I want to search for...
Permit #2005080328
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00320-0230 |
| CONDITIONED SPACE: 2675 sqft |
| GARAGE: 440 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| PATIO/DECK (NO ROOF) : 18 sqft |
| Total Square Footage: 3183 sqft |
| Block: 0032 |
| Subdivision: - |
| Job Phone: (386)274-7190 |
| Location Address: 14 RYDING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/25/2005 |
| NOC: RECORDED |
| Applicant name: JOHN DAVID MOLYNEAUX |
| Owner: KB HOMES |
|
Address 735 FENTRESS BLVD DAYTONA BEACH, FL 32114 |
| Lot: 230 |
| Contracted Stated Job Value: ¤175,990.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
KB HOME ORLANDO, LLC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
9102 SOUTHPARK CENTER LOOP # 200 ORLANDO, FL 32819 |
CBC051212 (Exp: 08/31/2010) | (407)587-3531 | (407)587-2333 |
Inspection History
| Type | Request Date | Result | Inspector |
| STORMWATER FINAL INSPECTION | 09/21/2006 | FINAL APPROVED | GLALIMA |
| Note: road repaired | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/16/2006 | APPROVED | ARITTER |
| FINAL COMPLETE BUILDING INSPECTION | 05/15/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: No energy calcs in box. No number on house. | |||
| STORMWATER FINAL INSPECTION | 05/15/2006 | APPROVED - AS NOTED | GLALIMA |
| Note: THIS IS A REINSPECTION 22 s.f. road damages $276 remove osb board | |||
| STORMWATER FINAL INSPECTION | 05/04/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: SEE LAST REPORT , PLACE SOD ALONG DRIVE WAYAND CULVERT ENDS .ROAD DAMAGE 22 FEET | |||
| STORMWATER FINAL INSPECTION | 05/01/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: 22' FT ROAD DAMAGE , PLACE SOD ALONG DRIVE WAY AND CULVERT ENDS . PICK UP TRASH / CONCRETE /2X4S AND ORTHER, LEFT SIDE | |||
| UTILITY COMPANY FINAL | 04/27/2006 | APPROVED | RANDRADE |
| DRIVEWAY | 04/17/2006 | APPROVED | GLALIMA |
| DRIVEWAY | 04/13/2006 | Disapproved -FEE REQUIRED | GLALIMA |
| Note: rebar missing | |||
| RESIDENTIAL EARLY POWER | 03/31/2006 | APPROVED | JHINDMAN |
| LATH /BRICK FLASHING | 03/03/2006 | APPROVED | TOUTLAND |
| INSULATION INSPECTION | 02/24/2006 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 02/20/2006 | Disapproved -FEE REQUIRED | PGALLMANN |
| Note: THIS IS A REINSPECTION... 1) Draft stopping missing at some plumbing, A/C, and electric penetrations. 2) R11 installed in garage cieling, in lieu of R19. | |||
| INSULATION INSPECTION | 02/10/2006 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: draftstop ac chases at 2nd floor | |||
| ALL ROUGH | 02/03/2006 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 01/25/2006 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: Plumbing not completed, letter of repair on bond beam in garage. | |||
| ALL ROUGH | 01/23/2006 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: A/C not secure in powder bath, plumbing not ready. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/29/2005 | APPROVED | TOUTLAND |
| LINTEL | 12/06/2005 | CANCELLED BY APPLICANT | JGIBSON |
| LINTEL | 12/05/2005 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB INSPECTION/SLAB | 10/18/2005 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: not ready | |||
| FIRST ROUGH PLUMBING INSPECTION | 10/14/2005 | APPROVED | JHINDMAN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/09/2006 | 02/15/2006 |
| Note: Released By: LWOODROME Revision: Lintel/bond beam fix | |||
| BLD | COMPLETE | 08/12/2005 | 08/22/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R. | |||
| SWMD | COMPLETE | 08/10/2005 | 08/24/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 08/10/2005 | 08/10/2005 |
| Note: Held By: HHERKERT hold for arc meeting 8-12-05 | |||
| ZON | COMPLETE | 08/10/2005 | 08/12/2005 |
| Note: Released By: HHERKERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 09/27/2006 |
| REINSPECTION FEE | ¤40.00 | 09/27/2006 |
| REINSPECTION FEE | ¤40.00 | 09/27/2006 |
| REINSPECTION FEE | ¤40.00 | 09/27/2006 |
| REINSPECTION FEE | ¤40.00 | 09/27/2006 |
| REINSPECTION FEE | ¤40.00 | 09/27/2006 |
| REINSPECTION FEE | ¤40.00 | 09/27/2006 |
| REVISION | ¤40.00 | 09/27/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 09/27/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 09/27/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 09/27/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 09/27/2006 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 08/25/2005 |
| ADMIN FEE | ¤20.00 | 08/25/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 08/25/2005 |
| BUILDING CODE ADMIN FUND | ¤15.92 | 08/25/2005 |
| ELECTRIC FEE | ¤150.00 | 08/25/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 08/25/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/25/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 08/25/2005 |
| MECHANICAL FEE | ¤150.00 | 08/25/2005 |
| PERMIT FEE | ¤780.00 | 08/25/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 08/25/2005 |
| PLAN CHECK FEE | ¤80.00 | 08/25/2005 |
| PLUMBING FEE | ¤150.00 | 08/25/2005 |
| RADON FEE | ¤15.92 | 08/25/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,806.22 |