I want to search for...
Permit #2005090345
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01160-0070 |
| CONDITIONED SPACE: 2051 sqft |
| GARAGE: 532 sqft |
| OPENED PORCH (WITH ROOF) : 416 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| Total Square Footage: 3130 sqft |
| Block: 0116 |
| Subdivision: - |
| Job Phone: (386)447-8680 |
| Location Address: 30 BISCAY LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/18/2005 |
| NOC: RECORDED |
| Applicant name: MICHAEL LEO BRANIFF |
| Owner: RIVER CITY HOMES & DEVELOPMENT CORP. |
|
Address 145 CYPRESS POINT PKWY PALM COAST, FL 32164 |
| Lot: 070 |
| Contracted Stated Job Value: ¤147,400.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
RIVER CITY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
12058 SAN JOSE BLVD #804 Jacksonville, FL 32223 |
CGC062728 (Exp: 08/31/2012) | 904-260-9009 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 06/30/2006 | FINAL APPROVED | MMOORE |
| UTILITY COMPANY FINAL | 06/27/2006 | APPROVED | TSCHWEERS |
| ENGINEERING FINAL | 06/27/2006 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: already passed stormwater final 6/26 | |||
| STORMWATER FINAL INSPECTION | 06/23/2006 | APPROVED | BFCHAMBERLAIN |
| UTILITY COMPANY FINAL | 06/22/2006 | APPROVED | TSCHWEERS |
| INSULATION INSPECTION | 04/06/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 04/04/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: need energy sheets on job for inspection | |||
| ALL ROUGH | 03/30/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 03/28/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: THIS IS A REINSPECTION NO PRESSURE ON WATER LINES. | |||
| DRIVEWAY | 03/27/2006 | APPROVED | BFCHAMBERLAIN |
| ALL ROUGH | 03/24/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION 1. 2ND TIME/ MISSING CLAMP AT GROUND ROD AT METER | |||
| ALL ROUGH | 03/22/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: ONLY ONE GROUND ROD CONNECTED AT METER | |||
| LATH /BRICK FLASHING | 03/08/2006 | APPROVED | JGIBSON |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/14/2006 | APPROVED | ARITTER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/08/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: FILL CELL IN REAR. FRONT ENTRANCE ARCH FRAME NAILED INTO OSB ONLY AT ONE CONNECTION. FRONT ENTRANCE TRUSS STRAP NAILED INTO OSB ONLY. GABLE END STRAPS NAILED INTO OSB ONLY. ADD STUD IN GARAGE UNDER TRUSS MARKED WITH AN X. CONTINUOUS LOAD PATH NOT COMPLETE AT 2-PLY IN GARAGE. MISSING BOLT AT LEDGER ABOVE WINDOW IN REAR ON RIGHT END. COULD NOT INSPECT MASTER BED TRUSS TO LINTEL CONNECTION - REMOVE OSB AT THIS POINT. | |||
| LINTEL | 01/12/2006 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 12/30/2005 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 12/21/2005 | APPROVED | JLEVRAULT |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/26/2005 | 09/26/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| SWMD | COMPLETE | 09/20/2005 | 10/14/2005 |
| Note: Released By: LAPTEKAR site plan shows driveway flair from intersection 45'....street is not a major thoroughfare. | |||
| BLD | HOLD | 09/20/2005 | 09/22/2005 |
| Note: Held By: CCOTE Missing Energy Calculation Packets. Notified River City by phone on 9/22/05. | |||
| SWMD | HOLD | 09/14/2005 | 09/20/2005 |
| Note: Held By: LAPTEKAR Need the distance of the driveway flair from the intersection.....this is a corner lot. | |||
| ZON | COMPLETE | 09/14/2005 | 09/20/2005 |
| Note: Released By: HHERKERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/30/2006 |
| REINSPECTION FEE | ¤40.00 | 06/30/2006 |
| REINSPECTION FEE | ¤40.00 | 06/30/2006 |
| REINSPECTION FEE | ¤40.00 | 06/30/2006 |
| REINSPECTION FEE | ¤40.00 | 06/30/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 10/18/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/18/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 10/18/2005 |
| ADMIN FEE | ¤20.00 | 10/18/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 10/18/2005 |
| BUILDING CODE ADMIN FUND | ¤15.65 | 10/18/2005 |
| ELECTRIC FEE | ¤131.40 | 10/18/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 10/18/2005 |
| MECHANICAL FEE | ¤131.40 | 10/18/2005 |
| PERMIT FEE | ¤659.10 | 10/18/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 10/18/2005 |
| PLAN CHECK FEE | ¤67.60 | 10/18/2005 |
| PLUMBING FEE | ¤131.40 | 10/18/2005 |
| RADON FEE | ¤15.65 | 10/18/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,356.58 |