I want to search for...

Permit #2005080273

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-01430-0180
CONDITIONED SPACE: 2830 sqft
GARAGE: 729 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
OPENED PORCH (WITH ROOF) : 51 sqft
PATIO/DECK (NO ROOF) : 170 sqft
Total Square Footage: 3880 sqft
Block: 0143
Subdivision: -
Job Phone: (386)274-7190
Location Address: 32 LEE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/22/2005
NOC: RECORDED
Applicant name: JOHN DAVID MOLYNEAUX
Owner: KB HOMES JACKSONVILLE LLC

Address

10475 FORTUNE PKWY STE 100

JACKSONVILLE, FL 32256

Lot: 180
Contracted Stated Job Value: ¤180,990.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

KB HOME ORLANDO, LLC.
Status Location Address State License Number Phone Fax
CANCEL

9102 SOUTHPARK CENTER LOOP # 200

ORLANDO, FL 32819

CBC051212 (Exp: 08/31/2010) (407)587-3531 (407)587-2333

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 02/27/2006 FINAL APPROVED MMOORE
STORMWATER FINAL INSPECTION 02/22/2006 APPROVED - AS NOTED BFCHAMBERLAIN
Note: 13 s.f. road damage...$204
UTILITY COMPANY FINAL 02/22/2006 APPROVED RANDRADE
LATH /BRICK FLASHING 02/08/2006 APPROVED JMCGOWEN
RESIDENTIAL EARLY POWER 02/07/2006 APPROVED MMOORE
DRIVEWAY 02/02/2006 APPROVED BFCHAMBERLAIN
INSULATION INSPECTION 12/16/2005 APPROVED - AS NOTED MMOORE
Note: 1) Complete firestop under tub. 2) Firestop two 3/4" holes adjacent to shower pan.
ALL ROUGH 12/08/2005 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION Check proper venting for second floor plumbing. Point of vent is 8 feet for 2". Look at toilet venting.
ALL ROUGH 12/06/2005 Disapproved -FEE REQUIRED JLEVRAULT
Note: Second floor shower and bath not vented. Wire nuts and pigtails for grounds miussing on some plastic boxes.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/08/2005 APPROVED MMOORE
Note: THIS IS A REINSPECTION..RODS OK PER BFS ENGINEERING DETAIL ST-1 B-ST1 ON RIGHT SIDE OF DETAIL
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/07/2005 Disapproved -FEE REQUIRED MMOORE
Note: THIS IS A REINSPECTION..1. tie rods not per plan at 2nd plan and at 4-ply at garage/ need clarification of count of tie rods at 4-ply
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/02/2005 Disapproved -FEE REQUIRED MMOORE
Note: THIS IS A REINSPECTION..1. 4-ply t-100 not bolted 2. check truss connector schedule at 2nd floor
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 11/01/2005 Disapproved -FEE REQUIRED MMOORE
Note: 1. 4-ply bolt pattern in question/ one row on bottom and one on top or just one on the bottom? 2. inspection not finished due to work not completed
LINTEL 10/11/2005 APPROVED MMOORE
MONOLITHIC SLAB INSPECTION/SLAB 09/28/2005 APPROVED ARITTER
FIRST ROUGH PLUMBING INSPECTION 09/23/2005 APPROVED ARAYMOND

Review History

Department Status Date In Date Out
BLD COMPLETE 08/09/2005 08/18/2005
Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R>
SWMD COMPLETE 08/08/2005 08/22/2005
Note: Released By: LAPTEKAR
ZON COMPLETE 08/08/2005 08/09/2005
Note: Released By: HHERKERT

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ENGINEERING ROAD DAMAGE ¤204.00 02/27/2006
EARLY POWER INSPECTION ¤40.00 02/27/2006
REINSPECTION FEE ¤40.00 02/27/2006
REINSPECTION FEE ¤40.00 02/27/2006
REINSPECTION FEE ¤40.00 02/27/2006
REINSPECTION FEE ¤40.00 02/27/2006
REINSPECTION FEE ¤40.00 02/27/2006
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 08/22/2005
STORM WATER PERMIT FEES ¤80.00 08/22/2005
TRANSPORTATION IMPACT FEE3/RES ¤2,885.00 08/22/2005
FIRE RES IMPACT FEE 4-1-05 ¤173.47 08/22/2005
MECHANICAL FEE ¤165.60 08/22/2005
PERMIT FEE ¤881.40 08/22/2005
PARKS IMPACT FEE 11-2-04 ¤1,120.91 08/22/2005
PLAN CHECK FEE ¤90.40 08/22/2005
PLUMBING FEE ¤165.60 08/22/2005
RADON FEE ¤19.40 08/22/2005
ADMIN FEE ¤20.00 08/22/2005
ARC HOUSE REVIEW ¤125.00 08/22/2005
BUILDING CODE ADMIN FUND ¤19.40 08/22/2005
ELECTRIC FEE ¤165.60 08/22/2005
Fees Total Due: ¤0.00 Total Paid: ¤9,955.78