Permit #2005081037

Permit Details

Status: COED

Parcel Id: 15-11-31-2832-00000-0110
CONDITIONED SPACE: 2882 sqft
GARAGE: 549 sqft
OPENED PORCH (WITH ROOF) : 277 sqft
OPENED PORCH (WITH ROOF) : 95 sqft
Total Square Footage: 3803 sqft
Block: 0000
Subdivision: 1072 - FRONT STREET @ GRAND HAVEN PH2
Job Phone: (386) 445-4408
Location Address: 72 LAGARE ST
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/29/2005
NOC: RECORDED
Applicant name: PATRICK E KOLLAR
Owner: MALONE ROBERT M JR &

Address

SANDRA B H&W

LAWRENCE, KS 66047

Lot: 0110
Contracted Stated Job Value: ¤398,500.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

RED CARPET CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
ACTIVE

8A Market Place Court

Palm Coast, FL 32137

CRC017457 (Exp: 08/31/2026) (386) 445-4408 (386)446-2232

Sub Contractors

GEOFRRY DEFOREST
Status Location Address State License Number Phone Fax
CANCEL

411 6TH STREET

HOLLY HILL, FL 32117

01612 (Exp: 08/31/2010) (386)252-5555 (386)255-6657

Inspection History

Type Request Date Result Inspector
FINAL COMPLETE BUILDING INSPECTION 02/15/2007 FINAL APPROVED JGIBSON
UTILITY COMPANY FINAL 02/01/2007 Disapproved - NO FEE TSCHWEERS
Note: FAILED, BUILDER PUT IN 6" CLEAN OUT BUT HOUSE SERVICE TIED INTO 6" STACK THIS IS A REINSPECTION FRANCINE CALLED TO SCHEDULE A STORMWATER AND UTILITY FINAL
STORMWATER FINAL INSPECTION 02/01/2007 APPROVED DRANDALL
Note: THIS IS A REINSPECTION
UTILITY COMPANY FINAL 01/18/2007 APPROVED RZALESKI
Note: PER MARK GIBSON A CITY INSPECTOR HE SAW THE PLUMBER FIX THE PROBLEM FAILED, GRAVITY FAILED THEY ONLY HAVE 4" CLEAN OUT
STORMWATER FINAL INSPECTION 01/18/2007 Disapproved -FEE REQUIRED DRANDALL
Note: seed & straw all exposed earth on left & right rear adj. property.....remove all pavers from left adj. property.....grade down sand piles befour seed & straw.....remove silt fence right rear natural area & seed and straw same area
RESIDENTIAL EARLY POWER 12/19/2006 APPROVED JGIBSON
INSULATION INSPECTION 07/26/2006 APPROVED JMCGOWEN
ALL ROUGH 07/13/2006 APPROVED JGIBSON
LATH /BRICK FLASHING 07/06/2006 APPROVED RMARVEL
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 04/17/2006 APPROVED JMCGOWEN
Note: THIS IS A REINSPECTION
ROOF SHEATHING/BRACES/TIES/ DOWN CELL 03/21/2006 Disapproved -FEE REQUIRED JMCGOWEN
Note: need to have correct fasteners.plans calls for META18 also calls for HGT22s each side of girders. need detail on all non ballon framed bearing walls. joist need HTS straps.need truss joist manufacturing installation recommendation. need wood wall to block wall conection. not ready incomplete list.
TEMPORARY POLE 01/18/2006 APPROVED JMCGOWEN
Note: FPL CALLED IN ON 1/18/06
LINTEL 12/29/2005 APPROVED JMCGOWEN
MONOLITHIC SLAB INSPECTION/SLAB 12/14/2005 APPROVED JGIBSON
FIRST ROUGH PLUMBING INSPECTION 12/06/2005 APPROVED JMCGOWEN

Review History

Department Status Date In Date Out
BLD COMPLETE 05/16/2006 05/16/2006
Note: Released By: LWOODROME Revision: Truss repair
BLD COMPLETE 04/10/2006 04/12/2006
Note: Released By: CCOTE Approved for Release. Revision: Revised connector schedule, added balloon from detail and frame to block connection.
BLD REJECT 03/02/2006 03/07/2006
Note: Rejected By: CCOTE "Or equal" is not sufficient. Need to submit items to be considered as equals.
BLD COMPLETE 02/06/2006 02/08/2006
Note: Released By: LWOODROME Revision: Truss repair
DSD CANCEL 01/04/2006
BLD COMPLETE 09/20/2005 09/21/2005
Note: Released By: CCOTE Approved for Release per plan cover sheet.
URB COMPLETE 09/19/2005 09/19/2005
Note: Released By: CGOEWEY
BLD HOLD 09/19/2005 09/19/2005
Note: Held By: CCOTE The following items must be submitted in order to complete the Building Permit Application plan review. 1. The floor area on the energy calculations do not match those shown on the floor plan. Revise floor plan calc's and/or energy calc's as required. 2. Identify specific anchor to be used to connect interior bearing walls to slab. In addition, the foundation plan and interior bearing wall section give different spacings for these anchors. Also there are two interior bearing wall sections that have conflicting notes; please revise. 3. The drawings contain shear wall and hold down detail. Please identify where these are to be used. 4. The drawings show a fireplace. Indicate the fireplace type (gas, electric, wood) as well as how it will be vented (if required). If vented through the roof a chimney detail will be needed as well as revised elevations showing the chimney. If the fireplace is gas a gas riser diagram is required indicating pipe material(s), lengths, and equipment BTU's. 5. Drawing A-8 framing plans show asterisk(s) (*) after several trusses however there is no explanation on the drawing as to what they are for. Please clarify. 6. It appears that the Family Room and Foyer will have a 21'4" tall exterior cmu wall. Please clarify how this wall is to be reinforced to address the proposed unbraced height. 7. Drawing S2 has a lintel table however there are 16 lintel options for each opening width. Please provide the type designation (size and reinforcing at the top & bottom) to be used at all masonry openings. There appears to be some girder trusses, lintels and girder floor trusses that bear over openings in masonry walls. Please verify that the lintel size to be provided is adequate to support the loads. 8. Drawing S1 shows header sizes for openings in wood framed walls. Please clarify that no ties/fasteners/connectors are required since none are indicated on the detail. It appears that there may be some girders trusses that will bear on the wall over an opening. Please verify that the header size is adequate to support the loads.
SWMD COMPLETE 08/29/2005 09/16/2005
Note: Released By: LAPTEKAR
ZON COMPLETE 08/29/2005 09/06/2005
Note: Released By: HHERKERT

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EARLY POWER INSPECTION ¤40.00 02/15/2007
REINSPECTION FEE ¤40.00 02/15/2007
REVISION ¤40.00 02/15/2007
REVISION ¤40.00 02/15/2007
REVISION ¤40.00 02/15/2007
STORMWATER REINSPECTION FEE ¤35.00 02/15/2007
TRANSPORTATION IMPACT FEE3/RES ¤2,885.00 09/29/2005
ADMIN FEE ¤20.00 09/29/2005
BUILDING CODE ADMIN FUND ¤19.02 09/29/2005
ELECTRIC FEE ¤269.40 09/29/2005
SCHOOL BOARD IMPACT FEE RES ¤3,600.00 09/29/2005
STORM WATER PERMIT FEES ¤80.00 09/29/2005
FIRE RES IMPACT FEE 4-1-05 ¤173.47 09/29/2005
MECHANICAL FEE ¤269.40 09/29/2005
PERMIT FEE ¤1,556.10 09/29/2005
PARKS IMPACT FEE 11-2-04 ¤1,120.91 09/29/2005
PLAN CHECK FEE ¤159.60 09/29/2005
PLUMBING FEE ¤269.40 09/29/2005
RADON FEE ¤19.02 09/29/2005
Fees Total Due: ¤0.00 Total Paid: ¤10,676.32