Permit #2005050178
Permit Details
Status: COED
| CONDITIONED SPACE: 2916 sqft |
| GARAGE: 482 sqft |
| OPENED PORCH (WITH ROOF) : 324 sqft |
| Total Square Footage: 3722 sqft |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: (386)447-5225 |
| Location Address: 3 PARK LN |
| Type: RRI - RESIDENTIAL RE-ISSUE PERMIT |
| Issue Date: 05/31/2005 |
| NOC: RECORDED |
| Applicant name: MOJI BABAZADEH |
| Owner: INTERVEST CONSTRUCTION, INC. |
|
Address 2359 BELVILLE ROAD DAYTONA BEACH, FL 32119 |
| Lot: 124 |
| Contracted Stated Job Value: ¤152,000.00 |
| Job Description: REISSUE SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2379 BEVILLE ROAD Daytona Beach, FL 32119 |
CBC044682 (Exp: 08/31/2018) | (386)236-4133 | (386)763-7833 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 12/20/2005 | FINAL APPROVED | JMCGOWEN |
| UTILITY COMPANY FINAL | 12/16/2005 | APPROVED | RZALESKI |
| ENGINEERING FINAL | 12/15/2005 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: already passed this inspection | |||
| ENGINEERING FINAL | 12/08/2005 | APPROVED | FTORO |
| INSULATION INSPECTION | 10/17/2005 | APPROVED | JMCGOWEN |
| ALL ROUGH | 10/12/2005 | APPROVED | JMCGOWEN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/26/2005 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| EXTERIOR WALL SHEATHING/SHEAR WALL | 07/26/2005 | APPROVED | JMCGOWEN |
| Note: need strap and tie-down detail for first to second floor inteior | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 07/26/2005 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: all bracing, straps, bolts, and tie-downs must be in place, all jack studds and beams in place, T-06 truss shows a bearing point other than the one giving,need tie-down detail,,,unable to find in plans, unable to find post under lam-beam as per plan, | |||
| FOUNDATION SURVEY APPROVED BY STORMWATER | 06/27/2005 | APPROVED | MBRENNAN |
| LINTEL | 06/24/2005 | APPROVED | JMCGOWEN |
| MONOLITHIC SLAB INSPECTION/SLAB | 06/06/2005 | APPROVED | JMCGOWEN |
| FIRST ROUGH PLUMBING INSPECTION | 06/01/2005 | APPROVED | JMCGOWEN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/09/2005 | 05/11/2005 |
| Note: Released By: CCOTE Held By: CCOTE Placed on Hold by Carl Cote, 5/11/05, fax & email sent. Awaiting submission of structural items per fax. 5/2705_Items recieved. 5/31/05_Approved for Release per plan cover sheet. | |||
| ENG1 | COMPLETE | 05/05/2005 | 05/13/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 05/05/2005 | 05/09/2005 |
| Note: Released By: HHERKERT Held By: HHERKERT Held By: HHERKERT need tree location on tree survey rec'd 5-9-05 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/21/2005 |
| ADMIN FEE | ¤20.00 | 05/31/2005 |
| ELECTRIC FEE | ¤121.20 | 05/31/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 05/31/2005 |
| MECHANICAL FEE | ¤121.20 | 05/31/2005 |
| PERMIT FEE | ¤592.80 | 05/31/2005 |
| PLAN CHECK FEE | ¤60.80 | 05/31/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,036.00 |