| Type |
Request Date |
Result |
Inspector |
|
FINAL COMPLETE BUILDING INSPECTION |
12/28/2005 |
FINAL APPROVED |
JLEVRAULT |
|
Note: THIS IS A REINSPECTION
|
|
FINAL COMPLETE BUILDING INSPECTION |
12/22/2005 |
Disapproved -FEE REQUIRED |
JLEVRAULT |
|
Note: THIS IS A REINSPECTION Wires crossing over garage attic access.
|
|
FINAL COMPLETE BUILDING INSPECTION |
12/21/2005 |
Disapproved -FEE REQUIRED |
JLEVRAULT |
|
Note: Hole cut in garage ceiling.Rear bonus room deck rail not complete.
|
|
UTILITY COMPANY FINAL |
12/15/2005 |
APPROVED |
RZALESKI |
|
Note: THIS IS A REINSPECTION
|
|
UTILITY COMPANY FINAL |
12/14/2005 |
Disapproved - NO FEE |
RZALESKI |
|
Note: Cannot find sewer clean out
|
|
UTILITY COMPANY FINAL |
12/13/2005 |
Disapproved - NO FEE |
RZALESKI |
|
Note: Cannot find sewer clean out
|
|
ENGINEERING FINAL |
12/12/2005 |
APPROVED |
FTORO |
|
Note: 12 s.f. road damages...bond will be used
|
|
RESIDENTIAL EARLY POWER |
12/07/2005 |
APPROVED |
JLEVRAULT |
|
DRIVEWAY |
11/16/2005 |
APPROVED |
FTORO |
|
INSULATION INSPECTION |
09/19/2005 |
APPROVED |
MMOORE |
|
ALL ROUGH |
09/14/2005 |
APPROVED |
ARITTER |
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
07/28/2005 |
APPROVED |
MMOORE |
|
Note: ..THIS IS A REINSPECTION...GARAGE ENTRY DOOR FROM GARAGE/ ON RIGHT BOLT PLATE 2. TRUSS T08 AT LANDING NOT STRAPPED BELOW/ MISSING STUD FROM LANDING TO CONCRETE 3. COMPLETE FOR ALL-ROUGH 4.
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
07/27/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: THIS IS A REINSPECTION...NO PLANS/ MISSING NON-COMPLIANCE SHEET FROM INSPECTION BOX
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
07/13/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: THIS IS A REINSPECTION...trusses not grouted from from first inspection...check other items from first non-compliance and found another list of items
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
06/03/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: No plans, permit, placard. Clean-up job site. Straps poured into lintel are bent over to reach the truss as much as 2". These must be packed-out with #2 yellow pine or a Tappconned hanger in its place. Cannot inspect wall sheathing due to the anchoring system is on the plans. So, check all anchorage before calling-in the sheathing inspection. The wall and roof sheathing will be done at the sheathing inspection. Grout under all trusses before All Rough Inspection.
|
|
LINTEL |
05/11/2005 |
APPROVED |
MMOORE |
|
MONOLITHIC SLAB INSPECTION/SLAB |
04/26/2005 |
APPROVED |
MMOORE |
|
FIRST ROUGH PLUMBING INSPECTION |
04/25/2005 |
APPROVED - AS NOTED |
JGIBSON |
|
Note: dryer vent exceeds25' rule.
|