Permit #2005080756
Permit Details
Status: COED
| CONDITIONED SPACE: 44744 sqft |
| OPENED PORCH (WITH ROOF) : 13088 sqft |
| Total Square Footage: 57832 sqft |
| Subdivision: 2085 - Tidelands at the Village Phase II |
| Job Phone: (407)838-1486 |
| Location Address: 35 RIVERVIEW BEND S |
| Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO |
| Issue Date: 10/14/2005 |
| NOC: RECORDED |
| Applicant name: JAMES NICHOLSON BOYCE IV |
| Owner: CENTEX DESTINATION PROPERTIES |
| Contracted Stated Job Value: ¤1,672,110.00 |
| Job Description: BUILDING # 18 - 28 PLEX TOWNHOUSE |
| Type: CN |
Contractor
CENTEX DESTINATION PROPERTIES
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
1064 GREENWOOD BLVD LAKE MARY, FL 32746 |
STE. 200 LAKE MARY, FL 32746 |
CGC1508651 (Exp: 08/31/2010) | (407)838-1486 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 11/07/2006 | FINAL APPROVED | JMCGOWEN |
| Note: electrical final approved. RM | |||
| UTILITY COMMERCIAL FINAL | 11/03/2006 | APPROVED | KKING |
| UTILITY COMPANY FINAL | 11/03/2006 | APPROVED | TSCHWEERS |
| FIRE FINAL | 11/03/2006 | APPROVED | JPATTEE |
| ENGINEERING FINAL | 11/01/2006 | APPROVED | MCOBB |
| LANDSCAPE FINAL | 10/27/2006 | APPROVED | WBUTLER |
| FOOTER | 10/05/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: TRELLIS WALL FOOTING. | |||
| LINTEL | 09/26/2006 | Disapproved - NO FEE | JLEVRAULT |
| Note: NEED LETTER OF MISSED INSPECTION. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 09/26/2006 | Disapproved - NO FEE | JLEVRAULT |
| Note: NEED LETTER OF MISSED INSPECTION. | |||
| COMMERCIAL POWER INSPECTION | 09/12/2006 | APPROVED | RMARVEL |
| COMMERCIAL POWER INSPECTION | 09/08/2006 | APPROVED | RMARVEL |
| COMMERCIAL POWER INSPECTION | 09/06/2006 | APPROVED | RMARVEL |
| COMMERCIAL POWER INSPECTION | 08/24/2006 | APPROVED | RMARVEL |
| INSULATION INSPECTION | 07/19/2006 | APPROVED | JLEVRAULT |
| Note: INSULATION IS NOW APPROVED FOR COMPLETE BUILDING. | |||
| COMMERCIAL POWER INSPECTION | 07/18/2006 | APPROVED | RMARVEL |
| INSULATION INSPECTION | 06/30/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: THIRD FLOOR ONLY. | |||
| INSULATION INSPECTION | 06/23/2006 | APPROVED - AS NOTED | JLEVRAULT |
| Note: FIRST AND SECOND FLOOR ONLY. | |||
| ALL ROUGH | 06/22/2006 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 06/19/2006 | Disapproved - NO FEE | RMARVEL |
| Note: 4th floor electrical rough is good. The 3rd floor is a partial inspection. just waiting for them to add receptacles in few locations.kitchen, living room, and foyer. THIRD AND FOURTH FLOOR MECHANICAL AND FRAMING ARE PASSED BY JRL. | |||
| FIREWALL INSPECTION | 06/12/2006 | APPROVED - AS NOTED | JPATTEE |
| SECOND ROUGH PLUMBING INSPECTION | 06/06/2006 | Disapproved - NO FEE | JGIBSON |
| Note: OK to pull test on third & forth floor fire collars & fire caulking not completed | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 05/22/2006 | APPROVED | PPROVIDER |
| Note: THIS IS A REINSPECTION Threshold inspectors report | |||
| ALL ROUGH | 04/20/2006 | APPROVED | JMCGOWEN |
| Note: first and second floor | |||
| TEMPORARY POLE | 04/10/2006 | APPROVED | JMCGOWEN |
| Note: called FPL - Susan - 4-12-06 Some confusion about the approved inspection dates | |||
| LINTEL | 03/21/2006 | APPROVED | PPROVIDER |
| Note: THIS IS A REINSPECTION Threshold inspectors report | |||
| FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL | 02/03/2006 | APPROVED | CBENTLEY |
| MONOLITHIC SLAB INSPECTION/SLAB | 01/10/2006 | APPROVED | JLEVRAULT |
| Note: Second floor slab. | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 12/05/2005 | APPROVED | TOUTLAND |
| FIRST ROUGH PLUMBING INSPECTION | 11/29/2005 | APPROVED | TOUTLAND |
| UNDERGROUND ELECTRICAL | 11/29/2005 | APPROVED | TOUTLAND |
| STEM FOOTING FOUNDATION | 11/14/2005 | APPROVED | TOUTLAND |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/12/2006 | 06/12/2006 |
| Note: Released By: LWOODROME Revision: Roof access details | |||
| BLD | COMPLETE | 11/02/2005 | 11/03/2005 |
| Note: Released By: LWOODROME Revision: Energy calculations, HVAC seer, from gable to hip roof | |||
| BLD | COMPLETE | 10/11/2005 | 10/13/2005 |
| Note: Released By: LWOODROME | |||
| BLD | HOLD | 09/20/2005 | 09/30/2005 |
| Note: CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2005080756 (Building No. 18) 1. Provide product approval number for exterior doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide more information on details of balcony screen enclosure showing sizes, spacing and method of attachment. 4. Provide roofing application instructions per FBC 1507.4.1.2. 5. Clarify roof sheathing thickness. (Drawing A3.1C references 5/8" while S-6 references ½") 6. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4. 7. Provide electrical disconnect(s) for condensing unit and water heater, unless within sight and 50' of originating panel. See Unit D on E4. 8. Provide GFCI protection for receptacle outlet(s) at Dining Room side of bar, typical for all units. 9. Provide listed lighting fixtures in damp or wet locations. 10. Provide (3) copies of revised energy calculations, which are specific to each typical unit. a. The following items were noted, revise accordingly. The packets submitted do not reference the correct "Climate Zone (North), "Permitting Office" (Palm Coast) and Jurisdiction Number (281400). b. The floor areas square footages listed do not match the floor plans. 11. On Roof Mechanical Plan (M7), exhaust fan/dryer vents penetrate through the roof while typical HVAC layout & structural roof framing plan (S-5) show wall penetrations. Please clarify. 12. On M3, clarify dryer vent equivalent length, 50 ft or 60 ft? Please add note to provide signs or stencils, which read, "Dryer shall be capable of venting through 60 equivalent ft." on wall close to dryer. 13. Equipment access through roof, 36x36 scuttle (A3.1C) does not show on structural roof framing plan. Provide structural section/detail and means of access. 14. On sanitary riser diagrams, show how vent system is connected from 1st floor to 4th floor to outside the building. 15. On E5, clarify key note #5, is disconnect switch on heat pump D same for both DL/DT? 16. On P9: a. One (1) bathroom group is missing on domestic water riser for Unit A. b. One (1) water closet & (1) lavatory are missing on water riser for Unit D. 17. On P10: a. Sanitary risers S/2 & S/3 for Unit A are interchanged. b. Sanitary risers S/7 (WC-1) & S/3 should be S/5 & S/6 respectively. 18. On P6 & P7: a. Clarify sanitary risers for Unit C. (All are S/5). b. Sanitary riser S/11 for Unit D is missing (P6 only). CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2005080756 (Building No. 18) - DWG.-References Coodination 1. Dwg. sheet A2.1: a. Referenced 5/A4.2 does not match elevation (flipped windows). b. Referenced 6/A7.1 is missing. 2. Dwg. sheet A4.1, referenced detail 7/A7.1 is missing. 3. Dwg. sheet A7.5.1: a. Detail 7- Tenant Separation @ Top Floor i. Clarify referenced detail 2/A7.5 ii. Clarify referenced sheet A7.7 4. Dwg. sheet M1: a. Plan key notes 1,3,& 4 which referenced detail on M7 should be M8. b. Clarify exhaust /dryer vents continuation for Unit B HVAC Plan. The note says "See Building Plan on M3 & M4" 5. Dwg. sheet M2: a. Same as 4a above. b. Same as 4b above. c. Plan key notes #12 & #13 descriptions are missing but shown on Plan. 6. Dwg. sheet M3: a. Same as 4a & 4b. 7. Dwg. sheet M4: a. Same as 4a & 4b. b. Clarify Plan key note #11, please delete if not required. 8. Dwg. sheets M5 & M6 & M7 a. Revise plan key notes referenced dwg. sheets to match details. | |||
| FI1 | COMPLETE | 08/22/2005 | 09/19/2005 |
| Note: Released By: JPATTEE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 10/24/2006 |
| REVISION | ¤40.00 | 10/24/2006 |
| TTRANS IMPACT FEE CONDO/TOWN | ¤40,768.00 | 10/14/2005 |
| ADMIN FEE | ¤20.00 | 10/14/2005 |
| BUILDING CODE ADMIN FUND | ¤289.16 | 10/14/2005 |
| ELECTRIC FEE | ¤1,983.00 | 10/14/2005 |
| FIRE COMM IMPACT FEE 4-1-05 | ¤27,805.63 | 10/14/2005 |
| FIRE PLANS REVIEW | ¤578.32 | 10/14/2005 |
| MECHANICAL FEE | ¤1,983.00 | 10/14/2005 |
| PERMIT FEE | ¤17,902.50 | 10/14/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤31,385.48 | 10/14/2005 |
| PLUMBING FEE | ¤1,983.00 | 10/14/2005 |
| RADON FEE | ¤289.16 | 10/14/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤125,067.25 |