| CONDITIONED SPACE: 29852 sqft |
| OPENED PORCH (WITH ROOF) : 6624 sqft |
| Total Square Footage: 36476 sqft |
| Subdivision: 2085 - Tidelands at the Village Phase II |
| Job Phone: (407)838-1486 |
| Location Address: 75 RIVERVIEW BEND S |
| Type: BCR - BUILDING COMMERCIAL RESIDENTIAL -CONDO |
| Issue Date: 12/08/2005 |
| NOC: RECORDED |
| Applicant name: JAMES NICHOLSON BOYCE IV |
| Owner: CENTEX DESTINATION PROPERTIES |
| Contracted Stated Job Value: ¤2,686,680.00 |
| Job Description: BUILDING #16 20 PLEX CONDOMINIUM UNIT |
| Type: CN |
| Type |
Request Date |
Result |
Inspector |
|
FINAL COMPLETE BUILDING INSPECTION |
11/07/2006 |
FINAL APPROVED |
JLEVRAULT |
|
Note: electrical final approved. RM
|
|
UTILITY COMMERCIAL FINAL |
11/03/2006 |
APPROVED |
KKING |
|
UTILITY COMPANY FINAL |
11/03/2006 |
APPROVED |
TSCHWEERS |
|
ENGINEERING FINAL |
11/01/2006 |
APPROVED |
MCOBB |
|
LANDSCAPE FINAL |
10/27/2006 |
APPROVED |
WBUTLER |
|
FIRE FINAL |
10/20/2006 |
APPROVED |
JPATTEE |
|
MONOLITHIC SLAB INSPECTION/SLAB |
09/22/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
FOOTER |
09/22/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
LINTEL |
09/22/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
FRAMING |
09/22/2006 |
APPROVED |
JLEVRAULT |
|
Note: FRAMING PASSED 6/27/06 AND 7/26/06 PER HISTORY SHEET.
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/22/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
COMMERCIAL POWER INSPECTION |
09/15/2006 |
APPROVED - AS NOTED |
RMARVEL |
|
Note: fourth floor early power. released to fpl
|
|
COMMERCIAL POWER INSPECTION |
09/08/2006 |
APPROVED |
RMARVEL |
|
COMMERCIAL POWER INSPECTION |
09/01/2006 |
APPROVED |
RMARVEL |
|
INSULATION INSPECTION |
08/03/2006 |
APPROVED |
JLEVRAULT |
|
Note: pREVIOUSLY APPROVED ON 7/20/06.
|
|
COMMERCIAL POWER INSPECTION |
08/02/2006 |
APPROVED |
RMARVEL |
|
FIREWALL INSPECTION |
07/31/2006 |
APPROVED |
JPATTEE |
|
FIREWALL INSPECTION |
07/27/2006 |
APPROVED |
JPATTEE |
|
ALL ROUGH |
07/26/2006 |
APPROVED - AS NOTED |
JGIBSON |
|
Note: Third & forth floor plumbing tested OK. THIRD AND FOURTH FLOORS PASSED FRAMING AND MECHANICAL INSPECTION (JL).
|
|
SECOND ROUGH PLUMBING INSPECTION |
07/25/2006 |
APPROVED - AS NOTED |
JGIBSON |
|
Note: Third & forth floor plumbing OK.
|
|
SECOND ROUGH PLUMBING INSPECTION |
07/24/2006 |
CANCELLED BY APPLICANT |
JLEVRAULT |
|
INSULATION INSPECTION |
07/20/2006 |
APPROVED |
JLEVRAULT |
|
Note: INSULATION NOW COMPLETE ON THIS BUILDING.
|
|
INSULATION INSPECTION |
07/17/2006 |
APPROVED - AS NOTED |
JLEVRAULT |
|
Note: THIS IS A REINSPECTION FIRST FLOOR ONLY - SECOND FLOOR STILL NOT READY.
|
|
INSULATION INSPECTION |
07/13/2006 |
Disapproved -FEE REQUIRED |
JLEVRAULT |
|
Note: NOT READT - INSULATION MISSING - RIDGID INSULATION MISSING - REMOVE PAPER FROM TOP OF BATH VENT CANS.
|
|
FIREWALL INSPECTION |
07/13/2006 |
APPROVED - AS NOTED |
JPATTEE |
|
Note: 1st and 2nd floor penetrations
|
|
ALL ROUGH |
06/27/2006 |
Disapproved - NO FEE |
RMARVEL |
|
Note: 1st and 2nd floor are ok. FRAMING AND MECHANICAL ARE PASSED AS NOTED ON FIRST AND SECOND FLOOR. ALL WINDOWS AND DOORS MUST BE TAPCONNED ACCORDING TO PLAN DETAILS. INSTALL PROTECTIVE WIRE PLATED WHERE REQUIRED.**************CHECK AT INSULATION**************
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
06/20/2006 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors report
|
|
SECOND ROUGH PLUMBING INSPECTION |
04/19/2006 |
APPROVED |
JMCGOWEN |
|
Note: first and second floor
|
|
SECOND FLOOR SLAB INSPECTION |
02/15/2006 |
APPROVED |
PPROVIDER |
|
Note: Threshold inspectors report
|
|
LINTEL |
02/15/2006 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors report
|
|
POURED CELL |
02/06/2006 |
APPROVED |
PPROVIDER |
|
MONOLITHIC SLAB INSPECTION/SLAB |
01/23/2006 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors report
|
|
FIRST ROUGH PLUMBING INSPECTION |
01/18/2006 |
APPROVED |
TOUTLAND |
|
UNDERGROUND ELECTRICAL |
01/18/2006 |
APPROVED |
TOUTLAND |
|
FOOTER |
12/17/2005 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors report
|
|
STEM FOOTING FOUNDATION |
12/16/2005 |
CANCELLED BY INSPECTOR |
TOUTLAND |
| Department |
Status |
Date In |
Date Out |
|
BLD |
COMPLETE |
12/02/2005 |
12/05/2005 |
| Note: Released By: LWOODROME
|
|
BLD |
HOLD |
11/28/2005 |
11/28/2005 |
| Note: Held By: FREODICA
Refering to your response to plan review comments:
1. Comment #12, SGM's response was ok except for sanitary risers S/2 & S/4 on sheet P6. On S/2, the bathroom vents(except on 4th floor) shall not be connected to the 4" main soil or waste stack.
Also, please recalculate the size of the vent stack through the roof per FBC 2001/P table 916.1.
Similary, on sanitary riser S/4, the stack vent shall be sized per FBC 2001/P table 916.1.
2. Comment #17c, condesate disposal shall be revised to comply with FBC 2001/P as previously discussed.
|
|
BLD |
HOLD |
09/23/2005 |
10/15/2005 |
| Note: Held By: FREODICA
CITY OF PALM COAST BUILDING DIVISION
Comments on Permit Application No. 2005080974 (Building No. 16)
1. Provide product approval number for exterior doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection.
2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015.
3. Provide more information on details of balcony screen enclosure showing sizes, spacing and method of attachment.
4. Provide roofing application instructions per FBC 1507.4.1.2.
5. Clarify roof sheathing thickness. (Drawing A3.1C references 5/8" while S-6 references ½")
6. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4.
7. Provide electrical disconnect(s) for condensing unit and water heater, unless within sight and 50' of originating panel.
8. Provide GFCI protection for receptacle outlet(s) at Great Room side of bar, typical for all units.
9. Provide listed lighting fixtures in damp or wet locations.
10. Provide (3) copies of revised energy calculations, which are specific to each typical unit.
a. The following items were noted, revise accordingly. The packets submitted do not reference the correct "Permitting Office" (Palm Coast) and Jurisdiction Number (281400).
11. Clarify dryer vent equivalent length, 50 ft or 60 ft? Please add note to provide signs or stencils, which read, "Dryer shall be capable of venting through 60 equivalent ft." on wall close to dryer.
12. On sanitary riser diagrams, show how vent system is connected from 1st floor to 4th floor
to outside the building.
13. A1.1S, A1.2S, A1.3S, A5.2 & A7.3:
a. Stair tread and riser height shall meet code.
14. A5.3, A4.1:
a. Show location of AC-1 on second floor elevator room.(see comment 18b)
15. A7.5.1:
a. Detail 7- Tenant Separation @ Top Floor on A
i. Clarify referenced detail 2/A7.5
ii. Clarify referenced sheet A7.7
16. M1 to M2:
a. Plan key note #2 (refrigerant/condensate piping) continuation reference sheet not shown.
b. Indicate fan/dryer exhaust ducts routing reference dwg. continuation.
17. M3:
a. Condensing units(heat pumps) are shown 15 only instead of 20 units.
b. Coordinate with Architectural/structural the location of AC-1 opening for elevator room. How is condensate drain routed outside the building.(see plan note 6).
c. Condensate from all AHU's shall be disposed to an approved place of disposal per FBC/M 2001 section 307. This applies to all previously submitted comments that I missed.
18. E3:
a. Condensing units(heat pumps) are not clearly identified. (see comment 17a).
19. P5:
a. Domestic water riser for unit C does not match with layout.
20. P6:
a. Coordinate references on risers W/1 & TP/1 with plan notes.
21. Cover sheet:
a. Revise Index of Drawings to match drawing sheets title.
i. AS-1 Architectural site plan is missing in the package.
ii. Clarify A5.3 (not listed but in package) & A5.4 (listed but not in package).
|
|
FI1 |
COMPLETE |
08/29/2005 |
09/23/2005 |
| Note: Released By: JPATTEE
|