I want to search for...
Permit #2005070226
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00730-0030 |
| CONDITIONED SPACE: 2484 sqft |
| GARAGE: 510 sqft |
| OPENED PORCH (WITH ROOF) : 258 sqft |
| OPENED PORCH (WITH ROOF) : 44 sqft |
| Total Square Footage: 3296 sqft |
| Block: 0073 |
| Subdivision: - |
| Job Phone: (386)447-8680 |
| Location Address: 12 ULLYNN PL |
| Type: DU - DUPLEX |
| Issue Date: 10/12/2005 |
| NOC: RECORDED |
| Applicant name: MICHAEL LEO BRANIFF |
| Owner: TROUVILLE FRANK J & |
|
Address JANE B TROUVILLE DRACUT, MA 01826 |
| Lot: 030 |
| Contracted Stated Job Value: ¤164,800.00 |
| Job Description: SINGLE FAMILY RESIDENCE (DUPLEX) |
| Type: AS |
Contractor
RIVER CITY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
12058 SAN JOSE BLVD #804 Jacksonville, FL 32223 |
CGC062728 (Exp: 08/31/2012) | 904-260-9009 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 06/09/2006 | FINAL APPROVED | DROCKWELL |
| ENGINEERING FINAL | 06/08/2006 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION 06 / 8 / 06 100 'road damage = 900.00 | |||
| ENGINEERING FINAL | 06/07/2006 | CANCELLED BY APPLICANT | KJOHNSON |
| Note: contractor cancelled. | |||
| UTILITY COMPANY FINAL | 06/06/2006 | APPROVED | MBACON |
| Note: per the contractor - LMusgrove | |||
| STORMWATER FINAL INSPECTION | 06/01/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: HIGH SPOT RIGHT BACK , AT # 1475 / # 1490 # 1463 WATER NEEDS TO COME TO FRONT NOT ON TO OTHER PROPERTY, REMOVE DUMPSTER THEN SOD , PICK UP TRASH LEFT ,, GREEN PIPE , AND ALL OTHER. ROAD DAMAGE = 900.00 | |||
| DRIVEWAY | 05/10/2006 | APPROVED | GLALIMA |
| PRE DRIVEWAY | 05/08/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: TO MUCH PITCH / HIGH ON LEFT . SLOPE IS OFF , CAR WILL BOTTOM OUT | |||
| INSULATION INSPECTION | 03/21/2006 | APPROVED | JHINDMAN |
| ALL ROUGH | 03/16/2006 | CANCELLED BY APPLICANT | JHINDMAN |
| ALL ROUGH | 03/10/2006 | APPROVED - AS NOTED | DROCKWELL |
| Note: strap headers/shower stems/install window | |||
| FIREWALL FRAMING (DUPLEX) | 01/19/2006 | APPROVED | DROCKWELL |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/10/2006 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Threaded rods not complete | |||
| LINTEL | 12/13/2005 | APPROVED | DROCKWELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/15/2005 | APPROVED | DROCKWELL |
| FIRST ROUGH PLUMBING INSPECTION | 11/10/2005 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/14/2005 | 09/14/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred >R | |||
| DSD | COMPLETE | 09/09/2005 | 09/09/2005 |
| Note: Released By: JCALVERT PLEASE VERIFY ADDRESS | |||
| ZON | COMPLETE | 07/22/2005 | 09/06/2005 |
| Note: Released By: DCHAUDOIN | |||
| SWMD | COMPLETE | 07/25/2005 | |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 07/22/2005 | |
| Note: Held By: DCHAUDOIN HOLD / RIVER CITY NEED TO CORRECT FILE TO SHOW CORRECT ADDRESS ENTIRE FILE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤900.00 | 06/09/2006 |
| REINSPECTION FEE | ¤40.00 | 06/09/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/09/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 06/09/2006 |
| TRANSPORTATION IMPACT FEE3/RES | ¤5,770.00 | 10/12/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤7,200.00 | 10/12/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/12/2005 |
| ADMIN FEE | ¤20.00 | 10/12/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 10/12/2005 |
| BUILDING CODE ADMIN FUND | ¤16.48 | 10/12/2005 |
| ELECTRIC FEE | ¤146.40 | 10/12/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤346.94 | 10/12/2005 |
| MECHANICAL FEE | ¤146.40 | 10/12/2005 |
| PERMIT FEE | ¤756.60 | 10/12/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤2,241.82 | 10/12/2005 |
| PLAN CHECK FEE | ¤77.60 | 10/12/2005 |
| PLUMBING FEE | ¤146.40 | 10/12/2005 |
| RADON FEE | ¤16.48 | 10/12/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,100.12 |