Permit #2005050385
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01510-0050 |
| CONDITIONED SPACE: 2057 sqft |
| GARAGE: 426 sqft |
| OPENED PORCH (WITH ROOF) : 208 sqft |
| Total Square Footage: 2691 sqft |
| Block: 0151 |
| Subdivision: - |
| Job Phone: (386) 672-8285 |
| Location Address: 54 EBB TIDE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/15/2005 |
| NOC: RECORDED |
| Applicant name: Vanacore Construction Inc. (Residential Contractor |
| Owner: ANTONIO AND MARIE MEDEIROS |
|
Address 110 DIVISION STREET NEW BEDFORD, MA 02744 |
| Lot: 050 |
| Contracted Stated Job Value: ¤145,000.00 |
| Job Description: RESIDENTIAL SINGLE FAMILY |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 03/14/2006 | FINAL APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 03/13/2006 | Disapproved -FEE REQUIRED | PGALLMANN |
| Note: 1) No pest sticker. 2) 2 blank plates missing, to cover romex cable, in the laundy room and master bedroom. 3) No visible GFCI device protecting the whirlpool (check panel...GFCI breaker may have been installed subsequent to inspection). | |||
| UTILITY COMPANY FINAL | 03/02/2006 | APPROVED | RANDRADE |
| ENGINEERING FINAL | 03/01/2006 | APPROVED - AS NOTED | DSCHRAGER |
| Note: - 10 sqft of road damage...$180 | |||
| RESIDENTIAL EARLY POWER | 02/10/2006 | APPROVED | JGIBSON |
| DRIVEWAY | 02/07/2006 | APPROVED | FTORO |
| INSULATION INSPECTION | 12/08/2005 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 12/06/2005 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Knee wall not insulated in rear, fire block in master bedroom & water closet room. | |||
| ALL ROUGH | 12/02/2005 | APPROVED | JGIBSON |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/16/2005 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/14/2005 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Previous corrections not made. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/04/2005 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Previous correction not completed | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/01/2005 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Interior frame wall not attached to CMU per plan @ left of entry,many missaligned straps low bond beam, valley strap missing,hip jack strap missing @ front entry. | |||
| LINTEL | 10/11/2005 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB INSPECTION/SLAB | 09/16/2005 | APPROVED | JGIBSON |
| FIRST ROUGH PLUMBING INSPECTION | 09/15/2005 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 07/11/2005 | 07/11/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R. | |||
| BLD | COMPLETE | 05/13/2005 | 06/07/2005 |
| Note: Released By: IVAZQUEZ Held By: FREODICA 5-16-05 Hold for lintel schedule-see fred for file folder | |||
| ENG1 | COMPLETE | 05/10/2005 | 05/20/2005 |
| Note: Released By: EBLACKER | |||
| ZON | COMPLETE | 05/10/2005 | 05/13/2005 |
| Note: Released By: DCHAUDOIN |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤180.00 | 03/15/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 03/15/2006 |
| REINSPECTION FEE | ¤40.00 | 03/15/2006 |
| REINSPECTION FEE | ¤40.00 | 03/15/2006 |
| REINSPECTION FEE | ¤40.00 | 03/15/2006 |
| REINSPECTION FEE | ¤40.00 | 03/15/2006 |
| REINSPECTION FEE | ¤40.00 | 03/15/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 07/15/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 07/15/2005 |
| ADMIN FEE | ¤20.00 | 07/15/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 07/15/2005 |
| BUILDING CODE ADMIN FUND | ¤13.46 | 07/15/2005 |
| ELECTRIC FEE | ¤126.00 | 07/15/2005 |
| ENGINEERING PERMIT FEES | ¤80.00 | 07/15/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 07/15/2005 |
| MECHANICAL FEE | ¤126.00 | 07/15/2005 |
| PERMIT FEE | ¤624.00 | 07/15/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 07/15/2005 |
| PLAN CHECK FEE | ¤64.00 | 07/15/2005 |
| PLUMBING FEE | ¤126.00 | 07/15/2005 |
| RADON FEE | ¤13.46 | 07/15/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,517.30 |