| Type |
Request Date |
Result |
Inspector |
|
FINAL COMPLETE BUILDING INSPECTION |
01/08/2007 |
FINAL APPROVED |
JLEVRAULT |
|
ENGINEERING FINAL |
01/03/2007 |
APPROVED |
DMAY |
|
UTILITY COMMERCIAL FINAL |
01/02/2007 |
APPROVED |
DSPENCER |
|
UTILITY COMPANY FINAL |
01/02/2007 |
APPROVED |
TSCHWEERS |
|
LANDSCAPE FINAL |
01/02/2007 |
APPROVED |
WBUTLER |
|
PLUMBING FINAL |
12/20/2006 |
APPROVED |
PGALLMANN |
|
H.V.A.C. FINAL |
12/19/2006 |
APPROVED |
JLEVRAULT |
|
ELECTRICAL FINAL |
12/18/2006 |
APPROVED |
RMARVEL |
|
Note: CALLED FPL ON 12/18/06 MD
|
|
FIRE FINAL |
12/15/2006 |
APPROVED |
JPATTEE |
|
COMMERCIAL POWER INSPECTION |
11/29/2006 |
APPROVED |
LHITES |
|
Note: THIS IS A REINSPECTION
4TH FLOOR EARLY POWER IS OK/CALLED FPL ON 11/29/06
|
|
COMMERCIAL POWER INSPECTION |
11/22/2006 |
CANCELLED BY APPLICANT |
LHITES |
|
THRESHOLD/AFFIDAVIT |
11/14/2006 |
APPROVED |
PPROVIDER |
|
Note: Threshhold Report from Law & Associates
|
|
COMMERCIAL POWER INSPECTION |
11/01/2006 |
APPROVED |
RMARVEL |
|
Note: 3rd floor early power.
|
|
COMMERCIAL POWER INSPECTION |
10/24/2006 |
APPROVED |
LHITES |
|
Note: COMMERCIAL EARLY POWER FOR FLOORS 1 AND 2 IS OK
|
|
INSULATION INSPECTION |
10/24/2006 |
APPROVED - AS NOTED |
JLEVRAULT |
|
Note: FOURTH FLOOR INSULATION APPROVED.
|
|
INSULATION INSPECTION |
10/23/2006 |
Disapproved -FEE REQUIRED |
JHINDMAN |
|
Note:
FIRESTOP ALL CHASES AND DROP CEILINGS
|
|
ALL ROUGH |
10/17/2006 |
APPROVED |
RMARVEL |
|
Note: 4th floor. MECHANICAL AND FRAMING APPROVED FOR FOURTH FLOOR BY JOE LEVRAULT.
|
|
ALL ROUGH |
10/04/2006 |
APPROVED - AS NOTED |
RMARVEL |
|
Note: THIS IS A REINSPECTION fourth floor electric rough approved.
|
|
INSULATION INSPECTION |
09/29/2006 |
APPROVED - AS NOTED |
JLEVRAULT |
|
Note: THIRD FLOOR APPROVED.
|
|
COMMERCIAL POWER INSPECTION |
09/28/2006 |
APPROVED |
RMARVEL |
|
Note: THIS IS A REINSPECTION
|
|
COMMERCIAL POWER INSPECTION |
09/26/2006 |
CANCELLED BY APPLICANT |
RMARVEL |
|
Note: courtney cancelled.
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
09/26/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
MONOLITHIC SLAB INSPECTION/SLAB |
09/26/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
FOOTER |
09/26/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
LINTEL |
09/26/2006 |
Disapproved - NO FEE |
JLEVRAULT |
|
Note: NEED LETTER OF MISSED INSPECTION.
|
|
FIREWALL INSPECTION |
09/21/2006 |
APPROVED |
JPATTEE |
|
SECOND ROUGH PLUMBING INSPECTION |
09/19/2006 |
APPROVED |
PGALLMANN |
|
Note: APPROVED THROUGH ROOF.
|
|
ALL ROUGH |
09/15/2006 |
Disapproved -FEE REQUIRED |
JGIBSON |
|
Note: THIRD FLOOR FRAMING AND MECHANICAL PASSED. Third floor plumbing failed no test on sanitary, riser clamps not installed per manufactures specs, remove ALL DRY-WALL & INSULATION FROM SECOND FLOOR CEILING FOR INSPECTION ON THIRD FLOOR SANITARY TEST.
|
|
INSULATION INSPECTION |
09/06/2006 |
APPROVED - AS NOTED |
JHINDMAN |
|
Note: THIS IS A REINSPECTION 1st @ 2nd floors
|
|
INSULATION INSPECTION |
08/31/2006 |
CANCELLED BY APPLICANT |
JLEVRAULT |
|
Note: CONTRACTOR CANCELLED THE INSPECTION - NOT READY.
|
|
FIREWALL INSPECTION |
08/23/2006 |
APPROVED - AS NOTED |
JPATTEE |
|
Note: 1st 2nd floor penetrations
|
|
ROOF SHEATHING/BRACES/TIES/ DOWN CELL |
08/14/2006 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors report
|
|
ALL ROUGH |
08/11/2006 |
CANCELLED BY APPLICANT |
AIRS WEB |
|
2ND ROUGH ELECTRICAL |
08/01/2006 |
APPROVED |
RMARVEL |
|
Note: THIS IS A REINSPECTION
|
|
SECOND FLOOR SLAB INSPECTION |
07/31/2006 |
APPROVED |
PPROVIDER |
|
Note: Elevator cap slab Threshold inspectors report
|
|
2ND ROUGH ELECTRICAL |
07/28/2006 |
Disapproved -FEE REQUIRED |
RMARVEL |
|
Note: strap EMT where longer than 10ft. recheck spacing of receptacles in kitchen. all unused openings need to be closed. EMT in panels need bushings. nail plates needed in numerous locations.
|
|
ALL ROUGH |
07/26/2006 |
APPROVED - AS NOTED |
JGIBSON |
|
Note: First & second floor plumbing is tested OK. FIRST AND SECOND FRAMING AND MECHANICAL PASSED INSPECTION.(JL)
|
|
LINTEL |
07/26/2006 |
APPROVED |
PPROVIDER |
|
Note: parapit walls, elevator shaft and roof top columns Threshold inspectors report
|
|
FLOOD ZONE 'A' ELEVATION CERTIFICATE APPROVAL |
07/25/2006 |
APPROVED |
CBENTLEY |
|
SECOND FLOOR SLAB INSPECTION |
07/14/2006 |
APPROVED |
PPROVIDER |
|
Note: roof slab Threshold inspectors report
|
|
LINTEL |
07/06/2006 |
APPROVED |
PPROVIDER |
|
Note: 4th floor lintels Threshold inspectors report
|
|
SECOND FLOOR SLAB INSPECTION |
06/22/2006 |
APPROVED |
PPROVIDER |
|
Note: 4th floor slab Threshold inspectors report
|
|
POURED CELL |
06/02/2006 |
APPROVED |
PPROVIDER |
|
Note: 3rd floor filled cels Threshold inspectors report
|
|
SECOND FLOOR SLAB INSPECTION |
05/19/2006 |
APPROVED |
PPROVIDER |
|
Note: 3rd floor slab. Threshold inspectors report
|
|
POURED CELL |
05/08/2006 |
APPROVED |
PPROVIDER |
|
Note: 2nd floor filled cells. Threshold inspectors report
|
|
SECOND FLOOR SLAB INSPECTION |
04/12/2006 |
APPROVED |
PPROVIDER |
|
Note: Threshold inspectors report
|
|
LINTEL |
04/03/2006 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors reeport
|
|
MONOLITHIC SLAB INSPECTION/SLAB |
03/16/2006 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors report.
|
|
FIRST ROUGH PLUMBING INSPECTION |
03/14/2006 |
APPROVED |
TOUTLAND |
|
UNDERGROUND ELECTRICAL |
03/14/2006 |
APPROVED |
TOUTLAND |
|
STEM FOOTING FOUNDATION |
03/07/2006 |
APPROVED |
PPROVIDER |
|
Note: Threshold inspectors report
|
|
STEM FOOTING FOUNDATION |
03/02/2006 |
APPROVED |
PPROVIDER |
|
Note: Threshold inspectors report
|
|
RETAINING WALL FOUNDATION INSPECTION |
02/20/2006 |
APPROVED |
PPROVIDER |
|
Note: Threshold inspectors report.
|
|
FOOTER |
01/27/2006 |
APPROVED |
PPROVIDER |
|
Note: THIS IS A REINSPECTION
Threshold inspectors report.
|
| Department |
Status |
Date In |
Date Out |
|
BLD |
COMPLETE |
08/02/2006 |
08/03/2006 |
| Note: Released By: CCOTE
Approved for Release. Review by Fred R.
Revision: Roof Access tower. |
|
BLD |
COMPLETE |
11/29/2005 |
11/30/2005 |
| Note: Released By: LWOODROME
|
|
BLD |
HOLD |
11/28/2005 |
11/28/2005 |
| Note: Held By: FREODICA
1. Drawing sheets A7.9.1 & A7.9.2 (mechanical roof plan) are missing in the submitted plan review comments response package. |
|
BLD |
HOLD |
09/21/2005 |
10/13/2005 |
| Note: Held By: FREODICA
CITY OF PALM COAST BUILDING DIVISION
Comments on Permit Application No. 2005080975 (Building No. 19)
1. Provide product approval number for exterior doors and garage doors. FYI: Complete product approval packets, for components and cladding, must be available, at the job site, at the time of inspection.
2. Provide details of guardrails, at balconies, that meet the requirements of FBC 1015.
3. Provide more information on details of balcony screen enclosure showing sizes, spacing and method of attachment.
4. Provide roofing application instructions per FBC 1507.4.1.2.
5. Clarify roof sheathing thickness. (Drawing A3.1C references 5/8" while S-6 references ½")
6. Provide signs or stencils, which read, "FIRE AND SMOKE BARRIER PROTECT ALL OPENINGS" on all walls of rated construction and draftstop partitions, above decorative ceilings, in attic spaces and in other concealed spaces, per FBC704.2.1.4.
7. Provide electrical disconnect(s) for condensing unit and water heater, unless within sight and 50' of originating panel. See Unit D on E4.
8. Provide GFCI protection for receptacle outlet(s) at Dining Room side of bar, typical for all units.
9. Provide listed lighting fixtures in damp or wet locations.
10. Provide (3) copies of revised energy calculations, which are specific to each typical unit.
a. The following items were noted, revise accordingly. The packets submitted do not reference the correct "Climate Zone (North), "Permitting Office" (Palm Coast) and Jurisdiction Number (281400).
b. The floor areas square footages listed do not match the floor plans.
11. On Roof Mechanical Plan (M7), exhaust fan/dryer vents penetrate through the roof while typical HVAC layout & structural roof framing plan (S-5) show wall penetrations. Please clarify.
12. On M3, clarify dryer vent equivalent length, 50 ft or 60 ft? Please add note to provide signs or stencils, which read, "Dryer shall be capable of venting through 60 equivalent ft." on wall close to dryer.
13. Equipment access through roof, 36x36 scuttle (A3.1C) does not show on structural roof framing plan (S-5). Provide structural section/detail and means of access.
14. On sanitary riser diagrams, show how vent system is connected from 1st floor to 4th floor
to outside the building.
15. E5, clarify key note #5, is disconnect switch on heat pump D same for both DL/DT?
16. P9:
a. One (1) bathroom group is missing on domestic water riser for Unit A.
b. One (1) water closet & (1) lavatory are missing on water riser for Unit D.
17. P10:
a. Sanitary risers S/2 & S/3 for Unit A are interchanged.
b. Sanitary risers S/7 (WC-1) & S/3 should be S/5 & S/6 respectively.
18. P6 & P7:
a. Clarify sanitary risers for Unit C. (All are S/5).
b. Sanitary riser S/11 for Unit D is missing (P6 only).
19. A1.1S, A1.2S, A1.3S, A5.2 & A7.3:
a. Stair tread and riser height shall meet code.
20. A2.1:
a. Referenced 5/A4.2 does not match elevation (flipped windows).
b. Referenced 6/A7.1 is missing.
21. A2.2 & A2.3, referenced section 6/A7.1 is missing.
22. A4.1, referenced detail 7/A7.1 is missing.
23. A7.5.1:
a. Detail 7- Tenant Separation @ Top Floor on A
i. Clarify referenced detail 2/A7.5
ii. Clarify referenced sheet A7.7
24. M1 to M7:
a. Coordinate all Plan key notes references to match referenced details/sheets, delete or cross out them out if not applicable to the project.
25. Cover sheet:
a. S-3 & S-4 drawing sheets title do not match with index of drawings.
b. AS- 1 is in the package but not listed on index of drawings.
|
|
FI1 |
COMPLETE |
08/29/2005 |
09/19/2005 |
| Note: Released By: JPATTEE
|