I want to search for...

Permit #2005040848

Permit Details

Status: COED

Parcel Id: 07-11-31-7060-00310-0070
CONDITIONED SPACE: 1923 sqft
GARAGE: 496 sqft
SCREEN PORCH (SOLID ROOF) : 164 sqft
OPENED PORCH (WITH ROOF) : 61 sqft
Total Square Footage: 2644 sqft
Block: 0031
Subdivision: -
Job Phone: (386)447-5225
Location Address: 91 SLOGANEER TRL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/19/2005
NOC: RECORDED
Applicant name: MOJI BABAZADEH
Owner: MHK OF VOLUSIA COUNTY INC.

Address

2379 BEVILLE ROAD

DAYTONA BEACH, FL 32119

Lot: 070
Contracted Stated Job Value: ¤152,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
CANCEL

2379 BEVILLE ROAD

Daytona Beach, FL 32119

CBC044682 (Exp: 08/31/2018) (386)236-4133 (386)763-7833

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 03/22/2006 FINAL APPROVED DROCKWELL
ENGINEERING FINAL 03/20/2006 APPROVED DSCHRAGER
Note: THIS IS A REINSPECTION...0 road damages
ENGINEERING FINAL 03/16/2006 CANCELLED BY APPLICANT DSCHRAGER
Note: THIS IS A REINSPECTION CANCEL PER DON AND MARK
ENGINEERING FINAL 03/06/2006 Disapproved -FEE REQUIRED DSCHRAGER
Note: THIS IS A REINSPECTION - Sod left adjacent property swale. - Seed and straw exposed earth on left and right property lines. - Remove trash and debris from left and right property lines. - Need a more maintainable slope on rear property line.
UTILITY COMPANY FINAL 03/06/2006 APPROVED RANDRADE
Note: THIS IS A REINSPECTION
RESIDENTIAL EARLY POWER 02/03/2006 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ENGINEERING FINAL 01/27/2006 Disapproved -FEE REQUIRED FTORO
Note: remove dumpster and regrade swale place sod in adjacent property swale 23 s.f. road damages clean up street of all loose sand and pickl up trash across the street and around the dumpster
UTILITY COMPANY FINAL 01/25/2006 Disapproved - NO FEE RANDRADE
Note: FAILED, NEEDS ELECTRICAL FOR PEP PANEL FROM HOUSE PANEL
RESIDENTIAL EARLY POWER 01/24/2006 Disapproved -FEE REQUIRED DROCKWELL
Note: Show grounds
DRIVEWAY 12/21/2005 APPROVED BFCHAMBERLAIN
INSULATION INSPECTION 11/29/2005 APPROVED DROCKWELL
ALL ROUGH 11/23/2005 CANCELLED BY APPLICANT AIRS WEB
ALL ROUGH 11/22/2005 APPROVED DROCKWELL
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/18/2005 APPROVED DROCKWELL
LINTEL 08/25/2005 APPROVED DROCKWELL
MONOLITHIC SLAB INSPECTION/SLAB 08/17/2005 APPROVED DROCKWELL
FIRST ROUGH PLUMBING INSPECTION 08/15/2005 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
FIRST ROUGH PLUMBING INSPECTION 08/12/2005 CANCELLED BY APPLICANT DROCKWELL
PRE DRIVEWAY 06/07/2005 APPROVED - AS NOTED BRCHAMBERLAIN
Note: Cracked 1 ft from edge. 25 sf existing road damage.

Review History

Department Status Date In Date Out
BLD COMPLETE 05/16/2005 05/18/2005
Note: Released By: CCOTE 5/17/05_Approved for Release per plan cover sheet.
ENG1 COMPLETE 04/22/2005 04/27/2005
Note: Released By: LAPTEKAR
URB COMPLETE 04/22/2005 04/28/2005
Note: Released By: CGOEWEY
ZON COMPLETE 04/22/2005 05/16/2005
Note: Released By: HHERKERT Held By: JCALVERT Address check sent to E-911 Need Drop Lot Process after address confirmed

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 03/23/2006
EARLY POWER INSPECTION ¤40.00 03/23/2006
REINSPECTION FEE ¤40.00 03/23/2006
STORMWATER REINSPECTION FEE ¤35.00 03/23/2006
STORMWATER REINSPECTION FEE ¤35.00 03/23/2006
TRANSPORTATION IMPACT FEE3/RES ¤2,885.00 05/19/2005
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 05/19/2005
ADMIN FEE ¤20.00 05/19/2005
ARC HOUSE REVIEW ¤125.00 05/19/2005
BUILDING CODE ADMIN FUND ¤13.22 05/19/2005
ELECTRIC FEE ¤122.40 05/19/2005
ENGINEERING PERMIT FEES ¤80.00 05/19/2005
FIRE RES IMPACT FEE 4-1-05 ¤173.47 05/19/2005
MECHANICAL FEE ¤122.40 05/19/2005
PERMIT FEE ¤600.60 05/19/2005
PARKS IMPACT FEE 11-2-04 ¤1,120.91 05/19/2005
PLAN CHECK FEE ¤61.60 05/19/2005
PLUMBING FEE ¤122.40 05/19/2005
RADON FEE ¤13.22 05/19/2005
Fees Total Due: ¤0.00 Total Paid: ¤9,250.22