Permit #2005090649
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00740-0010 |
| CONDITIONED SPACE: 2256 sqft |
| GARAGE: 567 sqft |
| OPENED PORCH (WITH ROOF) : 327 sqft |
| OPENED PORCH (WITH ROOF) : 123 sqft |
| Total Square Footage: 3273 sqft |
| Block: 0074 |
| Subdivision: - |
| Job Phone: (386)447-4400 |
| Location Address: 130 LARAMIE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/04/2005 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: GRONCZEWSKI ADAM E |
|
Address PATRICIA A GRONCZEWSKI BRICK, NJ 08724 |
| Lot: 010 |
| Contracted Stated Job Value: ¤230,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
THE WATERSIDE GROUP, INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
17-B BRELYN PLACE PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2010) | (386)447-4400 | (386)447-5800 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL COMPLETE BUILDING INSPECTION | 09/13/2006 | FINAL APPROVED | PGALLMANN |
| Note: THIS IS A REINSPECTION | |||
| FINAL COMPLETE BUILDING INSPECTION | 09/11/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. SEAL PLENUM AT PIPING 2. SEAL BACKWALL AT PLENUM AT BOTTOM 3. SEAL DUCT AT TOP OF UNIT (ELECTRIC/ REFRIGERANT), AT CEILING 4. SEAL WATER HEATER OUTLET ALSO LOW VOLTAGE AT CEILING 5. SEAL OVEN OUTLER 6. SEAL OUTLET/ EXTERIOR AT AQUALINK 7. 90 DEGREE ELBOW REQUIRED AT END OF CONDENSATE LINE POINTING DOWNWARD 8. CONDUIT BELOW METER ATTACH TO WALL 9. CONDUIT AT IRRIGATION CONTROL/ ATTACH TO WALL ALSO OUTSIDE CONDUIT | |||
| STORMWATER FINAL INSPECTION | 09/05/2006 | APPROVED | DRANDALL |
| UTILITY COMPANY FINAL | 08/31/2006 | APPROVED | TSCHWEERS |
| DRIVEWAY | 05/31/2006 | APPROVED - AS NOTED | BFCHAMBERLAIN |
| Note: Replace silt fence by ditch | |||
| LATH /BRICK FLASHING | 04/19/2006 | APPROVED | MMOORE |
| INSULATION INSPECTION | 04/11/2006 | APPROVED | MMOORE |
| ALL ROUGH | 04/07/2006 | APPROVED | MMOORE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/05/2006 | APPROVED | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/04/2006 | CANCELLED BY APPLICANT | MMOORE |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 04/03/2006 | CANCELLED BY APPLICANT | MMOORE |
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/30/2006 | CANCELLED BY INSPECTOR | MMOORE |
| Note: NOW THAT THE G IS OPEN AROUND THE COLUMNS REFER TO PAGE 1 0F 6 (IN YELLOW) 2. THERE APPEARS TO BE 2 LAYERS OF 2X4 WRAPPED AROUND COLUMN AND MORE THAN LIKELY THE INNER 2X4 IS PRESSURE TREATED AND TAPCONNED, . THIS IS HOW TO STABALIZE THE BOTTOM OF THE COLUMN FRAMING 3. ALL FRAMING INSIDE THE COLUMN BOXES TO BE P.T. OR HAVE A PIECE OF FELT PAPER IN BETWEEN NON P.T. AND CONCRETE | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/28/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: THIS IS A REINSPECTION 1. over frame at windows not tapconned to concrete columns or concrete block ( 12" o.c.) 2. as per non-compliance item # 2 dated 3/23/06 not completed | |||
| ROOF SHEATHING/BRACES/TIES/ DOWN CELL | 03/23/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. ALL FRAMING OUTSIDE OF WINDOWS, AROUND ARCHES, COLUMNS TO BE TAPCONNED AT 12" O.C. INCLUDING PLYWOOD AGAINST CONCRETE BLOCK. 2. REMOVE FELT PAPER / APPLY TAPCONS AND LEAVE OPEN FOR INSPECTION | |||
| LINTEL | 02/20/2006 | APPROVED | MMOORE |
| LINTEL | 02/17/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: 1. BACK WALLS WITH 4" OF BLOCK ON TOP OF LINTEL HEADERS DO NOT HAVE REBAR RUNNING THROUGH 2. NEED CHANGE/ REVISION | |||
| MONOLITHIC SLAB INSPECTION/SLAB | 01/06/2006 | APPROVED | MMOORE |
| MONOLITHIC SLAB INSPECTION/SLAB | 01/05/2006 | Disapproved -FEE REQUIRED | MMOORE |
| Note: SLEEVE 4 COPPER LINES AT M.BATH AT REBAR, 2 AT LAUNDRY AREA | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/30/2005 | APPROVED | JMCGOWEN |
| Note: THIS IS A REINSPECTION | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/27/2005 | Disapproved -FEE REQUIRED | JLEVRAULT |
| Note: Not ready | |||
| FIRST ROUGH PLUMBING INSPECTION | 12/22/2005 | CANCELLED BY INSPECTOR | JMCGOWEN |
| TEMPORARY POLE | 12/12/2005 | APPROVED | JLEVRAULT |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 03/16/2006 | 03/20/2006 |
| Note: Released By: LWOODROME Revision: Truss bearing points and truss profiles | |||
| ZON | COMPLETE | 02/10/2006 | 02/14/2006 |
| Note: Released By: HHERKERT | |||
| BLD | COMPLETE | 11/01/2005 | 11/01/2005 |
| Note: Released By: CCOTE Approved for Release per plan cover sheet. Review by Fred R> | |||
| URB | COMPLETE | 10/20/2005 | 10/20/2005 |
| Note: Released By: CGOEWEY | |||
| BLD | HOLD | 10/03/2005 | 10/10/2005 |
| Note: Held By: FREODICA 1. Provide lintel schedule showing specific type for each window/door, garage door & covered porch openings. 2. Provide spacing of downcells and its maximum limit. 3. Revise foundation plan or detail 5/3 to match dimensions (step section ). 4. Indicate thickness, grade & fastener type size and spacing of wall sheating shown in detail 11/6 (gable end section) 5. Indicate tapcon size and spacing to be used to secure wood framing to masonry at arch window over entry doors. 6. Provide framing detail for entry archway. Indicate framing size and attachment information. | |||
| SWMD | COMPLETE | 09/22/2005 | 09/23/2005 |
| Note: Released By: LAPTEKAR | |||
| ZON | HOLD | 09/22/2005 | 10/03/2005 |
| Note: Held By: HHERKERT need correct landscape plan, landscape plan submitted has front entry garage, house placement on site plan has side entry garage | |||
| ZON | COMPLETE | 11/01/2005 | |
| Note: Released By: HHERKERT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/14/2006 |
| REINSPECTION FEE | ¤40.00 | 09/14/2006 |
| REINSPECTION FEE | ¤40.00 | 09/14/2006 |
| REINSPECTION FEE | ¤40.00 | 09/14/2006 |
| REINSPECTION FEE | ¤40.00 | 09/14/2006 |
| REINSPECTION FEE | ¤40.00 | 09/14/2006 |
| REVISION | ¤40.00 | 09/14/2006 |
| SCHOOL BOARD IMPACT FEE RES | ¤3,600.00 | 11/04/2005 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/04/2005 |
| TRANSPORTATION IMPACT FEE3/RES | ¤2,885.00 | 11/04/2005 |
| ADMIN FEE | ¤20.00 | 11/04/2005 |
| ARC HOUSE REVIEW | ¤125.00 | 11/04/2005 |
| BUILDING CODE ADMIN FUND | ¤16.37 | 11/04/2005 |
| ELECTRIC FEE | ¤168.00 | 11/04/2005 |
| FIRE RES IMPACT FEE 4-1-05 | ¤173.47 | 11/04/2005 |
| MECHANICAL FEE | ¤168.00 | 11/04/2005 |
| PERMIT FEE | ¤897.00 | 11/04/2005 |
| PARKS IMPACT FEE 11-2-04 | ¤1,120.91 | 11/04/2005 |
| PLAN CHECK FEE | ¤92.00 | 11/04/2005 |
| PLUMBING FEE | ¤168.00 | 11/04/2005 |
| RADON FEE | ¤16.37 | 11/04/2005 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,810.12 |