I want to search for...
Permit #2005090605
Permit Details
Status: COED
| Parcel Id: 07-11-31-7012-00120-0090 |
| CONDITIONED SPACE: 2210 sqft |
| GARAGE: 657 sqft |
| OPENED PORCH (WITH ROOF) : 454 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 3401 sqft |
| Block: 0012 |
| Subdivision: - |
| Job Phone: (386)447-0818 |
| Location Address: 17 BALLARD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/18/2005 |
| NOC: RECORDED |
| Applicant name: GREGORY ALLAN NELSON |
| Owner: ROBERT AND VICKI MCDONALD |
|
Address 12567 WILLIAMSBURG AVE., NW UNIONTOWN, OH 44685 |
| Lot: 090 |
| Contracted Stated Job Value: ¤210,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
HERITAGE HOMES OF PALM COAST INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
12 PRINCESS KIM LANE PALM COAST, FL 32137 |
CBC1251716 (Exp: 09/30/2008) | (386)447-0818 | (386)447-0359 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 07/17/2006 | FINAL APPROVED | MMOORE |
| FINAL COMPLETE BUILDING INSPECTION | 07/14/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: not ready for inspection/ not complete | |||
| ENGINEERING FINAL | 07/13/2006 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: THIS INSPECTION IS A DUPLICATE OF THE STORMWATER INSPECTION | |||
| STORMWATER FINAL INSPECTION | 07/13/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: THIS IS A REINSPECTION 64 sq.ft. of rd damage $612 has been checked by Brian. has been repaired.//kj | |||
| ENGINEERING FINAL | 07/11/2006 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: no approved final surveys on file...this inspection cannot be scheduled | |||
| STORMWATER FINAL INSPECTION | 07/11/2006 | CANCELLED BY INSPECTOR | LAPTEKAR |
| Note: this inspection cannot be sceduled...no final surveys on file | |||
| STORMWATER FINAL INSPECTION | 07/11/2006 | Disapproved -FEE REQUIRED | DRANDALL |
| Note: remove dumpster regrade sod across street remove silt fence from left swale cleanout culvert ends | |||
| UTILITY COMPANY FINAL | 07/10/2006 | APPROVED | TSCHWEERS |
| UTILITY COMPANY FINAL | 07/06/2006 | APPROVED | CBOEHME |
| RESIDENTIAL EARLY POWER | 07/06/2006 | APPROVED | MMOORE |
| PRE DRIVEWAY | 06/09/2006 | APPROVED | BFCHAMBERLAIN |
| INSULATION INSPECTION | 04/24/2006 | APPROVED | MMOORE |
| LATH /BRICK FLASHING | 04/19/2006 | APPROVED | MMOORE |
| ALL ROUGH | 04/11/2006 | APPROVED | MMOORE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 02/03/2006 | APPROVED | DMAY |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/31/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: NOT COMPLETE FROM NON-COMPLIANCE OF 1-24-06 9:00 A.M. | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 01/24/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. HEADER STRAPS TO BE VERTICAL/ SEE DETAIL "FRAME WALL OPENING"/ LAST PAGE OF PLANS 2. DEN OPENING FRAMING/ BOLT EACH SIDE AT PLATE 3. UPLIFT 2-PLY AT DEN BOTH ENDS INCLUDING HEADER AT DOOR TO 2-PLY 4. AT 2-PLY DEN DOUBLE 2X4 AT RIGHT NAIL TOGETHER/ BOTTOM/ TOP ANCHORAGE 5. VAPOR BARRIER UNDER ALL TRUSSES (REAR WALL WITH DOORS) 6. GDRO1 CHECK UPLIFT/ BOTH ENDS 7. GARAGE DOOR OPENING LEFT BOTTM/ BOLT PLATE | |||
| LINTEL | 12/28/2005 | APPROVED | MMOORE |
| LINTEL | 12/27/2005 | Disapproved -FEE REQUIRED | MMOORE |
| Note: Missing Dowels: One @ right wall; One at right side of front entry; One @ each rear column (2). | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 11/30/2005 | APPROVED | MMOORE |
| FIRST ROUGH PLUMBING INSPECTION | 11/29/2005 | APPROVED | JGIBSON |
| FIRST ROUGH PLUMBING INSPECTION | 11/28/2005 | Disapproved -FEE REQUIRED | JLEVRAULT |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/05/2005 | 10/13/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. | |||
| ZON | COMPLETE | 09/23/2005 | 10/05/2005 |
| Note: Released By: DCHAUDOIN | |||
| SWMD | COMPLETE | 09/22/2005 | 09/23/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 09/22/2005 | 09/23/2005 |
| Note: Held By: DCHAUDOIN Need landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EARLY POWER INSPECTION | ¤40.00 | 07/17/2006 |
| REINSPECTION FEE | ¤40.00 | 07/17/2006 |
| REINSPECTION FEE | ¤40.00 | 07/17/2006 |
| REINSPECTION FEE | ¤40.00 | 07/17/2006 |
| REINSPECTION FEE | ¤40.00 | 07/17/2006 |
| REINSPECTION FEE | ¤40.00 | 07/17/2006 |
| REINSPECTION FEE | ¤40.00 | 07/17/2006 |
| STORMWATER REINSPECTION FEE | ¤35.00 | 07/17/2006 |
| TRANS IMPACT FEE 4 - PER UNIT | ¤3,248.51 | 10/18/2005 |
| ADMIN FEE | ¤20.00 | 10/18/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 10/18/2005 |
| BUILDING CODE ADMIN FUND | ¤17.01 | 10/18/2005 |
| ELECTRIC FEE | ¤156.00 | 10/18/2005 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 10/18/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/18/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 10/18/2005 |
| MECHANICAL FEE | ¤156.00 | 10/18/2005 |
| PERMIT FEE | ¤819.00 | 10/18/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 10/18/2005 |
| PLAN CHECK FEE | ¤84.00 | 10/18/2005 |
| PLUMBING FEE | ¤156.00 | 10/18/2005 |
| RADON FEE | ¤17.01 | 10/18/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,087.91 |