| Parcel Id: 07-11-31-7034-00880-0240 |
| CONDITIONED SPACE: 2132 sqft |
| GARAGE: 741 sqft |
| SCREEN PORCH (SOLID ROOF) : 387 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| Total Square Footage: 3290 sqft |
| Block: 0088 |
| Subdivision: - |
| Job Phone: (386)447-5225 |
| Location Address: 38 ETHAN ALLEN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/09/2005 |
| NOC: RECORDED |
| Applicant name: MOJI BABAZADEH |
| Owner: INTERVEST CONSTRUCTION |
| Lot: 240 |
| Contracted Stated Job Value: ¤183,986.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
| Type |
Request Date |
Result |
Inspector |
|
FINAL COMPLETE BUILDING INSPECTION |
05/09/2006 |
FINAL APPROVED |
JGIBSON |
|
Note: THIS IS A REINSPECTION
|
|
FINAL COMPLETE BUILDING INSPECTION |
05/05/2006 |
CANCELLED BY APPLICANT |
JGIBSON |
|
ENGINEERING FINAL |
04/24/2006 |
APPROVED |
MBRENNAN |
|
Note: THIS IS A REINSPECTION
Pass per MB.\\wk
|
|
UTILITY COMPANY FINAL |
04/20/2006 |
APPROVED |
RANDRADE |
|
UTILITY COMPANY FINAL |
04/18/2006 |
APPROVED |
RANDRADE |
|
ENGINEERING FINAL |
04/18/2006 |
Disapproved -FEE REQUIRED |
GLALIMA |
|
Note: THIS IS A REINSPECTION SAME , NEED TO CLEAN UP MEDIAN , ACROSS THE STREET, ALL TRASH AND RE SOD MADIAN PER, REPORT
|
|
RESIDENTIAL EARLY POWER |
03/30/2006 |
APPROVED |
JGIBSON |
|
Note: THIS IS A REINSPECTION
|
|
RESIDENTIAL EARLY POWER |
03/16/2006 |
Disapproved -FEE REQUIRED |
JGIBSON |
|
Note: Outlet on back of house not safe, diswasher & disposal does not meet NEC 422.31.
|
|
ENGINEERING FINAL |
02/02/2006 |
Disapproved -FEE REQUIRED |
FTORO |
|
Note: place sod in median
complete sodding of property
pick up trash in median
|
|
PRE DRIVEWAY |
01/03/2006 |
APPROVED |
FTORO |
|
INSULATION INSPECTION |
12/01/2005 |
APPROVED |
DROCKWELL |
|
Note: THIS IS A REINSPECTION
|
|
INSULATION INSPECTION |
11/29/2005 |
Disapproved -FEE REQUIRED |
JGIBSON |
|
Note: Window mullions not secured @ front & rear windows.
|
|
ALL ROUGH |
11/22/2005 |
APPROVED |
JGIBSON |
|
Note: THIS IS A REINSPECTION
|
|
ALL ROUGH |
11/17/2005 |
Disapproved -FEE REQUIRED |
JGIBSON |
|
Note: Triple girder not nailed, fire place not straped.
|
|
ALL ROUGH |
11/14/2005 |
Disapproved -FEE REQUIRED |
JGIBSON |
|
Note: See list in box.
|
|
ALL ROUGH |
11/07/2005 |
CANCELLED BY APPLICANT |
JGIBSON |
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
10/13/2005 |
APPROVED |
DROCKWELL |
|
LINTEL |
08/09/2005 |
APPROVED |
JGIBSON |
|
Note: THIS IS A REINSPECTION
|
|
FIRST ROUGH PLUMBING INSPECTION |
07/29/2005 |
APPROVED |
JGIBSON |
|
Note: THIS IS A REINSPECTION
|
|
MONOLITHIC SLAB INSPECTION/SLAB |
07/29/2005 |
APPROVED |
JGIBSON |
|
LINTEL |
07/29/2005 |
CANCELLED BY APPLICANT |
JGIBSON |
|
FIRST ROUGH PLUMBING INSPECTION |
07/28/2005 |
CANCELLED BY APPLICANT |
LMUSGROVE |