I want to search for...
Permit #2005080771
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01220-0070 |
| CONDITIONED SPACE: 2410 sqft |
| GARAGE: 648 sqft |
| OPENED PORCH (WITH ROOF) : 331 sqft |
| OPENED PORCH (WITH ROOF) : 98 sqft |
| Total Square Footage: 3487 sqft |
| Block: 0122 |
| Subdivision: - |
| Job Phone: (386)437-1270 |
| Location Address: 48 LONGFELLOW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/08/2005 |
| NOC: RECORDED |
| Applicant name: EUGENE THOMAS |
| Owner: PALMER-VITALIS ANN-MARIE & |
|
Address LINCOLN A W&H MIRAMAR, FL 33025 |
|
Address 2007 SW 102 TERRACE MIRAMAR, FL 33025 |
| Lot: 070 |
| Contracted Stated Job Value: ¤234,090.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
CANTERBURY ESTATE HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
3222 NW 136TH ST GAINSVILLE, FL 32606 |
CBC1250201 (Exp: 09/30/2008) | (386)437-1270 | (386)437-9667 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P. O. Box 1963 Bunnell, FL 32110 |
ER0011613 (Exp: 08/31/2008) | (386) 437-0607 | (386)437-1847 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 11/08/2006 | FINAL APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 11/07/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. MICROWAVE EXHAUST MISSING 2. GRILL COVER MISSING AT KITCHEN CLOSET | |||
| UTILITY COMPANY FINAL | 11/02/2006 | APPROVED | TSCHWEERS |
| STORMWATER FINAL INSPECTION | 10/31/2006 | APPROVED - AS NOTED | DRANDALL |
| Note: 26 sf road damage | |||
| DRIVEWAY | 09/05/2006 | APPROVED | DRANDALL |
| LATH /BRICK FLASHING | 06/09/2006 | APPROVED | JLEVRAULT |
| INSULATION INSPECTION | 06/08/2006 | APPROVED | PGALLMANN |
| ALL ROUGH | 05/25/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 05/23/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: THIS IS A REINSPECTION CARRIAGE LIGHT PANCAKE BOXES AND SOME INTERIOR METAL BOXES STILL NOT BONDED. WIRES IN WALL BAY IN REAR NOT INSTALLED IN BOX. NO BATH VENT IN MASTER BED BATH...BATH VANITY WIRE NOT PROTECTED. GROUT WALL WHERE PLUMBING WAS REPAIRED IN MASTER BATH. | |||
| ALL ROUGH | 05/15/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: FRONT BOXOUT SHEATHING LOWER SECTION MUST BE PT PLYWOOD. CARRIAGE LIGHT PANCAKE BOXES NOT GROUNDED. CARRIAGE LIGHT JUNCTION BOXES HAVE COVERS ON THEM - CANNOT INSPECT. METAL BOXES IN HOUSE NOT GROUNDED. MASTER BATH TUB NOT INSTALLED. MASTER BATH EXHAUST FANS NOT INSTALLED. MASTER BATH SINK NOT VENTED. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/06/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/31/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. GARAGE WINDOW GABLE/ X-BRACE 2. 2-PLY GARAGE NAIL TIGHT TOGETHER USING TRUSS NAIL PATTERN FOR THESE TRUSSES 3. 2-PLY M. BATH ENTRY-LOSE BOLTS AT HANGER 4. CHECK ALL MGT NUTS 5. GROUT TRUSSES WITH STONELESS GROUT | |||
| LINTEL | 01/18/2006 | APPROVED | MMOORE |
| Note: 1. pl 400/ or construction adhesive will no longer be approved as an epoxy for dowels 2. an approved dowel repair must be followed for now on for lintels to pass inspection | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 12/22/2005 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 12/16/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: Compaction test required before pour. | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/14/2005 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/12/2005 | CANCELLED BY APPLICANT | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/09/2005 | CANCELLED BY APPLICANT | JLEVRAULT |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/22/2006 | 03/23/2006 |
| Note: Released By: LWOODROME Revision: Truss repair | |||
| BLD | COMPLETE | 03/07/2006 | 03/09/2006 |
| Note: Released By: LWOODROME Revision: Truss package and truss repairs | |||
| BLD | COMPLETE | 10/14/2005 | 10/17/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R> | |||
| BLD | HOLD | 10/07/2005 | 10/10/2005 |
| Note: Held By: FREODICA 1. Provide section on family room bump-out as truss layout does not cover that area. If it would be handframed, then show the framing size, spacing, material connectors & the lintel size over the opening . If not handframed, then revised the truss layout to match the floor plan that covers the family room bump-out area. | |||
| BLD | HOLD | 09/08/2005 | 09/20/2005 |
| Note: Held By: FREODICA 1. Please submit (2) copies of foundation plan and (2) copies of thruss layout with connectors schedule to match floor plan. | |||
| BLD | HOLD | 08/30/2005 | 08/31/2005 |
| Note: Held By: FREODICA 1. Provide specific type of precast lintel to be used for each window/door openings including covered patio, garage and porch. | |||
| ZON | COMPLETE | 08/23/2005 | 08/30/2005 |
| Note: Released By: DCHAUDOIN | |||
| SWMD | COMPLETE | 08/22/2005 | 08/30/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | REJECT | 08/22/2005 | 08/23/2005 |
| Note: Rejected By: DCHAUDOIN Held By: DCHAUDOIN EXTERIOR COLORS ARE UNACCEPTABLE |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤308.00 | 11/09/2006 |
| REINSPECTION FEE | ¤40.00 | 11/09/2006 |
| REINSPECTION FEE | ¤40.00 | 11/09/2006 |
| REINSPECTION FEE | ¤40.00 | 11/09/2006 |
| REINSPECTION FEE | ¤40.00 | 11/09/2006 |
| REVISION | ¤40.00 | 11/09/2006 |
| REVISION | ¤40.00 | 11/09/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 12/08/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/08/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 12/08/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 12/08/2005 |
| MECHANICAL FEE | ¤171.00 | 12/08/2005 |
| PERMIT FEE | ¤916.50 | 12/08/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 12/08/2005 |
| PLAN CHECK FEE | ¤94.00 | 12/08/2005 |
| PLUMBING FEE | ¤171.00 | 12/08/2005 |
| RADON FEE | ¤17.44 | 12/08/2005 |
| ADMIN FEE | ¤20.00 | 12/08/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 12/08/2005 |
| BUILDING CODE ADMIN FUND | ¤17.44 | 12/08/2005 |
| ELECTRIC FEE | ¤171.00 | 12/08/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,110.76 |