Permit #2005080755
Permit Details
Status: COED
| CONDITIONED SPACE: 18579 sqft |
| OPENED PORCH (WITH ROOF) : 4161 sqft |
| Total Square Footage: 22740 sqft |
| Subdivision: 2085 - Tidelands at the Village Phase II |
| Job Phone: (407)838-1486 |
| Location Address: 65 RIVERVIEW BEND S |
| Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO |
| Issue Date: 10/27/2005 |
| NOC: RECORDED |
| Applicant name: JAMES NICHOLSON BOYCE IV |
| Owner: CENTEX DESTINATION PROPERTIES |
| Contracted Stated Job Value: ¤1,672,110.00 |
| Job Description: BUILDING # 17 - 12 PLEX TOWNHOUSE |
| Type: CN |
Contractor
CENTEX DESTINATION PROPERTIES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1064 GREENWOOD BLVD LAKE MARY, FL 32746 |
STE. 200 LAKE MARY, FL 32746 |
CGC1508651 (Exp: 08/31/2010) | (407)838-1486 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 09/12/2006 | FINAL APPROVED | JLEVRAULT |
| UTILITY COMMERCIAL FINAL | 09/11/2006 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 09/11/2006 | APPROVED | TSCHWEERS |
| FIRE FINAL | 08/15/2006 | APPROVED | JPATTEE |
| LANDSCAPE FINAL | 08/10/2006 | APPROVED | WBUTLER |
| ENGINEERING FINAL | 08/10/2006 | APPROVED | DMAY |
| FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL | 07/21/2006 | APPROVED - AS NOTED | CBENTLEY |
| Note: It appears that this structure is outside the flood zone A and is in C. Need surveyor to correct original elevation certificate. | |||
| COMMERCIAL POWER INSPECTION | 07/18/2006 | APPROVED | RMARVEL |
| INSULATION INSPECTION | 05/25/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 05/24/2006 | CANCELLED BY APPLICANT | JMCGOWEN |
| ALL ROUGH | 05/19/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION 3rd floor aproved | |||
| ALL ROUGH | 05/17/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: 3rd floor spacing of rec. mark white wires used as hot conductors. | |||
| INSULATION INSPECTION | 05/12/2006 | Disapproved - NO FEE | JMCGOWEN |
| Note: first and second floor insulation passed | |||
| FRAMING | 05/03/2006 | Disapproved -FEE REQUIRED | JMCGOWEN |
| Note: 1. strapping, nail plates 2. add rec. in hall and bedroom by door 3. ko plug missing 4. mc on porch | |||
| FIREWALL INSPECTION 3ND ROUGH | 05/03/2006 | APPROVED | JPATTEE |
| FIREWALL INSPECTION | 04/26/2006 | APPROVED | JPATTEE |
| SECOND ROUGH PLUMBING INSPECTION | 04/19/2006 | APPROVED | JMCGOWEN |
| Note: second floor all rough too | |||
| ALL ROUGH | 03/30/2006 | APPROVED - AS NOTED | JMCGOWEN |
| Note: check fire stop | |||
| LINTEL | 12/20/2005 | APPROVED | TOUTLAND |
| MONOLITHIC SLAB INSPECTION/SLAB | 12/07/2005 | APPROVED | TOUTLAND |
| FIRST ROUGH PLUMBING INSPECTION | 12/05/2005 | APPROVED | TOUTLAND |
| UNDERGROUND ELECTRICAL | 12/05/2005 | APPROVED | TOUTLAND |
| STEM FOOTING FOUNDATION | 11/16/2005 | APPROVED | JMCGOWEN |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/23/2006 | 09/11/2006 |
| Note: Released By: BBEMBRY approved per Carl Cote | |||
| BLD | COMPLETE | 11/29/2005 | 11/29/2005 |
| Note: Released By: LWOODROME Revision: Drywell and condesate piping | |||
| BLD | COMPLETE | 10/27/2005 | 10/27/2005 |
| Note: Released By: CCOTE Approved for Release. | |||
| BLD | HOLD | 09/22/2005 | 10/14/2005 |
| Note: Held By: FREODICA CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2005080755 (Building No. 17) 1. Provide product approval number for exterior doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide more information on details of balcony screen enclosure showing sizes, spacing and method of attachment. 4. Provide roofing application instructions per FBC 1507.4.1.2. 5. Clarify roof sheathing thickness. (Drawing A3.1C references 5/8" while S-6 references ½") 6. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4. 7. Provide electrical disconnect(s) for condensing unit and water heater, unless within sight and 50' of originating panel. 8. Provide GFCI protection for receptacle outlet(s) at Great Room side of bar, typical for all units. 9. Provide listed lighting fixtures in damp or wet locations. 10. Provide (3) copies of revised energy calculations, which are specific to each typical unit. a. The following items were noted, revise accordingly. The packets submitted do not reference the correct "Permitting Office" (Palm Coast) and Jurisdiction Number (281400). 11. Clarify dryer vent equivalent length, 50 ft or 60 ft? Please add note to provide signs or stencils, which read, "Dryer shall be capable of venting through 60 equivalent ft." on wall close to dryer. 12. On sanitary riser diagrams, show how vent system is connected from 1st floor to 3rd floor to outside the building. 13. A1.1S, A1.2S, A1.3S, A5.2 & A7.3: a. Stair tread and riser height shall meet code. 14. A1.2A & A1.2B: a. Delete all notes not applicable (4rth floor plan title, room notes etc.) 15. A4.2: a. Show location of AC-1 on second floor elevator room.(see comment 18b) 16. A7.5.1: a. Detail 7- Tenant Separation @ Top Floor on A i. Clarify referenced detail 2/A7.5 ii. Clarify referenced sheet A7.7 17. M1 to M2: a. Coordinate all Plan key notes references to match referenced details/sheets. b. Indicate exhaust fan/dryer ducts routing reference dwg. continuation. 18. M3: a. Same as 16a. b. Coordinate with Architectural/structural the location of AC-1 opening for elevator room. How is condensate drain routed outside the building.(see plan note 6). c. Revise HP units quantity to match with electrical-(E3). 19. P5: a. Sanitary risers S/5 & S/6 are interchanged. b. Sanitary riser S/5 does not match with layout. c. Domestic water riser- Unit A title is missing 20. P6: a. Coordinate references on risers W/1 & TP/1 with plan notes. 21. Cover sheet: a. Revise Index of Drawings to match drawing sheets. i. AS-1 Architectural site plan is missing in the package. | |||
| FI1 | COMPLETE | 08/22/2005 | 09/21/2005 |
| Note: Released By: JPATTEE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/13/2006 |
| REINSPECTION FEE | ¤40.00 | 09/13/2006 |
| REVISION | ¤40.00 | 09/13/2006 |
| REVISION | ¤40.00 | 09/13/2006 |
| TTRANS IMPACT FEE CONDO/TOWN | ¤17,472.00 | 10/27/2005 |
| ADMIN FEE | ¤20.00 | 10/27/2005 |
| BUILDING CODE ADMIN FUND | ¤113.70 | 10/27/2005 |
| ELECTRIC FEE | ¤1,033.80 | 10/27/2005 |
| FIRE COMM IMPACT FEE 4-1-05 | ¤10,933.39 | 10/27/2005 |
| FIRE PLANS REVIEW | ¤227.40 | 10/27/2005 |
| MECHANICAL FEE | ¤1,033.80 | 10/27/2005 |
| PERMIT FEE | ¤9,201.50 | 10/27/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤13,450.92 | 10/27/2005 |
| PLUMBING FEE | ¤1,033.80 | 10/27/2005 |
| RADON FEE | ¤113.70 | 10/27/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤54,794.01 |