I want to search for...
Permit #2005040200
Permit Details
Status: COED
| Parcel Id: 07-11-31-7023-00230-0120 |
| CONDITIONED SPACE: 2068 sqft |
| GARAGE: 654 sqft |
| SCREEN PORCH (SOLID ROOF) : 246 sqft |
| OPENED PORCH (WITH ROOF) : 83 sqft |
| Total Square Footage: 3051 sqft |
| Block: 0023 |
| Subdivision: - |
| Job Phone: (386) 445-7001 |
| Location Address: 34 WHITTINGHAM LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/07/2005 |
| NOC: RECORDED |
| Applicant name: RICHARD M. ANDERSON |
| Owner: FRANK & LINDA DROGO |
|
Address 109 N E 2 TERRACE HALLANDALE, FL 33009 |
| Lot: 120 |
| Contracted Stated Job Value: ¤193,500.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
PALM WEST HOME BUILDERS, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 Florida Park Drive North Palm Coast, FL 32137 |
CRC054633 (Exp: 08/31/2026) | (386) 445-7001 | (386)446-5941 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/28/2006 | FINAL APPROVED | ARITTER |
| UTILITY COMPANY FINAL | 02/24/2006 | APPROVED | RANDRADE |
| ENGINEERING FINAL | 02/23/2006 | APPROVED | BFCHAMBERLAIN |
| Note: THIS IS A REINSPECTION | |||
| ENGINEERING FINAL | 02/02/2006 | Disapproved -FEE REQUIRED | BFCHAMBERLAIN |
| Note: seed and straw along rear lot Left side of lot is draining onto neighboring lot.........must be corrected | |||
| DRIVEWAY | 01/12/2006 | APPROVED | BFCHAMBERLAIN |
| RESIDENTIAL EARLY POWER | 12/15/2005 | APPROVED | JGIBSON |
| INSULATION INSPECTION | 09/15/2005 | APPROVED | MMORATTO |
| ALL ROUGH | 09/13/2005 | APPROVED | ARITTER |
| DOWN CELL | 08/23/2005 | APPROVED | ARAYMOND |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 08/15/2005 | Disapproved -FEE REQUIRED | ARAYMOND |
| Note: ROOF SHEATHING O.K 1. MISSED FILLED CELL REAR PORCH. 2. UPLIFT PATH NOT CONTINIOUS AT A1 GARAGE, A18 AT BATH WALL. 3. MISSING STRAPS AT E3 ENTRY. | |||
| LINTEL | 07/14/2005 | APPROVED | MMOORE |
| TEMPORARY POLE | 06/29/2005 | APPROVED | TOUTLAND |
| Note: called FPL 06/29/05 ecoyne | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 06/29/2005 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 06/27/2005 | APPROVED | ARITTER |
| FIRST ROUGH PLUMBING INSPECTION | 06/24/2005 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: No pressuer on sanitary or water lines. |
Review History
| Department | Status | Date In | Date Out |
| DSD | COMPLETE | 04/06/2005 | 04/18/2005 |
| Note: Released By: JGONZALEZ Held By: JCALVERT Held By: JCALVERT Need Recorded Deed Sent for building review | |||
| ENG1 | COMPLETE | 04/06/2005 | 04/07/2005 |
| Note: Released By: MLUNDGREN | |||
| URB | COMPLETE | 04/06/2005 | 04/14/2005 |
| Note: Released By: CGOEWEY | |||
| BLD | COMPLETE | 05/10/2005 | |
| Note: Released By: CCOTE Held By: CCOTE Placed on Hold by Carl Cote, 5/10/05, fax sent. Awaiting FL engineer stamped drawings and structural items per fax. 6/2/05_Items received. 6/2/05_Approved for Release per plan cover sheet. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 03/01/2006 |
| REINSPECTION FEE | ¤40.00 | 03/01/2006 |
| REINSPECTION FEE | ¤40.00 | 03/01/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 03/01/2006 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 06/07/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 06/07/2005 |
| ADMIN FEE | ¤20.00 | 06/07/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 06/07/2005 |
| BUILDING CODE ADMIN FUND | ¤15.26 | 06/07/2005 |
| ELECTRIC FEE | ¤146.40 | 06/07/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 06/07/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 06/07/2005 |
| MECHANICAL FEE | ¤146.40 | 06/07/2005 |
| PERMIT FEE | ¤756.60 | 06/07/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 06/07/2005 |
| PLAN CHECK FEE | ¤77.60 | 06/07/2005 |
| PLUMBING FEE | ¤146.40 | 06/07/2005 |
| RADON FEE | ¤15.26 | 06/07/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,463.30 |