Permit #2005080510
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00780-0110 |
| CONDITIONED SPACE: 1140 sqft |
| CONDITIONED SPACE: 1140 sqft |
| GARAGE: 306 sqft |
| GARAGE: 306 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| PATIO/DECK (NO ROOF) : 24 sqft |
| PATIO/DECK (NO ROOF) : 24 sqft |
| Total Square Footage: 3092 sqft |
| Block: 0078 |
| Subdivision: - |
| Job Phone: (386)437-3801 |
| Location Address: 17 ULLMAN CT |
| Type: DU - DUPLEX |
| Issue Date: 09/14/2005 |
| NOC: RECORDED |
| Applicant name: JOSEPH ALEIXO PORTAL |
| Owner: SWEETWATER CUSTOM HOMES,INC |
|
Address 1105 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
| Lot: 110 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: RESIDENTIAL DUPLEX |
| Type: CN |
Contractor
SWEETWATER CUSTOM HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1105 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
CBC1252965 (Exp: 08/31/2024) | 386-931-1725 | 386-439-4676 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 01/18/2007 | FINAL APPROVED | DROCKWELL |
| Note: No power to house at final | |||
| UTILITY COMPANY FINAL | 01/03/2007 | APPROVED | MBACON |
| STORMWATER FINAL INSPECTION | 01/02/2007 | APPROVED | GLALIMA |
| Note: 0 road damage | |||
| LATH /BRICK FLASHING | 08/09/2006 | APPROVED - AS NOTED | DROCKWELL |
| Note: Wrap firewall under soffit in front | |||
| DRIVEWAY | 07/20/2006 | APPROVED | GLALIMA |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL INSPECTION | 07/19/2006 | APPROVED | DROCKWELL |
| DRIVEWAY | 07/19/2006 | CANCELLED BY APPLICANT | LAPTEKAR |
| Note: cancel per Joe | |||
| DRIVEWAY | 07/17/2006 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: needs min. 5" of concrete above culvert pipe | |||
| INSULATION INSPECTION | 05/31/2006 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 05/26/2006 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Draftstop panel wiring | |||
| ALL ROUGH | 05/24/2006 | APPROVED | DROCKWELL |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/18/2006 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL FRAMING (DUPLEX) | 04/17/2006 | APPROVED | CMINI |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/17/2006 | CANCELLED BY APPLICANT | JG |
| LINTEL | 03/30/2006 | APPROVED | DROCKWELL |
| MONOLITHIC SLAB INSPECTION/SLAB | 03/03/2006 | APPROVED | DROCKWELL |
| FIRST ROUGH PLUMBING INSPECTION | 02/23/2006 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/06/2006 | 04/11/2006 |
| Note: Released By: CCOTE Approved for Release. Revision: Updated energy calcs. | |||
| BLD | COMPLETE | 09/09/2005 | 09/13/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| BLD | HOLD | 08/25/2005 | 08/29/2005 |
| Note: Held By: CCOTE The following items must be submitted in order to complete the Building Permit Application plan review. 1. Provide an interior bearing wall detail. Indicate framing type, size, spacing, connection to slab and truss, information for openings including header size, support, and connectors/fasteners/anchors to be used. 2. Provide a foundation detail for interior bearing walls. 3. Provide a foundation detail for a stepped footing; cmu interior bearing wall at garage, cmu exterior wall at garage, wood interior bearing wall at garage. 4. Provide information regarding downcells. Indicate overlap required, required locations, and maximum spacing allowed between downcells. 5. Indicate UL assembly to be used for fire separation wall. Provide all information on section including but not limited to orientation of gwb, screw type and spacing, etc. 6. Provide a lintel schedule. Identify the location of each lintel type to be used at each masonry opening. Indicate lintel type and if reinforcing is to be used list type and size. I have attached a sample copy of an acceptable lintel schedule. | |||
| ZON | COMPLETE | 08/17/2005 | 08/25/2005 |
| Note: Released By: HHERKERT | |||
| SWMD | COMPLETE | 08/15/2005 | 08/29/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 08/15/2005 | 08/17/2005 |
| Note: Held By: HHERKERT landscape key indicating plant types, sizes, and quantity is required need square foot tabulation to include the covered front entry |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/24/2007 |
| REVISION | ¤40.00 | 01/24/2007 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 01/24/2007 |
| TRANSPORTATION IMPACT FEE3/RES | ¤5,770.00 | 09/14/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤7,200.00 | 09/14/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/14/2005 |
| ADMIN FEE | ¤20.00 | 09/14/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 09/14/2005 |
| BUILDING CODE ADMIN FUND | ¤15.46 | 09/14/2005 |
| ELECTRIC FEE | ¤139.20 | 09/14/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤346.94 | 09/14/2005 |
| MECHANICAL FEE | ¤139.20 | 09/14/2005 |
| PERMIT FEE | ¤709.80 | 09/14/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤2,241.82 | 09/14/2005 |
| PLAN CHECK FEE | ¤72.80 | 09/14/2005 |
| PLUMBING FEE | ¤139.20 | 09/14/2005 |
| RADON FEE | ¤15.46 | 09/14/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,129.88 |