I want to search for...
Permit #2005090233
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00610-0100 |
| CONDITIONED SPACE: 2630 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 150 sqft |
| OPENED PORCH (WITH ROOF) : 35 sqft |
| Total Square Footage: 3249 sqft |
| Block: 0061 |
| Subdivision: - |
| Job Phone: (386) 445-4515 |
| Location Address: 4 BURGUNDY PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/21/2005 |
| NOC: RECORDED |
| Applicant name: GREGORY LEE LE PERA |
| Owner: CENTEX HOMES, A NEVADA GENERAL PARTNERSHIP |
|
Address D/B/A WAYNE HOMES BY CENTEX PALM COAST, FL 32137 |
|
Address 1 OLD KINGS ROAD PALM COAST, FL 32137 |
| Lot: 100 |
| Contracted Stated Job Value: ¤105,200.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
WAYNE HOMES BY CENTEX
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| CANCEL |
385 DOUGLAS AVE ALTAMONTE SPRINGS, FL 32714 |
STE 3000 ALTAMONTE SPRINGS, FL 32714 |
CBC055301 (Exp: 09/30/2008) | (386) 445-4515 | (386)446-6285 |
Sub Contractors
JOHN FREDERICK WANERKA
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
PO BOX 350214 BUNNELL, FL 32135 |
EC0000585 (Exp: 08/31/2022) | 386-446-9626 | 386-445-3131 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 05/10/2006 | FINAL APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 05/01/2006 | CANCELLED BY APPLICANT | JLEVRAULT |
| RESIDENTIAL EARLY POWER | 04/19/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| RESIDENTIAL EARLY POWER | 03/28/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: NOT READY. PANEL NOT DONE, INSIDE HOUSE NOT DONE. | |||
| STORMWATER FINAL INSPECTION | 03/27/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: Have public works regrade swale at left property line to ease flow | |||
| UTILITY COMPANY FINAL | 03/24/2006 | APPROVED | RANDRADE |
| PRE DRIVEWAY | 03/09/2006 | APPROVED | BFCHAMBERLAIN |
| PRE DRIVEWAY | 03/08/2006 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: already passed | |||
| LATH /BRICK FLASHING | 02/27/2006 | APPROVED | ARITTER |
| INSULATION INSPECTION | 02/21/2006 | CANCELLED BY APPLICANT | JGONZALEZ |
| INSULATION INSPECTION | 02/16/2006 | APPROVED | MMOORE |
| ALL ROUGH | 02/14/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 01/27/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. GROUT UNDER SHOWER AND ONE TUB 2. PANEL NOT WIRED 3. GARAGE EXTERIOR LIGHT WIRING/GROUNDING | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/13/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION..1. ENTRY AND BED ROOM # 4 GABLE/ NAIL FROM OUTSIDE WITH 16D , 12" O.C. 2. COMPLETE BY ALL-ROUGH 3. APPROVED AS NOTED | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/11/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION no stamped set of plans | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 12/30/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. GABLE AT GARAGE STRAPS BENT 1 1/2" UNDER / ONE BROKEN-OFF/ TAPCON NEW STRAPS 2. 2-PLY GARAGE / NAIL TOGETHER PER TRUSS PACKAGE NAIL PATTERN 3. GROUT TRUSSES 4. CANNOT CONTINUE INSPECTION: A. NO STAMPED PLANS B. REVERSED TRUSS PACKAGE/ PLANS | |||
| LINTEL | 11/08/2005 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 10/11/2005 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 10/05/2005 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 10/04/2005 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: No pressure on DWV. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/19/2005 | 09/19/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| SWMD | COMPLETE | 09/12/2005 | 09/16/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 09/12/2005 | 09/12/2005 |
| Note: Held By: HHERKERT hold for ARC meeting 9-16-05 | |||
| ZON | COMPLETE | 09/12/2005 | 09/19/2005 |
| Note: Released By: HHERKERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 05/04/2006 |
| EARLY POWER INSPECTION | ¤40.00 | 05/04/2006 |
| REINSPECTION FEE | ¤40.00 | 05/04/2006 |
| REINSPECTION FEE | ¤40.00 | 05/04/2006 |
| REINSPECTION FEE | ¤40.00 | 05/04/2006 |
| REINSPECTION FEE | ¤40.00 | 05/04/2006 |
| REINSPECTION FEE | ¤40.00 | 05/04/2006 |
| REINSPECTION FEE | ¤40.00 | 05/04/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 09/21/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 09/21/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 09/21/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 09/21/2005 |
| MECHANICAL FEE | ¤149.40 | 09/21/2005 |
| PERMIT FEE | ¤776.10 | 09/21/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 09/21/2005 |
| PLAN CHECK FEE | ¤79.60 | 09/21/2005 |
| PLUMBING FEE | ¤149.40 | 09/21/2005 |
| RADON FEE | ¤16.25 | 09/21/2005 |
| ADMIN FEE | ¤20.00 | 09/21/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 09/21/2005 |
| BUILDING CODE ADMIN FUND | ¤16.25 | 09/21/2005 |
| ELECTRIC FEE | ¤149.40 | 09/21/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,660.78 |