I want to search for...

Permit #2005051005

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-01120-0020
CONDITIONED SPACE: 2848 sqft
GARAGE: 539 sqft
OPENED PORCH (WITH ROOF) : 216 sqft
OPENED PORCH (WITH ROOF) : 107 sqft
OPENED PORCH (WITH ROOF) : 67 sqft
Total Square Footage: 3777 sqft
Block: 0112
Subdivision: -
Job Phone: (386)447-5225
Location Address: 17 LEWIS DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/21/2005
NOC: RECORDED
Applicant name: MOJI BABAZADEH
Owner: INTERVEST CONSTRUCTION INC
Lot: 020
Job Description: RESIDENTIAL SINGLE FAMILY HOME
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC.
Status Location Address State License Number Phone Fax
CANCEL

2379 BEVILLE ROAD

Daytona Beach, FL 32119

CBC044682 (Exp: 08/31/2018) (386)236-4133 (386)763-7833

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 03/07/2006 FINAL APPROVED JLEVRAULT
ENGINEERING FINAL 02/08/2006 APPROVED BFCHAMBERLAIN
Note: 61 s.f. road damage.....bonded builder
UTILITY COMPANY FINAL 02/08/2006 APPROVED RANDRADE
RESIDENTIAL EARLY POWER 02/03/2006 APPROVED MMOORE
PRE DRIVEWAY 12/29/2005 APPROVED FTORO
Note: THIS IS A REINSPECTION
PRE DRIVEWAY 12/28/2005 Disapproved -FEE REQUIRED FTORO
Note: not formed
PRE DRIVEWAY 12/27/2005 CANCELLED BY APPLICANT LAPTEKAR
INSULATION INSPECTION 11/16/2005 APPROVED MMOORE
ALL ROUGH 11/14/2005 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
ALL ROUGH 11/10/2005 Disapproved -FEE REQUIRED JLEVRAULT
Note: THIS IS A REINSPECTION Top stairs still not correct.
ALL ROUGH 11/02/2005 Disapproved -FEE REQUIRED JLEVRAULT
Note: THIS IS A REINSPECTION Top short stairs do not meet code. Two middle steps have an 8 1/2" rise. Maximum is 7 3/4".
ALL ROUGH 10/27/2005 Disapproved -FEE REQUIRED JLEVRAULT
Note: Correct all stairs. Not to plans or code.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/13/2005 APPROVED ARAYMOND
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/12/2005 Disapproved -FEE REQUIRED ARITTER
Note: THIS IS A REINSPECTION STRAP PORCH CORNER ROOF AT RIGHT REAR- TOP- THIRD NOTICE 1ST NOTICE - 10-07-05 2ND- 10-11-05 3RD- 10-12-05
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/11/2005 Disapproved -FEE REQUIRED MMOORE
Note: porch corner needs to be strapped to blocking as requested at last non-compliance
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 10/07/2005 Disapproved -FEE REQUIRED MMOORE
Note: 1. jack #'s J201 & J200 need to be strapped to shear wall 2. exterior coil strapping at rear wall at exterior of building only nailed through osb in places and not through blocking if required 3. fireplace rafters need straps 4. porch block corner at upper framing needs strapping or visible means of anchorage for inspection
LINTEL 09/14/2005 APPROVED MMOORE
MONOLITHIC SLAB INSPECTION/SLAB 08/26/2005 APPROVED MMOORE
FIRST ROUGH PLUMBING INSPECTION 08/24/2005 APPROVED ARAYMOND

Review History

Department Status Date In Date Out
ZON COMPLETE 06/21/2005 06/21/2005
Note: Released By: HHERKERT on: 6/21/2005 Released By: HHERKERT on: 6/21/2005 COLOR REVISION
BLD COMPLETE 06/06/2005 06/21/2005
Note: Released By: CCOTE on: 6/21/2005 Approved for Release per plan cover sheet. Review by Fred R.
ENG1 COMPLETE 05/27/2005 06/07/2005
Note: Released By: WKINELL
ZON COMPLETE 05/27/2005 06/06/2005
Note: Released By: HHERKERT need landscape plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
STORMWATER REINSPECTION FEE ¤35.00 11/17/2006
STORMWATER REINSPECTION FEE ¤35.00 03/09/2006
EARLY POWER INSPECTION ¤40.00 03/09/2006
REINSPECTION FEE ¤40.00 03/09/2006
REINSPECTION FEE ¤40.00 03/09/2006
REINSPECTION FEE ¤40.00 03/09/2006
REINSPECTION FEE ¤40.00 03/09/2006
REINSPECTION FEE ¤40.00 03/09/2006
REINSPECTION FEE ¤40.00 03/09/2006
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 06/21/2005
ADMIN FEE ¤20.00 06/21/2005
ARC HOUSE REVIEW ¤125.00 06/21/2005
BUILDING CODE ADMIN FUND ¤18.89 06/21/2005
ELECTRIC FEE ¤162.60 06/21/2005
ENGINEERING PERMIT FEES ¤80.00 06/21/2005
FIRE RES IMPACT FEE 4-1-05 ¤173.47 06/21/2005
MECHANICAL FEE ¤162.60 06/21/2005
PERMIT FEE ¤861.90 06/21/2005
PARKS IMPACT FEE 11-2-04 ¤1,120.91 06/21/2005
PLAN CHECK FEE ¤88.40 06/21/2005
PLUMBING FEE ¤162.60 06/21/2005
RADON FEE ¤18.89 06/21/2005
TRANSPORTATION IMPACT FEE3/RES ¤2,885.00 06/21/2005
Fees Total Due: ¤0.00 Total Paid: ¤9,830.26