I want to search for...
Permit #2005050344
Permit Details
Status: COED
| CONDITIONED SPACE: 3859 sqft |
| GARAGE: 598 sqft |
| OPENED PORCH (WITH ROOF) : 561 sqft |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: (386) 445-4408 |
| Location Address: 45 WATERVIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/01/2005 |
| NOC: RECORDED |
| Applicant name: Red Carpet Construction Inc. (Residential Contract |
| Owner: NANCY M WHITLEY |
|
Address 20 CLAYMONT CT SOUTH PALM COAST, FL 32137 |
| Lot: 73 |
| Contracted Stated Job Value: ¤420,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RED CARPET CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
8A Market Place Court Palm Coast, FL 32137 |
CRC017457 (Exp: 08/31/2026) | (386) 445-4408 | (386)446-2232 |
Sub Contractors
GARY S WELBORN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1709 North Nova Road Holly Hill, FL 32117 |
CFC037140 (Exp: 08/31/2018) | (386) 257-1172 | (386)252-5979 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 12/15/2006 | FINAL APPROVED | JGIBSON |
| Note: 6/15/05 (BB) PRIOR TO CO, THERE SHALL BE FOUR INDEX TREES PLANTED, TWO OF WHICH MUST BE SHADE TREE. NO EXISTING TREES CAN BE SAVED DUE TO CONDITION OF TREES AND FILL REQUIRED. | |||
| STORMWATER FINAL INSPECTION | 12/14/2006 | APPROVED | DRANDALL |
| Note: THIS IS A REINSPECTION | |||
| UTILITY COMPANY FINAL | 12/07/2006 | APPROVED | TSCHWEERS |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 12/06/2006 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: remove pine bark mulch from across street vacant property.....remove concrete chunks from curb at driveway.....remove trash from property, around house | |||
| UTILITY COMPANY FINAL | 12/04/2006 | Disapproved - NO FEE | TSCHWEERS |
| Note: FAILED, GRAVITY CANT OPEN SEWER CLEAN OUT LID IS GLUED ON | |||
| RESIDENTIAL EARLY POWER | 10/20/2006 | APPROVED | JGIBSON |
| INSULATION INSPECTION | 04/13/2006 | APPROVED | JMCGOWEN |
| ALL ROUGH | 04/04/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 03/23/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: NEED TO REMOVE BOND LINK IN BOTH PANELS NEED TO RUN S.E. CABLE TO SECOND PANEL FIRESTOP MISSING KITCHEN HALLWAY BOTH SIDES OF ARCH CHASES. SERVICE OUTLET MISSING COUNTER WALL IN KITCHEN,SERVICE OUTLET MISSING LIVING RM. COUNTER. BACKWALL INCOMPLETE OUTLETS.FIRESTOP MISSING IN MANY AREAS. NEED TO BOND ALL METAL PIPES ON SPA TUB TO PUMP MOTOR. UNUSED PLUMBING IN MASTER BTH MUST BE HARD CAPPED | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/16/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/26/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: not ready, 4 step box hip trusses tnstalled backwards | |||
| LINTEL | 10/21/2005 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| LINTEL | 10/12/2005 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: need detail on cantlevered cast-crete headers | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 08/26/2005 | APPROVED | MMORATTO |
| FIRST ROUGH PLUMBING INSPECTION | 08/23/2005 | APPROVED | JMCGOWEN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/08/2006 | 02/08/2006 |
| Note: Released By: LWOODROME Revision: Connectors for load path @ girder truss | |||
| BLD | COMPLETE | 02/06/2006 | 02/07/2006 |
| Note: Released By: LWOODROME Revision: Truss repair | |||
| BLD | COMPLETE | 12/30/2005 | 12/30/2005 |
| Note: Released By: CCOTE Approved for Release. Revision: New truss connectors (Sheet A10) | |||
| BLD | COMPLETE | 12/07/2005 | 12/08/2005 |
| Note: Released By: LWOODROME Revision: Add wet bar | |||
| BLD | COMPLETE | 11/21/2005 | 11/22/2005 |
| Note: Released By: LWOODROME Revision: Truss connectors | |||
| BLD | COMPLETE | 10/19/2005 | 10/20/2005 |
| Note: Released By: LWOODROME Revision: Mitered glass detail | |||
| URB | COMPLETE | 06/15/2005 | 06/15/2005 |
| Note: Released By: CGOEWEY on: 6/15/2005 | |||
| BLD | COMPLETE | 05/16/2005 | 05/16/2005 |
| Note: Released By: CCOTE Held By: CCOTE 5/16/05_Held for Structural Items, fax sent. 5/27/05_Items recieved. 5/31/05_Approved for Release per plan cover sheet. | |||
| ENG1 | COMPLETE | 05/10/2005 | 05/31/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 05/10/2005 | 05/16/2005 |
| Note: Released By: DCHAUDOIN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/15/2006 |
| REINSPECTION FEE | ¤40.00 | 12/15/2006 |
| REINSPECTION FEE | ¤40.00 | 12/15/2006 |
| RENEW PERMIT FEES | ¤40.00 | 12/15/2006 |
| REVISION | ¤40.00 | 12/15/2006 |
| REVISION | ¤40.00 | 12/15/2006 |
| REVISION | ¤40.00 | 12/15/2006 |
| REVISION | ¤40.00 | 12/15/2006 |
| REVISION | ¤40.00 | 12/15/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 12/15/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 12/15/2006 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 06/01/2005 |
| ADMIN FEE | ¤20.00 | 06/01/2005 |
| ELECTRIC FEE | ¤282.00 | 06/01/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 06/01/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 06/01/2005 |
| MECHANICAL FEE | ¤282.00 | 06/01/2005 |
| PERMIT FEE | ¤1,638.00 | 06/01/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 06/01/2005 |
| PLAN CHECK FEE | ¤168.00 | 06/01/2005 |
| PLUMBING FEE | ¤282.00 | 06/01/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 06/01/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,966.38 |