| Type |
Request Date |
Result |
Inspector |
|
FINAL COMPLETE BUILDING INSPECTION |
01/10/2006 |
FINAL APPROVED |
JGIBSON |
|
Note: THIS IS A REINSPECTION
|
|
FINAL COMPLETE BUILDING INSPECTION |
01/09/2006 |
Disapproved -FEE REQUIRED |
JGIBSON |
|
Note: Door locked C/O need to be cut down in concrete
|
|
FINAL COMPLETE BUILDING INSPECTION |
01/06/2006 |
Disapproved -FEE REQUIRED |
TOUTLAND |
|
Note: 1. energy sheets
2. flashing for vent stack
3. Smoke dectors don't work
4. access to see insulation sticker in attic
5. final termite treatment plan sticker
|
|
ENGINEERING FINAL |
01/05/2006 |
APPROVED |
FTORO |
|
UTILITY COMPANY FINAL |
12/30/2005 |
APPROVED |
RANDRADE |
|
DRIVEWAY |
12/28/2005 |
APPROVED |
BFCHAMBERLAIN |
|
Note: this already passed on the 14th
|
|
PRE DRIVEWAY |
12/14/2005 |
APPROVED |
BFCHAMBERLAIN |
|
FIREWALL INSPECTION 2ND ROUGH |
10/17/2005 |
APPROVED |
TOUTLAND |
|
INSULATION INSPECTION |
10/17/2005 |
APPROVED |
JGIBSON |
|
ALL ROUGH |
10/11/2005 |
APPROVED |
JHINDMAN |
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/30/2005 |
APPROVED |
TOUTLAND |
|
Note: THIS IS A REINSPECTION
|
|
FIREWALL FRAMING (DUPLEX) |
09/30/2005 |
APPROVED |
TOUTLAND |
|
Note: THIS IS A REINSPECTION
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/23/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: THIS IS A REINSPECTION ....2ND FLOOR X-BRACING AT GABLES NOT COMPLETED
|
|
FIREWALL FRAMING (DUPLEX) |
09/23/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: 1. page A.05 DETAIL TSI SEPARATION WALL TOMBE BUILT ACCORDING TO PLAN 2. BOTH BUILDINGS X-BRACING NOT COMPLETE AT FRONT 2ND FLOOR GABLES
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/21/2005 |
CANCELLED BY APPLICANT |
LMUSGROVE |
|
Note: THIS IS A REINSPECTION
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/12/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: 1. UNIT A. TRUSSES AT GARAGE MISSING STRAPS 2. SUPER STRAP OUTSIDE ENTRY DOOR UNIT A/ GARAGE NOT NAILED 3. STRAPPING DETAIL PAGE A.05 1 PIECE 36" UP/OVER/DOWN 4. BOLTS/SHEAR/ CENTER WALL AT STAIR LANDING/ NOT ENOUGH THREADS AT NUTS TOO SHORT / ALSO MISSING NUTS 5. 2ND FLOOR GABLE X-BRACING NOT COMPLETED 6. 3-PLY 2ND FLOOR 2X2'S NEEDED UNDERNEATH CHECK UPLIFT (UNIT A) 7. NAIL PATTERN T-BACKS 2ND FLOOR TRUSSES 8. 3-PLY T-04 (UNIT B) NOT TIGHT 9. ALL BENT-OVER/SMASHED/TWISTED OR OTHERWISE CAUSING DAMAGE TO ANY STRAPPING WILL FAIL 10. CHECK ALL STRAPPING AGAIN AND ALL BOLT ANCHORAGE
|
|
POURED CELL |
08/05/2005 |
CANCELLED BY INSPECTOR |
MMORATTO |
|
Note: poured cell insp. is done during roof sheating
|
|
LINTEL |
07/15/2005 |
APPROVED |
MMOORE |
|
MONOLITHIC SLAB INSPECTION/SLAB |
06/28/2005 |
APPROVED |
JGIBSON |
|
Note: THIS IS A REINSPECTION
|
|
MONOLITHIC SLAB INSPECTION/SLAB |
06/27/2005 |
Disapproved -FEE REQUIRED |
MMOORE |
|
Note: NO APPROVED/STAMPED PLANS IN BOX
|
|
MONOLITHIC SLAB INSPECTION/SLAB |
06/24/2005 |
CANCELLED BY APPLICANT |
|
|
FIRST ROUGH PLUMBING INSPECTION |
06/20/2005 |
APPROVED |
JGIBSON |