I want to search for...
Permit #2005080273
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01430-0180 |
| CONDITIONED SPACE: 2830 sqft |
| GARAGE: 729 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 51 sqft |
| PATIO/DECK (NO ROOF) : 170 sqft |
| Total Square Footage: 3880 sqft |
| Block: 0143 |
| Subdivision: - |
| Job Phone: (386)274-7190 |
| Location Address: 32 LEE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/22/2005 |
| NOC: RECORDED |
| Applicant name: JOHN DAVID MOLYNEAUX |
| Owner: KB HOMES JACKSONVILLE LLC |
|
Address 10475 FORTUNE PKWY STE 100 JACKSONVILLE, FL 32256 |
| Lot: 180 |
| Contracted Stated Job Value: ¤180,990.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
KB HOME ORLANDO, LLC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
9102 SOUTHPARK CENTER LOOP # 200 ORLANDO, FL 32819 |
CBC051212 (Exp: 08/31/2010) | (407)587-3531 | (407)587-2333 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 02/27/2006 | FINAL APPROVED | MMOORE |
| STORMWATER FINAL INSPECTION | 02/22/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: 13 s.f. road damage...$204 | |||
| UTILITY COMPANY FINAL | 02/22/2006 | APPROVED | RANDRADE |
| LATH /BRICK FLASHING | 02/08/2006 | APPROVED | JMCGOWEN |
| RESIDENTIAL EARLY POWER | 02/07/2006 | APPROVED | MMOORE |
| DRIVEWAY | 02/02/2006 | APPROVED | BFCHAMBERLAIN |
| INSULATION INSPECTION | 12/16/2005 | APPROVED - AS NOTED | MMOORE |
| Note: 1) Complete firestop under tub. 2) Firestop two 3/4" holes adjacent to shower pan. | |||
| ALL ROUGH | 12/08/2005 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION Check proper venting for second floor plumbing. Point of vent is 8 feet for 2". Look at toilet venting. | |||
| ALL ROUGH | 12/06/2005 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: Second floor shower and bath not vented. Wire nuts and pigtails for grounds miussing on some plastic boxes. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/08/2005 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION..RODS OK PER BFS ENGINEERING DETAIL ST-1 B-ST1 ON RIGHT SIDE OF DETAIL | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/07/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION..1. tie rods not per plan at 2nd plan and at 4-ply at garage/ need clarification of count of tie rods at 4-ply | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/02/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION..1. 4-ply t-100 not bolted 2. check truss connector schedule at 2nd floor | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 11/01/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. 4-ply bolt pattern in question/ one row on bottom and one on top or just one on the bottom? 2. inspection not finished due to work not completed | |||
| LINTEL | 10/11/2005 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 09/28/2005 | APPROVED | ARITTER |
| FIRST ROUGH PLUMBING INSPECTION | 09/23/2005 | APPROVED | ARAYMOND |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/09/2005 | 08/18/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R> | |||
| SWMD | COMPLETE | 08/08/2005 | 08/22/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 08/08/2005 | 08/09/2005 |
| Note: Released By: HHERKERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤204.00 | 02/27/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 02/27/2006 |
| REINSPECTION FEE | ¤40.00 | 02/27/2006 |
| REINSPECTION FEE | ¤40.00 | 02/27/2006 |
| REINSPECTION FEE | ¤40.00 | 02/27/2006 |
| REINSPECTION FEE | ¤40.00 | 02/27/2006 |
| REINSPECTION FEE | ¤40.00 | 02/27/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 08/22/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/22/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 08/22/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 08/22/2005 |
| MECHANICAL FEE | ¤165.60 | 08/22/2005 |
| PERMIT FEE | ¤881.40 | 08/22/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 08/22/2005 |
| PLAN CHECK FEE | ¤90.40 | 08/22/2005 |
| PLUMBING FEE | ¤165.60 | 08/22/2005 |
| RADON FEE | ¤19.40 | 08/22/2005 |
| ADMIN FEE | ¤20.00 | 08/22/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 08/22/2005 |
| BUILDING CODE ADMIN FUND | ¤19.40 | 08/22/2005 |
| ELECTRIC FEE | ¤165.60 | 08/22/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,955.78 |