Permit #2005080754
Permit Details
Status: COED
| CONDITIONED SPACE: 12193 sqft |
| GARAGE: 1888 sqft |
| OPENED PORCH (WITH ROOF) : 983 sqft |
| Total Square Footage: 15064 sqft |
| Subdivision: 2085 - Tidelands at the Village Phase II |
| Job Phone: (407)838-1486 |
| Location Address: 5 RIVERVIEW BEND N |
| Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO |
| Issue Date: 10/05/2005 |
| NOC: RECORDED |
| Applicant name: RALPH STEPHEN SMITH |
| Owner: CENTEX DESTINATION PROPERTIES |
| Contracted Stated Job Value: ¤1,100,000.00 |
| Job Description: BUILDING # 3 - 8 PLEX TOWNHOUSE |
| Type: CN |
Contractor
CENTEX DESTINATION PROPERTIES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1064 GREENWOOD BLVD LAKE MARY, FL 33746 |
SUITE 200 LAKE MARY, FL 32746 |
CGC1506882 (Exp: 09/30/2008) | (407)838-1486 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 05/10/2006 | FINAL APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/09/2006 | CANCELLED BY APPLICANT | JMCGOWEN |
| UTILITY COMMERCIAL FINAL | 05/09/2006 | APPROVED | RANDRADE |
| Note: THIS IS A REINSPECTION | |||
| UTILITY COMPANY FINAL | 05/09/2006 | APPROVED | RANDRADE |
| ENGINEERING FINAL | 05/05/2006 | APPROVED | WDONGOSKE |
| UTILITY COMMERCIAL FINAL | 05/05/2006 | CANCELLED BY APPLICANT | KKING |
| LANDSCAPE FINAL | 05/03/2006 | APPROVED | WBUTLER |
| FIRE FINAL | 04/27/2006 | APPROVED | JPATTEE |
| COMMERCIAL POWER INSPECTION | 03/10/2006 | APPROVED | TOUTLAND |
| INSULATION INSPECTION | 02/13/2006 | APPROVED | TOUTLAND |
| ALL ROUGH | 02/07/2006 | APPROVED | TOUTLAND |
| FIREWALL INSPECTION | 02/02/2006 | APPROVED | JPATTEE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/01/2006 | APPROVED | TOUTLAND |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/24/2006 | CANCELLED BY APPLICANT | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/09/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: Strap not nailed to gable end truss strut. Roof over roof straps missing. No roof ventilation or calcs. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/30/2005 | CANCELLED BY INSPECTOR | TOUTLAND |
| ALL ROUGH | 12/22/2005 | CANCELLED BY INSPECTOR | TOUTLAND |
| SECOND ROUGH PLUMBING INSPECTION | 12/22/2005 | CANCELLED BY INSPECTOR | TOUTLAND |
| SECOND ROUGH PLUMBING INSPECTION | 12/21/2005 | CANCELLED BY INSPECTOR | TOUTLAND |
| ALL ROUGH | 12/21/2005 | CANCELLED BY INSPECTOR | TOUTLAND |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/20/2005 | CANCELLED BY INSPECTOR | TOUTLAND |
| MONOLITHIC SLAB INSPECTION/SLAB | 12/12/2005 | APPROVED | TOUTLAND |
| MONOLITHIC SLAB INSPECTION/SLAB | 11/29/2005 | APPROVED | TOUTLAND |
| LINTEL | 11/15/2005 | APPROVED | TOUTLAND |
| FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL | 11/10/2005 | APPROVED | CBENTLEY |
| Note: Inspection completed prior to elevation certifictate. Letter of liability given and certificated to be delivered by next week. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 10/31/2005 | APPROVED | JMCGOWEN |
| FIRST ROUGH PLUMBING INSPECTION | 10/27/2005 | APPROVED | JMCGOWEN |
| UNDERGROUND ELECTRICAL | 10/27/2005 | APPROVED | JMCGOWEN |
| STEM FOOTING FOUNDATION | 10/18/2005 | APPROVED | JMCGOWEN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/29/2005 | 10/05/2005 |
| Note: Released By: JGONZALEZ | |||
| BLD | HOLD | 09/15/2005 | 09/23/2005 |
| Note: Held By: LWOODROME Comments on Permit Application No. 2005080754 (5 Riverview Bend N - Bldg. 3) 1. Provide product approval number for exterior doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide roofing application instructions per FBC 1507.4.1.2. 4. Provide a bottom plate, at landing support walls, in stair section details 1 & 2 (unit B) and section detail 1 (unit C). 5. Clarify roof sheathing thickness. (Drawing A3.1 references 5/8" while S-5 references ½") 6. Provide fire blocking, at ceiling level, for furred walls and between stair stringers, at the top and bottom of each run and in other concealed spaces as required by FBC sections 705.3 and 2305. 7. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4. 8. Provide revised location for Unit A electrical panel with adequate service clearance. Relocation required due to panel being shown at a door opening. 9. Provide electrical disconnect(s) for condensing unit and water heater, unless within sight and 50' of originating panel. 10. Provide GFCI protection for receptacle outlet(s) at Family Room side of bar, typical for all units. 11. Provide switched lighting inside attic access. 12. Provide listed lighting fixtures in damp or wet locations. 13. Clarify water heater location(s), shown on sheet M-6 (detail) in side the AHU closet, shown on architectural and plumbing sheets in the garage and electrical sheets show connections in both locations. 14. Provide auxiliary pan with secondary drain or float switch, for AHU(s) installed above 1st finish floor elevation. 15. Provide (3) copies of revised energy calculations, which are specific to each typical unit. The following items were noted, revise accordingly: a. The packets submitted do not reference the correct "Climate Zone (3), "Permitting Office" (Palm Coast) and Jurisdiction Number (281400). b. All of the exterior walls were noted as frame walls when some are masonry. c. The units over the garage do not take into account the unconditioned space at the floor level. No insulation is shown on the architectural drawings. d. The first floor units that have second floor units over them list an attic of R30, however some of the architectural plans only show R19 insulation here. e. The floor areas square footages listed do not match the floor plans. 16. The drawing index on sheet C-1 does not match the drawing set: a. A drawing S-7 is listed by not included. b. The titles of the sheets do not match the actual drawing sheets titles. c. A drawing M-7 & M-8 are listed but not included. d. A drawing E-6, E-7 & E-8 are listed but not included. e. A drawing P-9 & P-10 are listed but not included. 17. Drawings A3.1 and A3.2 reference a detail 2/A7.7.1. This drawing could not be found. | |||
| FI1 | COMPLETE | 08/22/2005 | 09/13/2005 |
| Note: Released By: JPATTEE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/11/2006 |
| TTRANS IMPACT FEE CONDO/TOWN | ¤11,648.00 | 10/05/2005 |
| ADMIN FEE | ¤20.00 | 10/05/2005 |
| BUILDING CODE ADMIN FUND | ¤75.32 | 10/05/2005 |
| ELECTRIC FEE | ¤690.00 | 10/05/2005 |
| FIRE COMM IMPACT FEE 4-1-05 | ¤7,242.77 | 10/05/2005 |
| FIRE PLANS REVIEW | ¤150.64 | 10/05/2005 |
| MECHANICAL FEE | ¤690.00 | 10/05/2005 |
| PERMIT FEE | ¤6,050.00 | 10/05/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤8,967.28 | 10/05/2005 |
| PLUMBING FEE | ¤690.00 | 10/05/2005 |
| RADON FEE | ¤75.32 | 10/05/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤36,339.33 |