Permit #2005080756

Permit Details

Status: COED

CONDITIONED SPACE: 44744 sqft
OPENED PORCH (WITH ROOF) : 13088 sqft
Total Square Footage: 57832 sqft
Subdivision: 2085 - Tidelands at the Village Phase II
Job Phone: (407)838-1486
Location Address: 35 RIVERVIEW BEND S
Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO
Issue Date: 10/14/2005
NOC: RECORDED
Applicant name: JAMES NICHOLSON BOYCE IV
Owner: CENTEX DESTINATION PROPERTIES
Contracted Stated Job Value: ¤1,672,110.00
Job Description: BUILDING # 18 - 28 PLEX TOWNHOUSE
Type: CN

Contractor

CENTEX DESTINATION PROPERTIES
Status Location Address Mailing Address State License Number Phone
CANCEL

1064 GREENWOOD BLVD

LAKE MARY, FL 32746

STE. 200

LAKE MARY, FL 32746

CGC1508651 (Exp: 08/31/2010) (407)838-1486

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 11/07/2006 FINAL APPROVED JMCGOWEN
Note: electrical final approved. RM
UTILITY COMMERCIAL FINAL 11/03/2006 APPROVED KKING
UTILITY COMPANY FINAL 11/03/2006 APPROVED TSCHWEERS
FIRE FINAL 11/03/2006 APPROVED JPATTEE
ENGINEERING FINAL 11/01/2006 APPROVED MCOBB
LANDSCAPE FINAL 10/27/2006 APPROVED WBUTLER
FOOTER 10/05/2006 APPROVED - AS NOTED JLEVRAULT
Note: TRELLIS WALL FOOTING.
LINTEL 09/26/2006 Disapproved - NO FEE JLEVRAULT
Note: NEED LETTER OF MISSED INSPECTION.
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 09/26/2006 Disapproved - NO FEE JLEVRAULT
Note: NEED LETTER OF MISSED INSPECTION.
COMMERCIAL POWER INSPECTION 09/12/2006 APPROVED RMARVEL
COMMERCIAL POWER INSPECTION 09/08/2006 APPROVED RMARVEL
COMMERCIAL POWER INSPECTION 09/06/2006 APPROVED RMARVEL
COMMERCIAL POWER INSPECTION 08/24/2006 APPROVED RMARVEL
INSULATION INSPECTION 07/19/2006 APPROVED JLEVRAULT
Note: INSULATION IS NOW APPROVED FOR COMPLETE BUILDING.
COMMERCIAL POWER INSPECTION 07/18/2006 APPROVED RMARVEL
INSULATION INSPECTION 06/30/2006 APPROVED - AS NOTED JLEVRAULT
Note: THIRD FLOOR ONLY.
INSULATION INSPECTION 06/23/2006 APPROVED - AS NOTED JLEVRAULT
Note: FIRST AND SECOND FLOOR ONLY.
ALL ROUGH 06/22/2006 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
ALL ROUGH 06/19/2006 Disapproved - NO FEE RMARVEL
Note: 4th floor electrical rough is good. The 3rd floor is a partial inspection. just waiting for them to add receptacles in few locations.kitchen, living room, and foyer. THIRD AND FOURTH FLOOR MECHANICAL AND FRAMING ARE PASSED BY JRL.
FIREWALL INSPECTION 06/12/2006 APPROVED - AS NOTED JPATTEE
SECOND ROUGH PLUMBING INSPECTION 06/06/2006 Disapproved - NO FEE JGIBSON
Note: OK to pull test on third & forth floor fire collars & fire caulking not completed
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 05/22/2006 APPROVED PPROVIDER
Note: THIS IS A REINSPECTION Threshold inspectors report
ALL ROUGH 04/20/2006 APPROVED JMCGOWEN
Note: first and second floor
TEMPORARY POLE 04/10/2006 APPROVED JMCGOWEN
Note: called FPL - Susan - 4-12-06 Some confusion about the approved inspection dates
LINTEL 03/21/2006 APPROVED PPROVIDER
Note: THIS IS A REINSPECTION Threshold inspectors report
FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL 02/03/2006 APPROVED CBENTLEY
MONOLITHIC SLAB INSPECTION/SLAB 01/10/2006 APPROVED JLEVRAULT
Note: Second floor slab.
MONOLITHIC SLAB INSPECTION/SLAB 12/05/2005 APPROVED TOUTLAND
FIRST ROUGH PLUMBING INSPECTION 11/29/2005 APPROVED TOUTLAND
UNDERGROUND ELECTRICAL 11/29/2005 APPROVED TOUTLAND
STEM FOOTING FOUNDATION 11/14/2005 APPROVED TOUTLAND

Review History

Department Status Date In Date Out
BLD COMPLETE 06/12/2006 06/12/2006
Note: Released By: LWOODROME Revision: Roof access details
BLD COMPLETE 11/02/2005 11/03/2005
Note: Released By: LWOODROME Revision: Energy calculations, HVAC seer, from gable to hip roof
BLD COMPLETE 10/11/2005 10/13/2005
Note: Released By: LWOODROME
BLD HOLD 09/20/2005 09/30/2005
Note: CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2005080756 (Building No. 18) 1. Provide product approval number for exterior doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection. 2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015. 3. Provide more information on details of balcony screen enclosure showing sizes, spacing and method of attachment. 4. Provide roofing application instructions per FBC 1507.4.1.2. 5. Clarify roof sheathing thickness. (Drawing A3.1C references 5/8" while S-6 references ½") 6. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4. 7. Provide electrical disconnect(s) for condensing unit and water heater, unless within sight and 50' of originating panel. See Unit D on E4. 8. Provide GFCI protection for receptacle outlet(s) at Dining Room side of bar, typical for all units. 9. Provide listed lighting fixtures in damp or wet locations. 10. Provide (3) copies of revised energy calculations, which are specific to each typical unit. a. The following items were noted, revise accordingly. The packets submitted do not reference the correct "Climate Zone (North), "Permitting Office" (Palm Coast) and Jurisdiction Number (281400). b. The floor areas square footages listed do not match the floor plans. 11. On Roof Mechanical Plan (M7), exhaust fan/dryer vents penetrate through the roof while typical HVAC layout & structural roof framing plan (S-5) show wall penetrations. Please clarify. 12. On M3, clarify dryer vent equivalent length, 50 ft or 60 ft? Please add note to provide signs or stencils, which read, "Dryer shall be capable of venting through 60 equivalent ft." on wall close to dryer. 13. Equipment access through roof, 36x36 scuttle (A3.1C) does not show on structural roof framing plan. Provide structural section/detail and means of access. 14. On sanitary riser diagrams, show how vent system is connected from 1st floor to 4th floor to outside the building. 15. On E5, clarify key note #5, is disconnect switch on heat pump D same for both DL/DT? 16. On P9: a. One (1) bathroom group is missing on domestic water riser for Unit A. b. One (1) water closet & (1) lavatory are missing on water riser for Unit D. 17. On P10: a. Sanitary risers S/2 & S/3 for Unit A are interchanged. b. Sanitary risers S/7 (WC-1) & S/3 should be S/5 & S/6 respectively. 18. On P6 & P7: a. Clarify sanitary risers for Unit C. (All are S/5). b. Sanitary riser S/11 for Unit D is missing (P6 only). CITY OF PALM COAST BUILDING DIVISION Comments on Permit Application No. 2005080756 (Building No. 18) - DWG.-References Coodination 1. Dwg. sheet A2.1: a. Referenced 5/A4.2 does not match elevation (flipped windows). b. Referenced 6/A7.1 is missing. 2. Dwg. sheet A4.1, referenced detail 7/A7.1 is missing. 3. Dwg. sheet A7.5.1: a. Detail 7- Tenant Separation @ Top Floor i. Clarify referenced detail 2/A7.5 ii. Clarify referenced sheet A7.7 4. Dwg. sheet M1: a. Plan key notes 1,3,& 4 which referenced detail on M7 should be M8. b. Clarify exhaust /dryer vents continuation for Unit B HVAC Plan. The note says "See Building Plan on M3 & M4" 5. Dwg. sheet M2: a. Same as 4a above. b. Same as 4b above. c. Plan key notes #12 & #13 descriptions are missing but shown on Plan. 6. Dwg. sheet M3: a. Same as 4a & 4b. 7. Dwg. sheet M4: a. Same as 4a & 4b. b. Clarify Plan key note #11, please delete if not required. 8. Dwg. sheets M5 & M6 & M7 a. Revise plan key notes referenced dwg. sheets to match details.
FI1 COMPLETE 08/22/2005 09/19/2005
Note: Released By: JPATTEE

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 10/24/2006
REVISION ¤40.00 10/24/2006
TTRANS IMPACT FEE CONDO/TOWN ¤40,768.00 10/14/2005
ADMIN FEE ¤20.00 10/14/2005
BUILDING CODE ADMIN FUND ¤289.16 10/14/2005
ELECTRIC FEE ¤1,983.00 10/14/2005
FIRE COMM IMPACT FEE 4-1-05 ¤27,805.63 10/14/2005
FIRE PLANS REVIEW ¤578.32 10/14/2005
MECHANICAL FEE ¤1,983.00 10/14/2005
PERMIT FEE ¤17,902.50 10/14/2005
PARKS IMPACT FEE 11-2-04 ¤31,385.48 10/14/2005
PLUMBING FEE ¤1,983.00 10/14/2005
RADON FEE ¤289.16 10/14/2005
Fees Total Due: ¤0.00 Total Paid: ¤125,067.25