I want to search for...
Permit #2005080614
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01030-0310 |
| CONDITIONED SPACE: 1819 sqft |
| GARAGE: 470 sqft |
| OPENED PORCH (WITH ROOF) : 146 sqft |
| OPENED PORCH (WITH ROOF) : 67 sqft |
| Total Square Footage: 2502 sqft |
| Block: 0103 |
| Subdivision: - |
| Job Phone: (386) 672-8285 |
| Location Address: 10 LOUISBURG LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/21/2005 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: BERNARD AND MARIA STRAMAITIS |
|
Address 14277 SW 94TH CIRCLE LANE MIAMI, FL 33186 |
| Lot: 310 |
| Contracted Stated Job Value: ¤180,000.00 |
| Job Description: RESIDENTIAL SINGLE FAMILY HOME |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
DANIEL R SHEFFIELD
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1100 Old Haw Creek Road Bunnell, FL 32110 |
EC0003100 (Exp: 08/31/2024) | 386-931-4729 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 04/21/2006 | FINAL APPROVED | JLEVRAULT |
| UTILITY COMPANY FINAL | 04/13/2006 | APPROVED | RANDRADE |
| Note: Contractor came in to cancel. Inspection already passed. Damaris | |||
| STORMWATER FINAL INSPECTION | 04/13/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: 26 s.f. road damage....$308 | |||
| UTILITY COMPANY FINAL | 04/05/2006 | APPROVED | RANDRADE |
| DRIVEWAY | 03/07/2006 | APPROVED | BFCHAMBERLAIN |
| INSULATION INSPECTION | 01/24/2006 | APPROVED | MMOORE |
| ALL ROUGH | 01/19/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| LATH /BRICK FLASHING | 01/18/2006 | APPROVED | MMOORE |
| Note: pass as noted: 1. stucco started and covers lath at garage without inspection 2. this not to happen again | |||
| ALL ROUGH | 01/17/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: THIS IS A REINSPECTION Reton.urn air vent too close to fireplace as noted in previous inspect | |||
| ALL ROUGH | 01/12/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: Bond jacuzzi motor. Return air vent too close to solid fuel burning appliance....see M1602.2 number 3 under exceptions. Remove one side of OSB from fireplace chimney so clearance to combustibles can be inspected. Provide detail showing location of makeup air to fireplace. Prior sheathing deficiencies approved. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/04/2006 | APPROVED - AS NOTED | MMOORE |
| Note: THIS IS A REINSPECTION...BEFORE ALL-ROUGH :::: 1. VAPOR BARRIER UNDER BOTH BACK BEDROOMS NON P.T. PLATES ON LINTEL AND AT SLIDER LINTEL AD NEEDED 2. 2-PLY T-11 AT BACK B. ROOM NAIL TIGHT TOGETHER | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/22/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1) Garage: page S7 detail #4 not per plan. 2) Need an approved (by City Plans Dept.) header strapping detail. 3) Left sheer wall in garage... add stud at red keel mark. 4) Truss T06 not attached at right side. 5) Install vapor barrier under all wood at front and rear entries. 6) 2-ply truss over master bath... nail tight together. 7) No ledger master bedroom, back wall. 8) Uplift 2-ply T-31 backwall only one strap. 9) At end of truss walls add 2"x 4" nailers/stiffners at bottom. | |||
| LINTEL | 12/08/2005 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/22/2005 | CANCELLED BY APPLICANT | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/21/2005 | APPROVED | JLEVRAULT |
| FIRST ROUGH PLUMBING INSPECTION | 11/17/2005 | APPROVED | JLEVRAULT |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/29/2005 | 12/30/2005 |
| Note: Released By: CCOTE Approved for Release. Revision: Header strapping detail and SP1 SP2. | |||
| BLD | COMPLETE | 12/22/2005 | 12/22/2005 |
| Note: Released By: LWOODROME Revision: Window buck attachment | |||
| BLD | COMPLETE | 09/26/2005 | 09/26/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R> | |||
| BLD | HOLD | 08/24/2005 | 08/25/2005 |
| Note: Held By: FREODICA 1. Provide chimney detail per FBC 2001/Building section 2804. 2. Provide lintel type for each window/door opening. | |||
| SWMD | COMPLETE | 08/18/2005 | 09/01/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | COMPLETE | 08/18/2005 | 08/24/2005 |
| Note: Released By: HHERKERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤308.00 | 04/24/2006 |
| REINSPECTION FEE | ¤40.00 | 04/24/2006 |
| REINSPECTION FEE | ¤40.00 | 04/24/2006 |
| REINSPECTION FEE | ¤40.00 | 04/24/2006 |
| REVISION | ¤40.00 | 04/24/2006 |
| REVISION | ¤40.00 | 04/24/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 10/21/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/21/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 10/21/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 10/21/2005 |
| MECHANICAL FEE | ¤138.00 | 10/21/2005 |
| PERMIT FEE | ¤702.00 | 10/21/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 10/21/2005 |
| PLAN CHECK FEE | ¤72.00 | 10/21/2005 |
| PLUMBING FEE | ¤138.00 | 10/21/2005 |
| RADON FEE | ¤12.51 | 10/21/2005 |
| ADMIN FEE | ¤20.00 | 10/21/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 10/21/2005 |
| BUILDING CODE ADMIN FUND | ¤12.51 | 10/21/2005 |
| ELECTRIC FEE | ¤138.00 | 10/21/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,725.40 |