disapproved -FEE REQUIRED | BFCHAMBERLAIN |
| Note: seed and straw alnog rear | |||
| DRIVEWAY | 10/10/2005 | APPROVED | FCHAMBERLAIN |
| INSULATION INSPECTION | 07/21/2005 | APPROVED | JHINDMAN |
| Note: | |||
| ALL ROUGH | 07/15/2005 | APPROVED | MMORATTO |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 06/14/2005 | APPROVED | MMORATTO |
| TEMPORARY POLE | 05/25/2005 | APPROVED - AS NOTED | JANDREASEN |
| Note: called power 5/25/05 -Barbie call power 8/24/05 ecoyne 1. PROVIDE GFCI BREAKER FOR 220 OUTLET OR REMOVE BREAK. | |||
| LINTEL | 05/19/2005 | APPROVED | ARAYMOND |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 05/18/2005 | Disapproved -FEE REQUIRED | ARAYMOND |
| Note: 1. NO BOND BEAM TRANSITION DETAIL. PROVIDE ENGINEERING FOR ENTRY STEP TO THE BUILDING DEPT. TO APPROVAL PRIOR TO NEXT INSPECTION 2. MISSED CELL | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 04/26/2005 | APPROVED | JHINDMAN |
| FIRST ROUGH PLUMBING INSPECTION | 04/21/2005 | APPROVED - AS NOTED | JGIBSON |
| Note: Check for new plans old ones were flipped |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/11/2005 | 02/15/2005 |
| Note: Released By: LWOODROME 2-15-05 Approved for release as noted on plan cover sheet. Checked by FR released by LW | |||
| DSD | COMPLETE | 02/07/2005 | 02/11/2005 |
| Note: Released By: JCALVERT | |||
| ENG | COMPLETE | 02/07/2005 | 02/11/2005 |
| Note: Released By: MLUNDGREN | |||
| LDS | COMPLETE | 02/07/2005 | 02/17/2005 |
| Note: Released By: DWARD | |||
| BLD | COMPLETE | 04/07/2005 | |
| Note: Released By: LWOODROME 4-7-05 Approved for release as noted on plan cover sheet. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/03/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/03/2006 |
| REVISION | ¤40.00 | 04/26/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 03/07/2005 |
| ADMIN FEE | ¤20.00 | 03/07/2005 |
| BUILDING CODE ADMIN FUND | ¤12.47 | 03/07/2005 |
| ELECTRIC FEE | ¤115.20 | 03/07/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 03/07/2005 |
| FIRE RES IMPACT FEE 4-1-04 | ¤168.91 | 03/07/2005 |
| MECHANICAL FEE | ¤115.20 | 03/07/2005 |
| PERMIT FEE | ¤553.80 | 03/07/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 03/07/2005 |
| PLAN CHECK FEE | ¤56.80 | 03/07/2005 |
| PLUMBING FEE | ¤115.20 | 03/07/2005 |
| RADON FEE | ¤12.47 | 03/07/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤5,370.96 |