I want to search for...
Permit #2005090346
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00120-0040 |
| CONDITIONED SPACE: 2737 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 205 sqft |
| OPENED PORCH (WITH ROOF) : 45 sqft |
| OPENED PORCH (WITH ROOF) : 95 sqft |
| Total Square Footage: 3537 sqft |
| Block: 0012 |
| Subdivision: - |
| Job Phone: (386)447-8680 |
| Location Address: 2 WEST PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/07/2005 |
| NOC: RECORDED |
| Applicant name: MICHAEL LEO BRANIFF |
| Owner: REVICH, LEONORA |
|
Address 2153 CROPSEY AVENUE APT #2B BROOKLYN, NY 11214 |
| Lot: 040 |
| Contracted Stated Job Value: ¤147,400.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
RIVER CITY HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
12058 SAN JOSE BLVD #804 Jacksonville, FL 32223 |
CGC062728 (Exp: 08/31/2012) | 904-260-9009 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 07/07/2006 | FINAL APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 07/06/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: SMOKE DETECTOR NOT LOCATED PER PLAN IN HALLWAY BETWEEN BEDROOMS ON LEFT SIDE. HILITED ON PLAN. | |||
| UTILITY COMPANY FINAL | 06/29/2006 | APPROVED | TSCHWEERS |
| Note: THIS IS A REINSPECTION | |||
| STORMWATER FINAL INSPECTION | 06/27/2006 | APPROVED | BFCHAMBERLAIN |
| UTILITY COMPANY FINAL | 06/22/2006 | Disapproved - NO FEE | TSCHWEERS |
| Note: FAILED, GRAVITY SEWER CLEAN OUT NOT WITHIN PROPERTY LINE | |||
| DRIVEWAY | 05/23/2006 | APPROVED | BFCHAMBERLAIN |
| LATH /BRICK FLASHING | 04/21/2006 | APPROVED | PGALLMANN |
| INSULATION INSPECTION | 04/18/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| INSULATION INSPECTION | 04/12/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: NO ENERGY CALCS. IN BOX.NO INSPECTION | |||
| ALL ROUGH | 04/06/2006 | APPROVED | PGALLMANN |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/24/2006 | APPROVED | JLEVRAULT |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/23/2006 | CANCELLED BY APPLICANT | JLEVRAULT |
| LINTEL | 02/15/2006 | APPROVED | JLEVRAULT |
| MONOLITHIC SLAB INSPECTION/SLAB | 01/31/2006 | APPROVED | ARITTER |
| MONOLITHIC SLAB INSPECTION/SLAB | 01/30/2006 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: MISSING TWO DOWEL RODS - HILIGHTED ON PLANS. | |||
| FIRST ROUGH PLUMBING INSPECTION | 01/26/2006 | APPROVED | ARITTER |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 01/25/2006 | Disapproved -FEE REQUIRED | ARITTER |
| Note: Water pipe crossings must be padded with Armaflex or similar material. Note: FPC 305.3. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/10/2005 | 11/14/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| BLD | HOLD | 10/07/2005 | 10/15/2005 |
| Note: Held By: CCOTE The following items must be submitted in order to complete the Building Permit Application plan review. 1. Please provide revised energy efficiency code packets that correlate with floor area and other items shown on the drawings. | |||
| ZON | COMPLETE | 09/28/2005 | 10/07/2005 |
| Note: Released By: DCHAUDOIN | |||
| ZON | HOLD | 09/23/2005 | 09/28/2005 |
| Note: Held By: HHERKERT hold for ARC meeting 9-30-05 | |||
| SWMD | COMPLETE | 09/14/2005 | 09/19/2005 |
| Note: Released By: WKINELL | |||
| ZON | HOLD | 09/14/2005 | 09/23/2005 |
| Note: Held By: DCHAUDOIN NEED SEALED BOUNDARY SURVEY AND INCLUDE LOT AREA |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/07/2006 |
| REINSPECTION FEE | ¤40.00 | 07/07/2006 |
| REINSPECTION FEE | ¤40.00 | 07/07/2006 |
| REINSPECTION FEE | ¤40.00 | 07/07/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 12/07/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/07/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 12/07/2005 |
| ADMIN FEE | ¤20.00 | 12/07/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 12/07/2005 |
| BUILDING CODE ADMIN FUND | ¤17.69 | 12/07/2005 |
| ELECTRIC FEE | ¤155.40 | 12/07/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 12/07/2005 |
| MECHANICAL FEE | ¤155.40 | 12/07/2005 |
| PERMIT FEE | ¤815.10 | 12/07/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 12/07/2005 |
| PLAN CHECK FEE | ¤83.60 | 12/07/2005 |
| PLUMBING FEE | ¤155.40 | 12/07/2005 |
| RADON FEE | ¤17.69 | 12/07/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,564.66 |