I want to search for...
Permit #2005040457
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00030-1590 |
| CONDITIONED SPACE: 2437 sqft |
| GARAGE: 585 sqft |
| OPENED PORCH (WITH ROOF) : 108 sqft |
| SCREEN PORCH (SOLID ROOF) : 217 sqft |
| Total Square Footage: 3347 sqft |
| Block: 0003 |
| Subdivision: - |
| Job Phone: (386)447-5225 |
| Location Address: 73 BALTIMORE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/20/2005 |
| NOC: RECORDED |
| Applicant name: MOJI BABAZADEH |
| Owner: INTERVEST CONSTRUCTION |
|
Address 3 COMMERCE BLVD PALM COAST, FL 32137 |
| Lot: 159 |
| Contracted Stated Job Value: ¤191,230.00 |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD Daytona Beach, FL 32119 |
CBC044682 (Exp: 08/31/2018) | (386)236-4133 | (386)763-7833 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 01/25/2006 | FINAL APPROVED | MMOORE |
| UTILITY COMPANY FINAL | 01/23/2006 | APPROVED | RANDRADE |
| ENGINEERING FINAL | 01/23/2006 | APPROVED | BFCHAMBERLAIN |
| Note: THIS IS A REINSPECTION | |||
| UTILITY COMPANY FINAL | 01/17/2006 | APPROVED | RANDRADE |
| ENGINEERING FINAL | 01/17/2006 | Disapproved -FEE REQUIRED | BFCHAMBERLAIN |
| Note: seed and straw along left and rear prop lines open swale by "no outlet' lign to meet existing swale remove silt fence & wood from left adj swale | |||
| RESIDENTIAL EARLY POWER | 12/20/2005 | APPROVED | JLEVRAULT |
| DRIVEWAY | 12/16/2005 | APPROVED | FTORO |
| Note: THIS IS A REINSPECTION | |||
| DRIVEWAY | 12/14/2005 | CANCELLED BY APPLICANT | KJOHNSON |
| Note: Richard called and canceled inspection.//kj | |||
| INSULATION INSPECTION | 11/14/2005 | APPROVED | MMOORE |
| INSULATION INSPECTION | 11/10/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: NOT INSULATION - 11:30AM | |||
| ALL ROUGH | 11/09/2005 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 11/08/2005 | CANCELLED BY APPLICANT | JLEVRAULT |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/19/2005 | APPROVED | JGIBSON |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 10/18/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. nail garage truss to ledger 2. nail garage 2x4's full length with gussets at gable 3. garage shear plate add bolt 4. fireplace/ add rafter straps 5. great room exit door exit door on right add bolt at plate 6. grout trusses 7. grout/ clean holes/ all bolted anchorage 8. add strap to right side of 2nd truss inside master bath | |||
| TEMPORARY POLE | 10/11/2005 | APPROVED | JLEVRAULT |
| TEMPORARY POLE | 10/10/2005 | APPROVED | MMOORE |
| Note: called fpl on 10/12/05 at 8:15am Damaris | |||
| LINTEL | 10/07/2005 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 09/20/2005 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 09/15/2005 | APPROVED | ARAYMOND |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 09/14/2005 | Disapproved -FEE REQUIRED | ARITTER |
| Note: THIS IS A REINSPECTION 1. NO PRESSURE ON GAUGE FOR UF WATER LINE TEST- SAME AS YESTERDAY. 2. ONLY ONE FOOT OF WATER ON MAIN STACK CHECK FOR LEAK. | |||
| FIRST ROUGH PLUMBING INSPECTION | 09/13/2005 | Disapproved -FEE REQUIRED | ARITTER |
| Note: THIS IS A REINSPECTION NO PRESSURE ON GAUGE FOR UF WTER LINE TEST 2. NO HEAD OF WATER ON STACK FOR WASTE LINE TEST | |||
| FIRST ROUGH PLUMBING INSPECTION | 09/07/2005 | CANCELLED BY APPLICANT | ARITTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/25/2005 | 05/09/2005 |
| Note: Released By: CCOTE Held By: CCOTE Placed on Hold by Carl Cote, 5/9/05, fax sent. Awaiting structural items per fax. 5/13/05_Items Recieved. 5/16/05_Approved for Release per plan cover sheet. | |||
| DSD | COMPLETE | 04/13/2005 | 05/02/2005 |
| Note: Released By: MWALLENBERG | |||
| ENG1 | COMPLETE | 04/13/2005 | 05/20/2005 |
| Note: Released By: LAPTEKAR ROW was in main file ...approved when I found it | |||
| URB | COMPLETE | 04/13/2005 | 04/25/2005 |
| Note: Released By: JCALVERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 01/26/2006 |
| REINSPECTION FEE | ¤40.00 | 01/26/2006 |
| REINSPECTION FEE | ¤40.00 | 01/26/2006 |
| REINSPECTION FEE | ¤40.00 | 01/26/2006 |
| REINSPECTION FEE | ¤40.00 | 01/26/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 05/20/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 05/20/2005 |
| ADMIN FEE | ¤20.00 | 05/20/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 05/20/2005 |
| BUILDING CODE ADMIN FUND | ¤16.74 | 05/20/2005 |
| ELECTRIC FEE | ¤146.40 | 05/20/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 05/20/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 05/20/2005 |
| MECHANICAL FEE | ¤146.40 | 05/20/2005 |
| PERMIT FEE | ¤756.60 | 05/20/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 05/20/2005 |
| PLAN CHECK FEE | ¤77.60 | 05/20/2005 |
| PLUMBING FEE | ¤146.40 | 05/20/2005 |
| RADON FEE | ¤16.74 | 05/20/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,511.26 |