| Parcel Id: 07-11-31-7026-00480-0140 |
| CONDITIONED SPACE: 2675 sqft |
| GARAGE: 440 sqft |
| OPENED PORCH (WITH ROOF) : 112 sqft |
| Total Square Footage: 3227 sqft |
| Block: 0048 |
| Subdivision: - |
| Job Phone: (904)596-6703 |
| Location Address: 27 PIERMOUNT LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/13/2005 |
| NOC: RECORDED |
| Applicant name: K.B Homes of Jacksonville Inc. (Building Contracto |
| Owner: KB HOME ORLANDO LLC |
| Lot: 140 |
| Contracted Stated Job Value: ¤176,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
| Type |
Request Date |
Result |
Inspector |
|
FINAL COMPLETE BUILDING INSPECTION |
02/10/2006 |
FINAL APPROVED |
TOUTLAND |
|
ENGINEERING FINAL |
02/08/2006 |
APPROVED |
FTORO |
|
Note: THIS IS A REINSPECTION
45 s.f. road damages $460
|
|
ENGINEERING FINAL |
02/06/2006 |
Disapproved -FEE REQUIRED |
FTORO |
|
Note: 45 s.f. road damages
clean up street of all loose sand
pick up trash etc...
|
|
UTILITY COMPANY FINAL |
02/01/2006 |
APPROVED |
RANDRADE |
|
RESIDENTIAL EARLY POWER |
01/09/2006 |
APPROVED |
JHINDMAN |
|
DRIVEWAY |
01/06/2006 |
APPROVED |
FTORO |
|
INSULATION INSPECTION |
11/17/2005 |
APPROVED |
JLEVRAULT |
|
ALL ROUGH |
11/14/2005 |
APPROVED |
ARITTER |
|
Note: THIS IS A REINSPECTION
|
|
ALL ROUGH |
11/09/2005 |
Disapproved -FEE REQUIRED |
ARITTER |
|
Note: THIS IS A REINSPECTION
1. PROVIDE ENGINEERS SPECIFICATIONS FOR NAILING OR BOLTING TOGETHER; 4 PLY BEAM 1.
2. WATER LEAKING FROM TRAP UNDER TUB IN BATH 2.
|
|
ALL ROUGH |
10/21/2005 |
CANCELLED BY APPLICANT |
ECOYNE |
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/28/2005 |
CANCELLED BY INSPECTOR |
MMOORE |
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/27/2005 |
APPROVED |
JLEVRAULT |
|
LINTEL |
08/31/2005 |
APPROVED |
JGIBSON |
|
MONOLITHIC SLAB INSPECTION/SLAB |
08/19/2005 |
APPROVED |
MMORATTO |
|
Note: THIS IS A REINSPECTION
|
|
MONOLITHIC SLAB INSPECTION/SLAB |
08/16/2005 |
CANCELLED BY APPLICANT |
MMORATTO |
|
Note: THIS IS A REINSPECTION
|
|
MONOLITHIC SLAB INSPECTION/SLAB |
08/15/2005 |
CANCELLED BY APPLICANT |
LMUSGROVE |
|
FIRST ROUGH PLUMBING INSPECTION |
08/12/2005 |
APPROVED |
JGIBSON |
|
FIRST ROUGH PLUMBING INSPECTION |
08/11/2005 |
Disapproved -FEE REQUIRED |
JGIBSON |
|
Note: No head pressure on sanitary.
|