Permit #2005080602

Permit Details

Status: COED

CONDITIONED SPACE: 12193 sqft
GARAGE: 1888 sqft
OPENED PORCH (WITH ROOF) : 983 sqft
Total Square Footage: 15064 sqft
Subdivision: 2085 - Tidelands at the Village Phase II
Job Phone: (407)838-1486
Location Address: 15 RIVERVIEW BEND N
Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO
Issue Date: 10/05/2005
NOC: RECORDED
Applicant name: RALPH STEPHEN SMITH
Owner: CENTEX DESTINATION PROPERTIES

Address

1064 GREENWOOD BLVD

LAKE MARY, FL 32746

Address

SUITE200

LAKE MARY, FL 32746

Contracted Stated Job Value: ¤1,100,000.00
Job Description: BUILDING #2 8- PLEX TOWNHOMES
Type: CN

Contractor

CENTEX DESTINATION PROPERTIES
Status Location Address Mailing Address State License Number Phone
CANCEL

1064 GREENWOOD BLVD

LAKE MARY, FL 33746

SUITE 200

LAKE MARY, FL 32746

CGC1506882 (Exp: 09/30/2008) (407)838-1486

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 05/10/2006 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
FINAL COMPLETE BUILDING INSPECTION 05/09/2006 Disapproved -FEE REQUIRED JMCGOWEN
Note: need connectors on all disconnects, mark all hot conductors, arc shields missing, breakers for ahu are tosmall, light in closet needs to be moved, arc-flash warnings signs needed on outside service panels
UTILITY COMMERCIAL FINAL 05/09/2006 APPROVED RANDRADE
Note: THIS IS A REINSPECTION
UTILITY COMPANY FINAL 05/09/2006 APPROVED RANDRADE
UTILITY COMMERCIAL FINAL 05/08/2006 CANCELLED BY APPLICANT KKING
ENGINEERING FINAL 05/05/2006 APPROVED WDONGOSKE
LANDSCAPE FINAL 05/03/2006 APPROVED WBUTLER
FIRE FINAL 04/27/2006 APPROVED JPATTEE
COMMERCIAL POWER INSPECTION 03/10/2006 FINAL APPROVED TOUTLAND
INSULATION INSPECTION 02/03/2006 APPROVED TOUTLAND
Note: THIS IS A REINSPECTION
INSULATION INSPECTION 02/02/2006 Disapproved -FEE REQUIRED TOUTLAND
Note: not ready
ALL ROUGH 01/27/2006 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 01/27/2006 APPROVED JLEVRAULT
FIREWALL INSPECTION 01/27/2006 APPROVED JPATTEE
2ND ROUGH ELECTRICAL 01/27/2006 APPROVED JLEVRAULT
Note: THIS IS A REINSPECTION
FIREWALL INSPECTION 3ND ROUGH 01/25/2006 CANCELLED BY APPLICANT JPATTEE
2ND ROUGH ELECTRICAL 01/25/2006 CANCELLED BY APPLICANT JMCGOWEN
ALL ROUGH 01/25/2006 CANCELLED BY APPLICANT JMCGOWEN
Note: THIS IS A REINSPECTION
H.V.A.C. ROUGH 01/13/2006 APPROVED - AS NOTED JMCGOWEN
Note: 1) Provide approved sleeve detail for supply air main penetration through slab. No protection and/or fire stop sleeve noted at time of inspection. 2) Expose exterior end of line sets prior to next inspection.
ALL ROUGH 01/09/2006 CANCELLED BY APPLICANT JLEVRAULT
SECOND ROUGH PLUMBING INSPECTION 01/09/2006 APPROVED JLEVRAULT
SECOND ROUGH PLUMBING INSPECTION 12/22/2005 CANCELLED BY INSPECTOR TOUTLAND
ALL ROUGH 12/22/2005 CANCELLED BY INSPECTOR TOUTLAND
ALL ROUGH 12/21/2005 CANCELLED BY INSPECTOR TOUTLAND
SECOND ROUGH PLUMBING INSPECTION 12/21/2005 CANCELLED BY INSPECTOR TOUTLAND
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 12/20/2005 CANCELLED BY INSPECTOR TOUTLAND
FIREWALL INSPECTION 12/20/2005 APPROVED - AS NOTED JPATTEE
Note: dry wall and framing shall extend to facia and bottom of soffit.
MONOLITHIC SLAB INSPECTION/SLAB 11/28/2005 APPROVED TOUTLAND
LINTEL 11/14/2005 APPROVED TOUTLAND
POURED CELL 11/14/2005 APPROVED TOUTLAND
FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL 11/10/2005 APPROVED CBENTLEY
Note: Approval given prior to elevation certificate. Letter of liablityl givien and certificate will be forwarded within the week
MONOLITHIC SLAB INSPECTION/SLAB 10/28/2005 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
FIRST ROUGH PLUMBING INSPECTION 10/25/2005 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
UNDERGROUND ELECTRICAL 10/25/2005 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
UNDERGROUND ELECTRICAL 10/24/2005 CANCELLED BY APPLICANT TOUTLAND
FIRST ROUGH PLUMBING INSPECTION 10/24/2005 CANCELLED BY APPLICANT TOUTLAND
MONOLITHIC SLAB INSPECTION/SLAB 10/24/2005 CANCELLED BY APPLICANT TOUTLAND
STEM FOOTING FOUNDATION 10/14/2005 APPROVED TOUTLAND

Review History

Department Status Date In Date Out
BLD COMPLETE 09/29/2005 10/04/2005
Note: Released By: LWOODROME
BLD HOLD 09/15/2005 09/22/2005
Note: Held By: CCOTE CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2005080602 (15 Riverview Bend N - Bldg. 2) 1. Provide product approval number for exterior doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide roofing application instructions per FBC 1507.4.1.2. 4. Provide a bottom plate, at landing support walls, in stair section details 1 & 2 (unit B) and section detail 1 (unit C). 5. Clarify roof sheathing thickness. (Drawing A3.1 references 5/8" while S-5 references ½") 6. Provide fire blocking, at ceiling level, for furred walls and between stair stringers, at the top and bottom of each run and in other concealed spaces as required by FBC sections 705.3 and 2305. 7. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4. 8. Provide revised location for Unit A electrical panel with adequate service clearance. Relocation required due to panel being shown at a door opening. 9. Provide electrical disconnect(s) for condensing unit and water heater, unless within sight and 50' of originating panel. 10. Provide GFCI protection for receptacle outlet(s) at Family Room side of bar, typical for all units. 11. Provide switched lighting inside attic access. 12. Provide listed lighting fixtures in damp or wet locations. 13. Clarify water heater location(s), shown on sheet M-6 (detail) in side the AHU closet, shown on architectural and plumbing sheets in the garage and electrical sheets show connections in both locations. 14. Provide auxiliary pan with secondary drain or float switch, for AHU(s) installed above 1st finish floor elevation. 15. Provide (3) copies of revised energy calculations, which are specific to each typical unit. The following items were noted, revise accordingly: a. The packets submitted do not reference the correct "Climate Zone (3), "Permitting Office" (Palm Coast) and Jurisdiction Number (281400). b. All of the exterior walls were noted as frame walls when some are masonry. c. The units over the garage do not take into account the unconditioned space at the floor level. No insulation is shown on the architectural drawings. d. The first floor units that have second floor units over them list an attic of R30, however some of the architectural plans only show R19 insulation here. e. The floor areas square footages listed do not match the floor plans. 16. The drawing index on sheet C-1 does not match the drawing set: a. A drawing S-7 is listed by not included. b. The titles of the sheets do not match the actual drawing sheets titles. c. A drawing M-7 & M-8 are listed but not included. d. A drawing E-6, E-7 & E-8 are listed but not included. e. A drawing P-9 & P-10 are listed but not included. 17. Drawings A3.1 and A3.2 reference a detail 2/A7.7.1. This drawing could not be found.
FI1 COMPLETE 08/17/2005 09/13/2005
Note: Released By: JPATTEE

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 05/11/2006
REINSPECTION FEE ¤40.00 05/05/2006
TTRANS IMPACT FEE CONDO/TOWN ¤11,648.00 10/05/2005
ADMIN FEE ¤20.00 10/05/2005
BUILDING CODE ADMIN FUND ¤75.32 10/05/2005
ELECTRIC FEE ¤690.00 10/05/2005
FIRE COMM IMPACT FEE 4-1-05 ¤7,242.77 10/05/2005
FIRE PLANS REVIEW ¤150.64 10/05/2005
MECHANICAL FEE ¤690.00 10/05/2005
PERMIT FEE ¤6,050.00 10/05/2005
PARKS IMPACT FEE 11-2-04 ¤8,967.28 10/05/2005
PLUMBING FEE ¤690.00 10/05/2005
RADON FEE ¤75.32 10/05/2005
Fees Total Due: ¤0.00 Total Paid: ¤36,379.33