| Parcel Id: 07-11-31-7011-00130-0730 |
| CONDITIONED SPACE: 356 sqft |
| CONDITIONED SPACE: 2474 sqft |
| GARAGE: 555 sqft |
| SCREEN PORCH (SOLID ROOF) : 217 sqft |
| OPENED PORCH (WITH ROOF) : 108 sqft |
| Total Square Footage: 3710 sqft |
| Block: 0013 |
| Subdivision: - |
| Job Phone: (386)447-5225 |
| Location Address: 33 BEACON MILL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/01/2005 |
| NOC: RECORDED |
| Applicant name: MOJI BABAZADEH |
| Owner: INTERVEST CONSTRUCTION |
| Lot: 730 |
| Contracted Stated Job Value: ¤193,460.00 |
| Type: CN |
| Type |
Request Date |
Result |
Inspector |
|
FINAL COMPLETE BUILDING INSPECTION |
01/25/2006 |
FINAL APPROVED |
MMOORE |
|
Note: THIS IS A REINSPECTION
|
|
FINAL COMPLETE BUILDING INSPECTION |
01/23/2006 |
CANCELLED BY APPLICANT |
MMOORE |
|
ENGINEERING FINAL |
01/17/2006 |
APPROVED |
BFCHAMBERLAIN |
|
Note: THIS IS A REINSPECTION
20 s.f. road damage ......$260
|
|
UTILITY COMPANY FINAL |
01/12/2006 |
APPROVED |
RANDRADE |
|
RESIDENTIAL EARLY POWER |
01/11/2006 |
APPROVED |
JLEVRAULT |
|
ELECTRICAL FINAL |
01/10/2006 |
CANCELLED BY INSPECTOR |
JLEVRAULT |
|
ENGINEERING FINAL |
01/04/2006 |
Disapproved -FEE REQUIRED |
BFCHAMBERLAIN |
|
Note: Sweep street clean
remove debris from driveway and rear porch
|
|
PRE DRIVEWAY |
11/23/2005 |
APPROVED |
FTORO |
|
INSULATION INSPECTION |
10/28/2005 |
APPROVED |
MMOORE |
|
ALL ROUGH |
10/14/2005 |
APPROVED |
ARAYMOND |
|
Note: THIS IS A REINSPECTION
|
|
ALL ROUGH |
10/11/2005 |
CANCELLED BY APPLICANT |
JLEVRAULT |
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
10/07/2005 |
APPROVED |
MMOORE |
|
Note: THIS IS A REINSPECTION
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
10/05/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: 1. fix straps at trusses 2. tighten bolts 3. nail ledgers 4. fix front garage truss 5. grout trusses 6. 2 bolts garage shear/ drill
|
|
TEMPORARY POLE |
09/28/2005 |
APPROVED |
JLEVRAULT |
|
Note: LIBBY - SUSAN - 9:00 - -9-29-05
|
|
LINTEL |
09/20/2005 |
APPROVED |
MMOORE |
|
Note: THIS IS A REINSPECTION
|
|
LINTEL |
09/19/2005 |
CANCELLED BY APPLICANT |
MMOORE |
|
MONOLITHIC SLAB INSPECTION/SLAB |
09/02/2005 |
APPROVED |
ARAYMOND |
|
FIRST ROUGH PLUMBING INSPECTION |
09/01/2005 |
APPROVED |
ARITTER |
|
FIRST ROUGH PLUMBING INSPECTION |
08/31/2005 |
CANCELLED BY INSPECTOR |
MMOORE |